Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Retreatment/Flotation Rationalisation at Renison

    Revised throughput rates, as a result of current mining methods and tight controls on mine dilution, have dictated a change in metallurgical philosophy at Renison Limited. Emphasis on throughput cap

    Jan 1, 1991

  • AUSIMM
    Integrating Environmental Factors into Mining Projects (591b660d-e8ad-4113-a4fb-e72d8a203993)

    There are a number of examples of how environmental factors have been integrated into the water management aspects of mining projects. The Kingston Lignite project in South Australia, Pine Creek Gold

    Jan 1, 1988

  • AUSIMM
    Prediction of Strata Caving Characteristics and its Impact on Longwall Operation

    By Nemick JA

    Recent advances in computer simulation together with field measurements of caving and microseismic activity about longwall panels, has allowed a much better understanding of the caving process and the

    Jan 1, 1998

  • AUSIMM
    Investigations on the Influence of Particle Size in Flotation

    By Hoberg H, Schneider FU

    Flotation tests were conducted with galena, quartz and with synthetic mixtures of the two, in different ranges of grain size, and with different process parameter variants. Physico-chemical analyses

    Jan 1, 1993

  • AUSIMM
    Practical Conditional Simulation for Geologists and Mining Engineers

    By Coombes J, Richards W. L

    The objective of this paper is to illustrate, in a practical way, how both geologists and mining engineers can use conditional simulation to add value to their decisions. Inherent assumptions, requi

    Jan 1, 1998

  • AUSIMM
    Resource and Geoscience Modelling for Exploration and Land Use Planning in NSW: The Mineral Resource Audit

    By Barnes R. G, Agostini A, Lewis P. C

    The Mineral Resources Audit is a five-year Program established to produce a comprehensive and objective assessment of the mineral resources of New South Wales, including prospective resources. The

    Jan 1, 1995

  • AUSIMM
    The Discovery, Exploration and Future Development of the Didipio Project

    In a country richly endowed in mineral wealth, Climax Arintco Mining Corporation's ICAMC) Dinkidi porphyry Au-Cu deposit in Nueva Vizcaya, Philippines, represents the most significant mineral dis

    Jan 1, 1997

  • AUSIMM
    Retreat Mining Methane Drainage

    From the ventilation aspect, there is a basic difference between advancing and ezreating longwall layouts. Particular rroblems with retreating, using differing mining methods and layouts include hi

    Jan 1, 1982

  • AUSIMM
    Ancestral Pacific Margins in Eastern Australia Some Lessons from the Modern Pacific Rim

    By Mallett CW, Hammond RL

    Geological maps of the Pacific Rim recently published by the Circum-Pacific Council for Energy and Mineral Resources have provided a useful perspective from which to view modern plate interaction

    Jan 1, 1987

  • AUSIMM
    Walhalla and the Long Tunnel Extended Gold Mine: An Historical Review

    By Roddick F

    From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gipps- land mountains, the Long Tunnel Extended Gold Mining Company produced 13,695kg of gold, which at 1982 prices

    Jan 1, 1982

  • AUSIMM
    Island Arc Geodynamics: A Model with Implications for Seismic and Magmatic Processes

    By Demin SS

    Slow seismotectonic movements along the in-clined deep fault zone under the compressional horizontal stresses are supposed to be the prin-cipal mechanism controlling the structure and processes in the

    Jan 1, 1990

  • AUSIMM
    San Vicenter Zinc-Lead Rhythmite Deposit, Peru: A Mississippi Tejada Rospihloisi, Krouse H.B.

    By Rospigliosi RT, Krouse HR

    The San Vicente stratabound zinc-lead rhythmite deposit, Peru, is hosted in carbonates of the Late Triassic - Early Jurassic Pucara Group. These strata were deposited in a large, shallow water, carbon

    Jan 1, 1990

  • AUSIMM
    Cathodoluminescence, Laser Ablasion Inductively Coupled Plasma Mass Spectrometry, Electron Probe Microanalysis and Electron Paramagnetic Resonance Analyses of Natural Sphalerite

    By E ¦iftti, A Koenig

    Natural sphalerite associated with copper, silver, lead-zinc, tin and tungsten deposits from various world-famous mineral deposits have been studied by cathodoluminescence (CL), laser ablasion inducti

    Jan 1, 2008

  • AUSIMM
    Orebody Definition and Optimisation

    The importance of orebody definition and optimisation in project development cannot be overstated. Inappropriate orebody definition is the single most important reason for project under performance

    Jan 1, 1997

  • AUSIMM
    The Application of the Environmental Assessment Prodedures to Licensing for Minerals, Petroleum and Geothermal Energy

    By Thorburn D

    This paper reviews the history of environmental assessment in New Zealand with reference to mineral developments. Emphasis is given to larger more controversial projects particularly metal mines. The

    Jan 1, 1990

  • AUSIMM
    The Application of Computer Modelling for Blasting and Flow in Sublevel Caving Operations

    By P Dare-Bryan

    Many mines have an interest in improving fragmentation at their sublevel caving operations in order to produce better ore recovery, lower dilution and less overbreak. The primary requirement for the e

    Jan 1, 2005

  • AUSIMM
    The Safe Use of Controlled Recirculation Techniques in the Ventilation of United Kingdom Coal Mines

    By Mitchell D

    In recent years the need to provide increased ventilation to improve environmental conditions rather than to dilute firedamp has led to increasing interest in the use of recirculation. Present UK

    Jan 1, 1988

  • AUSIMM
    Occurrence of Outbursts at West Cliff Colliery

    By Griffith L, Lama RD

    West Cliff Colliery mines Bulli Seam occurring at a depth of approximately 480 m. The Seam is intersected by a number of small shear zones and faults. While the faults have caused displacement of t

    Jan 1, 1980

  • AUSIMM
    Three-Dimensional Modelling of Highwall Stability

    This paper describes the application of a three-dimensional finite element modelling tool to help assess the stability of a highwall at a Central Queensland mine following the weakening of its base

    Jan 1, 1995

  • AUSIMM
    Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future Trends

    By Duncan GR

    Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es

    Jan 1, 1988