Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
OFR-67(2)-75 Characterization Of The Structural Behavior Of Rock Masses - Appendix C - An Alternative Structural Model For The Characterization Of Rock Masses Volume II ? 1. Introduction ? 1.1 GeneralBy L. R. Herrmann
The most fundamental feature of fracture is that it involves separation. Such separation can arise by either separation of molecules, more or less along the line joining their centers (tension), or by
Jan 1, 2012
-
Extension of the main ventilation system at LKABs Kiruna Mine for the new main haulage level 1365 mBy L. Mukka
The existing main mine ventilation system for the production areas to the Kiruna mine was constructed during the period 1994-1996 and extended with 4 more shafts, including fan stations, for the sea o
Jan 1, 2009
-
Broadening Engineering CurriculaBy C. L. Dake
AN insistent and steadily growing demand is evident for the broadening of undergraduate curricula in engineering. Among suggested additions are training in public speaking, report writing, business la
Jan 1, 1934
-
Olympic history to be made with medals provided by Teck ResourcesCanadian mining giant Teck Resources Ltd. will be the exclusive supplier of the metals used in the production of the more than 1,000 medals to be awarded at the Vancouver 2010 Olympic and Paralympic W
Jan 1, 2010
-
Analysis Of Failure Modes For Fully Grouted Resin BoltsBy K. Heasley, A. Yassien, A. Khair, S. Peng
There are three major components of a fully grouted roof bolt which primarily determine its ability to develop and sustain load: the steel rebar, the resin annulus, and the rock/grout interface. The u
Jan 1, 2004
-
OFR-124(2)-81 Longwall Subsidence Case History Number 2 - Northern Appalachian Coal RegionBy Larry R. Powell
As part of the Bureau of Mines effort to establish a comprehensive subsidence data base for subsidence technology development, subsidence and related data are being compiled for various mining, geolog
Jan 1, 1981
-
The Search for Profitability with Large Low Grade AlluvialsThis paper sets out to discuss how alluvials - particularly mineral sands, tin and gold have adjusted to meet the problems of lower grade and more difficult physical political and economic conditions.
Jan 1, 1996
-
Some Tax Considerations In Mill DesignBy G. T. Swanby
Members of AIME, I read to you now a portion of a very fine business letter which we received several years ago. This letter originated in Rangoon, Burma, and reads in part: "Rest assured, if your
Jan 1, 1965
-
The Use of 3-D Computer Techniques for Optimal Resource Assessment and Mining - Greymouth Coal LimitedA 3-D computerised model of the southern part of Greymouth Coal Limited's Coal Mining Licence area has recently been completed. This model, and associated 3-D CAD tools, has/is being used to opti
Jan 1, 1996
-
Applied Geomechanics for Support Design in German Deep Coal MinesBy Holger Witthaus
Beside the traditional geomechanical evaluation methods the geotechnical parameters are recognized as important facts of the planning work for multiple seam mining. Standards for applied monitoring an
Jan 1, 2006
-
Mechanism of Slag and Matte Formation in Copper Flash SmeltingBy Zhuo Chen, Jun Zhou, Jiemin Zhou
Samples of the reacting suspension particles were taken from the reaction shaft of a commercial flash furnace at different heights. The processes of matte and slag formation and morphology of the samp
Jan 1, 2019
-
"Russia's Mineral Potential" CriticizedBy Norman C. Stines
Russia's mineral potential is a secret that has been effectively kept by the Iron Curtain. There is no conclusive data and because of its extreme importance to the Free World, the subject is grea
Jan 11, 1951
-
Automated Real-Time Elementary Analysis of Drill Dust using LIBS TechnologyBy Karl Nienhaus
The BGMR has developed a method for an online-analysis during drilling processes in cooperation with Fraunhofer Institute for Laser Technology in Aachen and various industrial partners. This allows fo
Oct 1, 2009
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines LimitedBy P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984
-
Characteristics of Cathodic Reduction of Oxygen on Gold ElectrodeBy Yongbin Yang
Cathodic reduction of oxygen is a process involved in many fields. As is well known, the mechanism of oxygen reduction usually varies considerably with electrode substrates. In this paper, cathodic re
Jan 1, 2010
-
Stratigraphic Relationships Between Stratiform Polymetallic Base Metal Deposits Within the Mount Isa Inlier, NW Queensland, AustraliaBy K Shannon, A Shaw
The Hilton and George Fisher deposits occur 22 and 24 km north of Mount Isa, NW Qld, Australia respectively. Both deposits occur as deformed Proterozoic, sediment hosted, stratiform orebodies hosting
Jan 1, 2002
-
Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, OntarioBy A. C. Wilson
In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu
May 1, 2003
-
Policy to Practice: Strategic Environmental Assessment in the Real WorldBy F. M. McEvoy, E. J. Steadman, R. Murfin
In England, the provision of aggregate is determined by the historical relationship between construction and aggregate consumption. This approach does not necessarily lead to sustainable decision-maki
Jan 1, 2005
-
Air overpressure Prediction Equation for Construction BlastingBy Calvin Konya, Anthony Konya
State and Federal construction specifications require the Blasting Contractor to prepare a Master Blasting Plan which is reviewed by the Owner’s Representative. The Master Blasting Plan requires the
Jan 1, 2015
-
Better Flowsheeting with Modern Process MineralogyBy Norman O. Lotter
The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i
Jan 1, 2011