Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ore Dilution Versus Mine to Mill Optimisation at KCGM

    By M Spiteri, S Woth, J Caratti, K Henley

    Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation and downstream processing. Dilution of the orebody to some extent is the inevitable result, partic

    Jan 1, 2001

  • AUSIMM
    Wall Control Blasting Practices at BHP Billiton Iron Ore Mt Whaleback

    By C T. Dunbar, P A. Walker, G E. LeJuge

    A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t

    Jan 1, 2001

  • AUSIMM
    The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the Philippines

    By G Maude, R Ayres, R N McLean, N A. Reynolds

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale

    Mar 18, 2015

  • AUSIMM
    Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface Mines

    By J Joy, A Bye, G V. Kizil

    This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s

    Sep 18, 2012

  • AUSIMM
    Strategic and Tactical Geometallurgy – a Systematic Process to Add and Sustain Resource Value

    By N McKay, J Vann, W Ware, P Hodkiewicz, C Morley

    "Geometallurgy is now recognised within the mining industry as an approach that can both maximise value and reduce the risks associated with resource development. The process of spatial ore variabilit

    Jun 15, 2016

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    A quantitative risk assessment tool for geothermal outbursts at Lihir Gold Mine

    By M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr

    Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the

    Nov 29, 2022

  • AUSIMM
    Chromium and Rare Earth Elements Mobility by Sodium-bearing High-temperature Hydrothermal Solution – An Example from Mantle Diopsidite and Crustal Diopsidite

    By N Akizawa, A Tamura, S Arai

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Reaction products between high-temperature hydrothermal solution/uppermost mantle peridotit

    Mar 18, 2015

  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • AUSIMM
    Earthworks or Landforms? Designing for Lease Surrender

    By S J. Henderson

    Over much of Australia, rainfall is highly seasonal and storm-driven. Consequently, operational mines often need extensive earthworks – drains, dams and levees – for protection during the occasional l

    Jun 28, 2016

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    The Effect of Drilling and Blasting Performance on Fragmentation in a Quarry and Time for Loading, Secondary Breakage and Crushing

    By J Seccatore, T Marin, M Cardu, G De Tomi, F Galvão, A Rezende, E Melo

    Small-scale mining operations are characterised by a large variety of equipment availability and a high level of operational flexibility. Mine planning is usually scarce or absent in small quarries in

    Aug 24, 2015

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    Potential TWA changes for gas monitoring instruments are alarming

    By P Aspinall

    Safe work Australia (SWA) has a number of proposed amendments to existing Workplace Exposure Standard (WES) values that may dramatically change how mining workplaces using personal gas monitoring inst

    Apr 16, 2024

  • AUSIMM
    Predicting the Benefit of Gravity Recovery Prior to Flotation

    Batch centrifugal gravity concentrators have become standard equipment in gold grinding circuits for recovery of gravity recoverable gold (GRG). The downstream benefits of installing a gravity circuit

    Aug 1, 2010

  • AUSIMM
    Eight years of ACARP research on rehabilitation of challenging mine sites – practical application in the era PCRPs

    By L McCallum, G Dale, B Silverwood, T Roscoe, A Costin

    The introduction of Progressive Closure and Rehabilitation Plans (PCRPs) in Queensland from 2019 places greater importance on planning and implementation of mine rehabilitation activities. The progres

    Aug 2, 2023

  • AUSIMM
    The use of Chemical and Metallurgical Parameters to Enhance the Economic Value of Kimberlite Resource Models

    By J Stiefenhofer

    "*This is an abstract only*Construction of geological models for kimberlites has historically largely been based on visual volcanic textures and features, with chemical data only collected on an ad-ho

    Sep 29, 2013

  • AUSIMM
    Putting the ‘GEO’ back in front of GEOmetallurgy: importance of early implementation of quantitative mineral system characterisation, classification and modelling

    By W Potma, C Brauhart, S Halley, S Urbisinov, A Scogings

    Truly integrated, quantitative, 3D GEOmetallurgical (or mineral system) characterisation, classification and 3D modelling should provide a cradle to grave unifying link across the exploration and mini

    Nov 21, 2018

  • AUSIMM
    Sustainability in New Projects - Achieving Outcomes Which are Beyond 'Business as Usual'

    Many mining companies aim to integrate sustainability principles into their new projects. There is an intention for improvement, but frequently this results in little more than 'business as usual

    Jun 1, 2010