Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Ore-Deposits of Captain's Flat, New South Wales

    The revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of

    Jan 1, 1941

  • AUSIMM
    Case study of a practicable, risk-based solution in response to new regulatory approaches to Mining Health and Safety using Queensland Recognised Standard 22 (Management Structure for the development and implementation of the SHMS)

    By S Amor, A Beasley

    This paper provides an example of how industry can respond to the implementation of new regulatory approaches to mining risk, health and safety by adopting a robust, practical, software-based approach

    Apr 16, 2024

  • AUSIMM
    Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination Methods

    By S C. Dominy

    Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat

    Sep 5, 2011

  • AUSIMM
    Sensors and Systems for the Measurement of Tunnel Movements During and After Construction

    By W Ward, J Clegg, R Barnes, T Zhong

    This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case

    Sep 17, 2014

  • AUSIMM
    Smoothed Particle Hydrodynamics Modelling of Blast-induced Fracture Processes in Naturally Jointed Rock Medium

    By D Deb, R Pramanik

    This paper presents a generalised methodology in smoothed particle hydrodynamics (SPH) framework to analyse dynamic failure process of rock mass having natural joint under blast-induced stress wave an

    Aug 24, 2015

  • AUSIMM
    An Automated System for Flyrock and Fume Monitoring of Blasts

    By C K. McKenzie, P Popov, B E. Papillon, I Kharitonenko

    Flyrock produced by blasts in surface mining and quarrying is a major hazard that can result in serious injuries or property damage. This paper presents a fully integrated and automated approach for r

    Aug 24, 2015

  • AUSIMM
    Miining Development, the Public Sector and The AusIMM - Issue and Future Directions

    The mining of Australia's rich and diverse mineral resources has been central to the development of the continent by "Europeans" over the past two hundred years. Mining has historically been en

    Jan 1, 1988

  • AUSIMM
    Modelling Intact Rock Strength of Clay-Rich Rocks with Geochemistry at the Simandou Iron Ore Deposit, Guinea, West Africa

    By M Campbell, A Jeffcoate, J-C Vannay, B Perriaux

    Phyllite waste rock at the Simandou Pic de Fon and Oueleba Iron Ore deposits (Guinea, West Africa) variably weather to form clay-rich rocks. This weathering modifies the mineralogical, geochemical and

    Aug 12, 2013

  • AUSIMM
    New Technologies for Measurement of Operator Fatigue Helping to Deliver Improved Operator Health, Safety and Performance at the Mt Keith Operations

    The Mt Keith Mining Alliance operates a fleet of large capacity hydraulic face shovels and more than 40 X 240 t capacity haul trucks to deliver annual production in excess of 40 Mbcm per annum. The Mt

    Jan 1, 2007

  • AUSIMM
    An assessment of battery trolley systems’ performance in surface mines

    By H Bao, M Nehring, M Kizil, P Knights

    The mining sector, a notably energy-intensive industry worldwide, is a major consumer of fossil fuels, leading to significant carbon emissions globally. The move towards electrification, coupled with

    Sep 1, 2024

  • AUSIMM
    Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)

    By G Zhang, I Glacken

    Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p

    May 24, 2023

  • AUSIMM
    Creep properties and energy evolution characteristics of weakly cemented rock under step loading

    By C X. Zhang, W K. Ru, S C. Hu

    To study the creep properties and the energy evolution characteristics of the weakly cemented rock (WCR) in western China, the creep deformation damage law of weakly cemented mudstone (WCM) under grad

    Nov 29, 2022

  • AUSIMM
    Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry?

    By C W. Davis

    Every diesel engine emits approximately 100 million nano diesel particles (nDP) per cubic centimetre of raw exhaust. Each nDP has a diameter of between 50 and 70 nano metres or 1/100th the size of red

    Mar 15, 2021

  • AUSIMM
    Geostatistics and Sample Numbers from an Acid and Metalliferous Drainage Perspective

    By C Linklater, A Garvie, D Kentwell

    Various Australian and international regulatory bodies (Environmental Protection Authority, 2015) require an early assessment of the geochemistry of waste rock. This usually includes estimates of the

    Jun 28, 2016

  • AUSIMM
    Multi-physical field coupling model development and parameter analysis of natural gas hydrate considering mechanical damage

    By Z R. Guo, Y Qiu, X F. Wang

    Mechanical damage leads to the increase of effective stress of sediments, and pore closure hinders the discharge of methane gas. Ignoring the influence of mechanical damage leads to an excessive predi

    Nov 29, 2022

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    The Soft Ground Bored Tunnel Under Sydney Airport

    The New Southern Railway (NSR) involves the excavation of approximately 10 km of single bore tunnel from Tempe Reserve, Tempe, to Prince Alfred Park (PAP). PAP is located just south of Central Railway

    Jan 1, 1999

  • AUSIMM
    Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.

    A new approach to resource estimation at the exploration stage is emerging, based on the application of simple software techniques. The techniques combine the power of interactive graphics with proven

    Jan 1, 1990

  • AUSIMM
    Understanding ore heterogeneity and effective bulk ore sorting using PGNAA/PFTNA

    By S Ferguson, G Noble

    The mining industry is facing economic pressures to treat more challenging and lower grade ore types, as well as pressure relating to environmental impact and social license to operate. Preconcentrati

    Nov 10, 2020

  • AUSIMM
    Structural analysis and modelling in an evolving mineral resources operation

    By N Arrys, A Jani, S Shahin

    Optimising pit slope stability and reducing strip ratio of a mining operation are two key tasks in geotechnical engineering. With a growing demand for minerals and an increasing cost associated with e

    Sep 1, 2024