Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • AUSIMM
    A Day in the Life of a Mine Worker in 2025

    By V Srinivasan, P Knights, C T. Farrelly

    By 2025, with the widespread industry adoption of remote operation centres and advanced analytics, mining companies will find themselves making better, more informed decisions across the value chain.

    Jan 1, 2008

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    Eliminating Unidentified Misfires at Xstrata ZincÆs Open Pits Through the Application of Electronic Detonators

    By R Small, S Combrinck, R Lindsay

    Maintaining your competitive edge in the growing Australian mining sector today is an arduous task. With an ever increasing demand to extract more ore, safely, complete visibility throughout the blast

    Sep 18, 2012

  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation Plant

    By J Zhou

    This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl

    Sep 26, 2011

  • AUSIMM
    An empirical system for primary and secondary support in US coalmines

    By C Mark, Z Agioutantis

    This paper presents an empirical design methodology that is based on successful US roof support systems using both primary and secondary support in coal mining entries and intersections. The recent na

    Nov 29, 2022

  • AUSIMM
    Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite Concentrator

    By C Jenkins, M Mativenga, C Stanton, J Gerber

    In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra

    Jul 13, 2015

  • AUSIMM
    A machine learning model to predict non-metallic inclusion dissolution in the metallurgical slag

    By C Xuan, J H. Park, Q Wang, C Shen, D Kumar, W Mu

    Dissolution of non-metallic inclusions in the metallurgical slag is of vital importance for cleanliness control of the steel manufacturing. With the development of high temperature confocal laser scan

    Jun 19, 2024

  • AUSIMM
    Practical Considerations when using Auxiliary Axial Flow Fans as a Primary Mine Fan

    By D Roughsedge, J van der Sandt, L van den Berg

    Axial flow fans are commonly used as auxiliary fans in underground mines to supply air to development headings. As diesel dilution requirements increase the fans used in conjunction with ventilation b

    Jul 1, 2013

  • AUSIMM
    Targeting dilatancy in upstream construction

    By A Simmons, J Chan, A Li, Q Gu, D M. Brett

    The paper presents an example of field density achievements using thin layer deposition and solar drying and compares this with compaction data from laboratory testing and field trials of mechanical d

    Jul 1, 2021

  • AUSIMM
    Can robots break the drill and blast bottleneck in underground roadway development in hard rock?

    By M Berner, N A. Sifferlinger, E Fimbinger

    Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p

    Sep 1, 2024

  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022

  • AUSIMM
    Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri Mine

    By M Brady, O Salisbury, C Claassen, B Beamish, H Baxter

    Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action resp

    Aug 31, 2015

  • AUSIMM
    Characterisation and assessment of B2O3 added LF slag

    By S Kakara, A Kamaraj, S S. Varanasi, B V. R Mandalika, M B. Shaik

    The properties of top slags play a very important role in secondary steelmaking. Fluxes should be chosen based on the ladle furnace (LF) slag requirements like viscosity, melting temperature, sulfide

    Aug 21, 2024

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • AUSIMM
    Analysis of premature failure of rock bolts and cable bolts failed in underground coal mines

    By P Craig, A Crosky, H Ramandi, S Saydam, H Chen

    Frequency of reports on premature failure of rock bolts and cable bolts have increased in past two decades. Such a failure threatens both the safety of underground mine workers and the economic viabil

    Nov 30, 2018

  • AUSIMM
    Screen Media Aperture Size Measurement Using MetsoÆs Screen Tracker

    By G van Niekerk, M Wortley

    Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.

    Sep 26, 2011

  • AUSIMM
    Some considerations on rock slope stability issues in Afghanistan with an emphasis on Kandahar Region

    By A B. Jahed, Ö Aydan, T Ito

    In this study, the authors compiled some case history data and present some typical examples of rock slope stability issues in Afghanistan with a special emphasis on Kandahar region and categorise roc

    Nov 29, 2022