Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLYMorning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years
Aug 1, 2010
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Using Reverse Circulation Drilling to Improve Sampling in a Complex Underground Gold Operation – An Innovative Approach to Underground Grade Control at the Sunrise Dam Mine, Western AustraliaBy F Clark, J T. Carswell
Ore definition for final stope planning is often a challenging prospect in underground (UG) gold mines which exhibit high geological and grade variability. Unlike the grade control (GC) scenario in an
Aug 18, 2014
-
Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation OutcomesBy T Baumgartl, J Burgess, B Emmerton, P D. Erskine
Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result
Jun 28, 2016
-
Considerations for the design and support of underground portalsBy M P. Sandy, R M. Stephenson
Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu
Mar 15, 2021
-
Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to MiningBy J Joy, A Bye, G V. Kizil
This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame
Jul 10, 2012
-
PanAust Limited’s approach to mine waste and tailings stewardshipBy L P. Trout, D G. Reid
PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem
Jul 23, 2018
-
The coalmine roof rating – an update in its calculation and mechanistically why it worksBy M Colwell
The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g
Nov 29, 2022
-
A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century MineBy R Wynn, N Stoitis, R A. Lauten, H Liang
At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a
Sep 1, 2014
-
Exploration and Resource Modelling of the Goondicum Industrial Minerals Project, Central Queensland, AustraliaBy H Hoogvliet
The Goondicum Crater industrial minerals deposit is located about 30 km east of Monto, Central Queensland, Australia. Early exploration programs in the 1990s found alluvial ilmenite along the banks of
Oct 5, 2011
-
The North Strathfield Rail Underpass – Driven Tunnel Design and ConstructionBy E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares
The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,
Sep 17, 2014
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case StudyBy P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Exploration and Innovation – The Discovery and Evolution of the 2 Moz Vogue Gold Resource, Sunrise Dam Gold Mine, Western AustraliaBy T Blenkinsop, A Jenkins, H Moore, L Fisher, N Oliver, J Cleverley, M Nugus, J McLellan, J Hill, N Brunacci
The 2 Moz Vogue mineral resource is a recent discovery at the Sunrise Dam gold mine (SDGM), lying approximately 600 m vertically below the Sunrise Dam open pit. Unlike most other lodes, which are domi
Aug 18, 2014
-
Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West AfricaBy G du Toit, P L. Gillot, M Swanepoel
Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of
Sep 1, 2014
-
Correlated Valuation MethodologyBy E C. Holloway
"The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both
Mar 8, 2016
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
Continuous Carbon Concentration Measurement at Newmont Boddington GoldBy C McCamley
"The requisite for maintaining optimal carbon concentration levels in a carbon-in-leach (CIL) circuit is of paramount importance in the prevention of gold losses. The process’s ability to recover gold
Oct 10, 2016
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014
-
Belt Conveyor Transport SystemsThe demands of the economy require larger manufacturing facilities using greater quantit- ies of raw materials which must be mined, handl- ed, stockpiled and recovered with efficiency and dependabili
Jan 1, 1976
-
Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selectionBy G Burton, S Fityus, J Li, S Vaughan, D Payne
Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the
Jul 1, 2021