Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availabilityBy E Shilov, R Dixon, L Tovey
BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit
Nov 29, 2022
-
Forging Ahead - A Collaboration Between the OZ Minerals Prominent Hill Concentrator and Magotteaux to Improve Plant PerformanceBy PáDeáBosscher, A Bruwier, M Weidenbach, C Philippe, T Ly, A Van Den Bosch
In the mining business the cost of grinding media represents up to 40 per cent of the total milling cost and therefore grinding media optimisation has a direct impact on the concentratorsÆ bottom line
Oct 29, 2012
-
Are there differences in size distribution when comparing conventional crushing and HPGR?By I Ritchie, G Lane, C Morley, D Yataco
Marcobre SAC (Marcobre) is developing the Mina Justa project in Peru. The project has a lower grade oxide orebody overlaying the higher grade sulfide orebody. The oxide ore is treated by acid leaching
Sep 11, 2017
-
Grinding Circuit Improvements at Evolution Mining’s Edna May OperationBy D Atheis, S Williams, A Dance, D Taplin
"Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant
Sep 1, 2014
-
Blasthole Cone Sampling Experiments for Iron Ore Flitch MiningBlasthole cone samples are used for grade control in most of the iron ore mines of the Pilbara of Western Australia. This method of sampling is straightforward when the target sampling interval matche
Mar 1, 2010
-
Application of a reinforcement learning AI solution for optimisation of screening shuttles controlBy A Horeth, E Duggan, B Versiani, A Gooch
Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati
Nov 8, 2021
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
Optimum embankment design for a tailings damBy A Fyans, B Ghahreman-Nejad
This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran
Jul 23, 2018
-
Advancements in Condition Monitoring on Mill Drive Trains for Proactive Maintenance and Early Fault Detection PurposesBy T Roesch, M Neurohr, S Stratton
"Dwindling commodity prices are forcing today’s mining operations to increase output. Sometimes the solution is to upgrade the existing infrastructure; however, in most cases it has to be achieved wit
Oct 10, 2016
-
Geometallurgy – Bridging the Gap between Mine and Mill: a Case Study of the DeGrussa Geometallurgy ProgramBy S Robinson, A Turner, R Dale, C Butler
"Sandfire Resources NL- (‘Sandfire’) DeGrussa definitive feasibility study (DFS) identified geometallurgy as a major factor in achieving optimum plant performance at the DeGrussa mine. A geometallurgi
Jun 15, 2016
-
Mechanism analysis and particle flow simulation of water-sand inrush in thin bedrock working faceBy S Li, Y Lei, X Wu, C Ma, W Q. Zhang
The failure of roof of thin bedrock working face under loose aquifer in a coalmine can lead to water-sand inrush disaster. Based on the accident of water-sand inrush in 30108 working face of a mine in
Nov 29, 2022
-
Strain-dependent Stiffness of the Weathered Melbourne FormationBy Z Terzic, M Schult, D Chu, S Macklin
The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be
Sep 17, 2014
-
Research on in situ recovery technology of hot-dip galvanised drossBy X Li, R Chu, X Deng
The hot-dip galvanising industry is the largest consumer of zinc, with over 40 per cent of the world’s total annual production of zinc used for galvanised steel. The dross generated in the hot-dip gal
Jun 19, 2024
-
"A Geometallurgical Proxy for Nickel Laterite Heap Leaching"By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman
"Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long
Jun 15, 2016
-
Above and beyond NPV – determining the life-of-mine from an economic perspectiveBy C Tapia, B Hay
There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin
Aug 2, 2023
-
Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley OperationsBy S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans
A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success
Mar 15, 2021
-
Analysis of Rock Fragmentation and its Effect on Gravity Flow at the Kiruna Sublevel Caving MineBy N Petropoulos and M J Thurley, E Righetti, M Wimmer
Fragmentation in sublevel caving (SLC) is vitally important. Both gravity flow and any downstream processes are affected. Reasonably coarse fragmentation may lead to larger draw bodies (isolated extra
Aug 24, 2015
-
Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum FiltrationBy R Klepper
Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick
Aug 8, 2011
-
A new approach to implement quality assurance and quality control to technological innovations – quality of spectral data capture and processes in the minerals industryBy M Haest, O Dominguez, D Mittrup
Technological innovations and emerging analytical capabilities are transforming the way drill samples are analysed, with real-time mineralogical analysis made possible. In addition, new business/techn
May 9, 2017
-
The Differences Between the Iron Formations of Grpo Para Group and Greenstone Belt Andorinhas in the Carajas Mineral Province, Para State, BrazilBy H F. Galbiatti, G J. I dos Santos, A de C Zapparoli
The Grao Para and Rio Maria greenstone banded iron formations (BIFs), within the Carajas mineral province, exhibit distinct lithological and petrographic fabrics, together with pronounced differences
Jan 1, 2009