Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Modelling of height of connective fractures during longwall mining

    By D Adhikary, M Khanal, B Poulsen, H Guo

    During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer

    Nov 30, 2018

  • AUSIMM
    Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine (d53b2c09-d9ab-48b2-94c6-0c6f856d783f)

    By Bawden WF, Paynter JT

    This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxia

    Jan 1, 1998

  • AUSIMM
    Selective Ion Flotation of Gold from Alkaline Cyanide Solutions

    By Leahy G. J, Moxon N. T, Nicol S. K

    Experimental work is described in which extremely dilute aurocyanide liquors are treated with novel surface-active complexing agents to produce a hydrophobic aurocyanide species. Subsequent aeration

    Jan 1, 1991

  • AUSIMM
    New Mineralisation and Alteration Styles at the Porgera Gold Deposit, Papua New Guinea

    By J P. Richards, M D. Johnston

    The Porgera gold mine, located in the highlands of Papua New Guinea, produced 7.7 Moz of gold between 1990 and 1998. Reserves are estimated to be 12 Moz of Au. The deposit is associated with 6 Ma-old

    Jan 1, 1999

  • AUSIMM
    Shaft Sinking at the Cassidy Shaft Mount Charlotte

    By Doyle P, Mulroney D

    The Cassidy Shaft was sunk to access the Mount Charlotte and Reward Orebodies below the Flanagan Fault. The 1,184m deep shaft is concrete lined to 6.5m diameter for its full depth. The initial 590m wa

    Jan 1, 1985

  • AUSIMM
    The Sullivan Concentrator ù The Last (and Best) Thirty Years

    The optimal production of the metals needed by society is best achieved by a close synergy between concentrate production and smelting. For over 75 years commencing in 1923, such a close relationship

    Jan 1, 2005

  • AUSIMM
    Flotation Separation of Scheelite from Calcite Using Alkylated 8-Hydroxyquinolines as Modifier

    By Recepoglu O, Tolun R, Yavasoglu N, Bulutcu AN

    Scheelite was floated from a low-grade (0.28 per cent W03) calcitic (96.30 per cent CaCO3) scheelite ore using oleoyl sarcosine as collector and alkylated 8-hydroxyquinoline as modifier. Compared to

    Jan 1, 1993

  • AUSIMM
    The Use of Controlled Recirculation to Reduce Heating Costs in Canada

    By McHaina D. M, Hardcastle S. G

    A description is given of an investigation into the feasibility of using controlled recirculation of warm exhaust air into the cold intake air of underground mines during winter. Canadian mines ca

    Jan 1, 1988

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines

    By Liu Wenyong, Huang Yucheng, Yang Ba

    High-water rapid-solidifying material, called æhigh-water materialÆ, is a new material developed by the authors over many years. The material can solidify nine times its volume of water into solid. Th

    Jan 1, 1998

  • AUSIMM
    Evaluating the Inclusion of the Implementation Variability into Fragmentation Modelling

    By H Parra, D Zenteno

    Fragmentation modelling has been in use in the mining industry for a long time; however, there are still some aspects to tackle with regard to its use for strategic/planning and day-to-day purposes.On

    Aug 24, 2015

  • AUSIMM
    Economic Geology of the Digger Rocks Nickel Deposit, Forrestania, Western Australia

    By Cotton R. E, Cox R

    Digger Rocks is one of several nickel-bearing sulphide deposits localised within komaLiitic volcanics of the Forrestania Greenstone Bell within the Archaean YiIgam Block of Western Australia. Explorat

    Jan 1, 1992

  • AUSIMM
    Online FTIR analysis for improved efficiency in alumina production

    By K Haroon, J D. Speed, S P. Wood

    Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d

    Aug 24, 2022

  • AUSIMM
    Modelling Cohesion and Adhesion of Wet, Sticky Iron Ores in Discrete Element Modelling for Material Handling Processes

    By K Williams, T Donohue, W Chen, T Roessler, A Katterfeld

    Wet sticky iron ore poses particular difficulties in every aspect of the material handling process. Material hang-ups in bins, pipes and chutes; carry-back and spillage due to insufficient belt cleani

    Jul 13, 2015

  • AUSIMM
    Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo

    By Wright R. J

    The Commission called tenders for a four boom hydraulic jumbo, plus basket, on an art- iculated carrier in Sept. 1977. Atlas Copco submitted the successful tender in Jan. 1978 for the supply of a th

    Jan 1, 1981

  • AUSIMM
    Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs

    By Mogi G, Akaike A, Yamaguchi U

    A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met

    Jan 1, 1995

  • AUSIMM
    Description of New Plant at South Mine, Broken Hill

    By Cunningham J. C

    JUST prior to the war the Broken Hill South Ltd: raised, on the average, 6628 tons of ore per week, all of which was crushed and treated in the 4-section gravity mill and the slime flotation plant, fo

    Jan 1, 1921

  • AUSIMM
    Grade Control Review at Boddington Gold Mine, SW Region, WA

    The Boddington Gold Mine orebody is a large tonnage, low grade gold deposit located within the Archaean Saddleback greenstone belt within the south-western region of Western Australia. The orebody con

    Jan 1, 1993

  • AUSIMM
    Sintering characteristics of iron ore blends containing iron ore concentrates

    By H Han, d S. Hapugoda, L Lu

    With the recent rapid development of Chinese steel industry, the world iron ore resources of good quality are depleting rapidly. As a result, iron ore deposits of lower quality have been or are being

    Sep 18, 2023

  • AUSIMM
    Classification and Control of Hazards in Underground Mines in Poland

    By M Malec, J Szczerbinski

    Hazards in underground mines are concomitant with the mining of mineral deposits and have their source in a minerÆs work environment. The authors of the paper have undertaken a trial classification of

    Jan 1, 1999

  • AUSIMM
    Quantifying the Opportunity Cost of New Zealand's Mineral Potential

    By A B. Christie, R Barker

    Recent studies carried out to support the development of a strategy for the New Zealand mineral industry by the NZ Minerals Industry Association have included investigations of mineral potential, and

    Jan 1, 2002