Search Documents

  • ISEE
    Demonstrating Competence from Charge Hands to Chartered Engineers

    By Ken Cross

    This paper aims to demonstrate that explosives organizations and workers have a legal, moral and financial duty to be able to demonstrate their competence when required, and how that may be achieved a

    Jan 1, 2013

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • CIM
    Narrow-vein Mining Experiences at the Ashanti Mine: A Case Study

    By Fidelis T. Suorineni

    The Ashanti mine, located in Obusai, Ghana, West Africa, has been in production for over 100 years, and is currently the second largest single gold producer in Africa. The mine covers a concession are

    Oct 1, 2001

  • CIM
    The Midas Pond Gold Prospect, Victoria Lake Group, Central Newfoundland: A Mesothermal Quartz Vein System with Epithermal Characteristics

    By Derek H. C. Wilton, David T. W. Evans

    "Abstract - The Midas Pond gold prospect, central Newfoundland, is hosted by sheared and altered felsic and mafic pyroclastic rocks of the Tulks Hill volcanics, Victoria Lake Group, and has been trenc

    Jan 1, 2000

  • AUSIMM
    The Tifalmin Porphyry Copper Gold District, Star Mountains, Western Papua New Guinea

    By L D. Queen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Tifalmin porphyry copper district is located in the Star Mountains roughly 35 km north-

    Mar 18, 2015

  • NIOSH
    OFR-35-85 Productivity Of Parent Materials On Mined Prime Farmlands Using Alternative Sources Of Organic Materials Compared To Topsoil Replacement

    By J. H. Jones

    The original term of grant No. 1115174 was September 1980 through December 1983. An extended progress report, covering this time period, was forwarded to the Bureau of Hines in January 1984. The p

    Jan 1, 1985

  • SME-ICGCM
    A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face

    By H. C. Li

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid

    Jan 1, 1992

  • DFI
    What Causes Piles To Penetrate - Introduction

    By George G. Goble

    In the middle of the nineteenth century, the dynamic formula appeared as a description of pile penetration during impact driving. The simplicity of use of the formula combined with the power of the en

    Jan 1, 1995

  • SME
    Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel Project

    By Faruk Oksuz, Phillip L. Covell, Martin Doll

    A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200

    Jan 1, 2007

  • NIOSH
    MLA 78-87 - Mineral Resources Of The Jordan Craters Study Area, Malheur County, Oregon ? Summary

    By J. Mitchell Linne

    In 1986 at the request of Bureau of Land Management, the U.S. Bureau of Mines studied 23,225 acres of the 27,980-acre Jordan Craters Wilderness Study Area (OR-003-128) in order to evaluate its identif

    Jan 1, 1987

  • TMS
    Preliminary Research on Preparation Al-Si-Ti Alloy With Aluminum Ash as Electrolysis Materials

    By Qingsheng Liu

    A new method of recycling aluminum dross for preparation Al-Si-Ti alloy was studied in this paper. This was carried out in two processes. first the aluminum doss was pretreated by leaching and calcini

    Jan 1, 2010

  • NIOSH
    OFR-52-77 Alternate Conveyor Design For Mine Machinery

    By James H. Snyder

    This final report presents results of a program to develop a new conveyor system, adaptable to existing miners or loaders, which reduces the noise level to 90 dBA without reducing machine performance.

    Jan 1, 1976

  • NIOSH
    RI 3819 Reduction of Iron Ore in Clay & Steel Containers

    By J. P. Walker

    "INTRODUCTION Sponge iron has been made commercially since 1912 at a Swedish ceramic plant; and the product, known as Swedish disk-type nagger sponge iron, has an excellent reputation as a superior fu

    Sep 1, 1945

  • CIM
    Benefication of Low Grade Ore at the Detour Lake Mine

    "The Detour Lake Mine is located in northeastern, Ontario, approximately 300 kilometres northest of Timmins and 185 kilometres by road northeast of Cochrane. The mill processes a free milling gold or

    Jan 1, 2016

  • CIM
    Welcome to Newfoundland

    By Robert B. Parsons

    "The Canadian mining industry is not off to a good start in the 1993/94 budget season. Of the five provinces and territories to table budgets as of March 31, 1993, the industry's scorecard shows:

    Jan 1, 1993

  • SME
    Crud Processing Improvements Using ACORGA® CB - 1000 Crud Busting Reagent

    By T. McCallum

    Crud is a common concern in SX processes and is formed as a complex solid stabilized emulsion of aqueous and organic.1,3 Crud formation is highly dependent on the amount of solids entering the circuit

    Feb 27, 2013

  • NIOSH
    RI 4502 Report Of Research And Technologic Work On Explosives, Explosions, And Flames Fiscal Years 1947 And 1948

    By Bernard Lewis

    This report on the research and technical studies conducted by the Explosives Branch of the Bureau of Mines covers the 2-year period July 1, 1946, to June 30, 1948. A report for the fiscal year 1947 w

    Jan 1, 1949

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • AIME
    Minerals Beneficiation - Tailing Disposal at the Morenci Concentrator

    By P. F. Allen

    WITH capacity of 51,000 tpd, the Morenci concentrator produces approximately 49,000 tons of tailing for final deposition. Disposal involves distribution of thickened tailing to dams in such a manner t

    Jan 1, 1957

  • SME-ICGCM
    Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines

    By Ghassan Skybey

    Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages

    Jan 1, 1995