Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY

    Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years

    Aug 1, 2010

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Using Reverse Circulation Drilling to Improve Sampling in a Complex Underground Gold Operation – An Innovative Approach to Underground Grade Control at the Sunrise Dam Mine, Western Australia

    By F Clark, J T. Carswell

    Ore definition for final stope planning is often a challenging prospect in underground (UG) gold mines which exhibit high geological and grade variability. Unlike the grade control (GC) scenario in an

    Aug 18, 2014

  • AUSIMM
    Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation Outcomes

    By T Baumgartl, J Burgess, B Emmerton, P D. Erskine

    Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result

    Jun 28, 2016

  • AUSIMM
    Considerations for the design and support of underground portals

    By M P. Sandy, R M. Stephenson

    Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu

    Mar 15, 2021

  • AUSIMM
    Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to Mining

    By J Joy, A Bye, G V. Kizil

    This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame

    Jul 10, 2012

  • AUSIMM
    PanAust Limited’s approach to mine waste and tailings stewardship

    By L P. Trout, D G. Reid

    PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem

    Jul 23, 2018

  • AUSIMM
    The coalmine roof rating – an update in its calculation and mechanistically why it works

    By M Colwell

    The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g

    Nov 29, 2022

  • AUSIMM
    A Change in Graphite Depressant to Improve the Recovery of Zinc at MMG Century Mine

    By R Wynn, N Stoitis, R A. Lauten, H Liang

    At the Century mine in North West Queensland, MMG produces lead and zinc concentrates. The current production rate is close to 500 000 t of zinc per annum. Graphite is the main gangue in the orebody a

    Sep 1, 2014

  • AUSIMM
    Exploration and Resource Modelling of the Goondicum Industrial Minerals Project, Central Queensland, Australia

    By H Hoogvliet

    The Goondicum Crater industrial minerals deposit is located about 30 km east of Monto, Central Queensland, Australia. Early exploration programs in the 1990s found alluvial ilmenite along the banks of

    Oct 5, 2011

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • AUSIMM
    Exploration and Innovation – The Discovery and Evolution of the 2 Moz Vogue Gold Resource, Sunrise Dam Gold Mine, Western Australia

    By T Blenkinsop, A Jenkins, H Moore, L Fisher, N Oliver, J Cleverley, M Nugus, J McLellan, J Hill, N Brunacci

    The 2 Moz Vogue mineral resource is a recent discovery at the Sunrise Dam gold mine (SDGM), lying approximately 600 m vertically below the Sunrise Dam open pit. Unlike most other lodes, which are domi

    Aug 18, 2014

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014

  • AUSIMM
    Correlated Valuation Methodology

    By E C. Holloway

    "The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both

    Mar 8, 2016

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    Continuous Carbon Concentration Measurement at Newmont Boddington Gold

    By C McCamley

    "The requisite for maintaining optimal carbon concentration levels in a carbon-in-leach (CIL) circuit is of paramount importance in the prevention of gold losses. The process’s ability to recover gold

    Oct 10, 2016

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Belt Conveyor Transport Systems

    The demands of the economy require larger manufacturing facilities using greater quantit- ies of raw materials which must be mined, handl- ed, stockpiled and recovered with efficiency and dependabili

    Jan 1, 1976

  • AUSIMM
    Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selection

    By G Burton, S Fityus, J Li, S Vaughan, D Payne

    Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the

    Jul 1, 2021