Search Documents

  • SAIMM
    Managing The Geotechnical Risk Associated With High And Low Walls At Anglo Coal?s Open Pit Mines. - Synopsis

    By Gift Makusha, Dave Minney

    Anglo Coal South Africa mines coal for both the domestic and export market using open cast and strip mining methods. To establish a mine, a process is set in place to gather ever increasing amounts

    Jan 1, 2006

  • IOM3
    Distribution and genesis of some epizonal Zn-Pb and Au provinces in the Carpathian-Balkan region

    By A. H. G. Mitchell

    Most, if not all, of the six recognised post-Cretaceous, predominantly andesitic mineralised belts in the region are now thought to be subduction-related magmatic arcs. The Inner Carpathian arc and th

    Aug 1, 1996

  • NIOSH
    Chest Transmissibility Characteristics During Exposure To Single - And Combined-Axis Vibration - Introduction

    By Stephen E. Mosher, Suzanne D. Smith

    Ground, air, and water vehicles can expose humans to substantial multi-axis vibration. Multiple input/multiple output relationships or models exist for estimating frequency response functions of line

    Jan 6, 2006

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • NIOSH
    IC 8399 Computer Usage For Evaluation Of Design Parameters And Cost Of Heat Exchangers - With No Change In Phase And Tube Side Pumping Costs As Prime Parameters

    By P. R. Jones

    A computer program was written for design and cost of a shell and tube heat exchanger in which the total cost, which includes annual fixed charges and annual operating costs, was minimized. The progra

    Jan 1, 1969

  • NIOSH
    OFR-129-76 Ignition Suppression Device

    By Will B. Jamison

    An ignition detection and suppression system was developed under the scope of this contract. The objective of this machine mounted system was to detect flames caused by frictional sparking from the cu

    Jan 1, 1976

  • ISEE
    The Challenge of Precise Measurement of Precision

    By John Watson, Jay Rodgers

    The world of blasting and explosive use continues to evolve into one which relies heavily on measurement, quantification, process control, and information feedback as a means of contributing to operat

    Jan 1, 1998

  • NIOSH
    IC 7016 Smoke Abatement - Selections From Papers By O. P. Hood ? Keeping The Atmosphere Clean

    WHY IS IT that smoke-abatement efforts do not bring more satisfactory results? The main reason is an incorrect estimate of the kind and size of the job. When an industrial community realizes that k

    Jan 1, 1938

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • SAIMM
    Upgrade Of Multi-Phase Separation Vessels Utilising Cold Weld Polymer Technology

    By David J. Blackwell

    The challenge; to design production facilities and in particular separation equipment which have the ability to deal effectively with the ever changing composition of well fluids, over the life time o

    Jan 1, 2006

  • NIOSH
    RI 7070 New England Beryllium Investigations

    By William R. Barton

    Sampling to determine development potential of beryllium deposits was conducted at 31 New England localities. A total of 54 additional areas where the geochemical environment appeared favorable were s

    Jan 1, 1968

  • NIOSH
    IC 7999 Research And Technologic Work On Explosives, Explosions, And Flames, Fiscal Years 1957 And 1958 ? Introduction And Summary

    By Ruth F. Brinkley

    This report is the 18th of a series of reports originally issued annually, and more recently bienially, to acquaint the public with the work of the Federal Bureau of Mines in explosives technology. Pa

    Jan 1, 1961

  • AUSIMM
    A Description of the Iron Ore Industry at Iron Knob and Whyalla

    The whole of the iron ore required by the Broken Hill Proprietary Company Limited at the Newcastle Steel Works, and Australian Iron and Steel Limited, at Hoskins' Kembla Works, is drawn from the

    Jan 1, 1937

  • CIM
    A Standards Based Approach to Mobile Equipment Data

    By Peter Cunningham

    General Description of Projects The objective is to streamline data transfer within our Process Control and Business Systems for the purposes of tracking actual production, reducing manual record kee

    May 1, 2013

  • SME
    San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield

    By Brett Campbell

    The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa

    Jan 1, 2008

  • AUSIMM
    Open Pit Mine Slope Engineering: A 2002 Perspective

    In most surface mining operations, overall project economics is driven to a significant extent by the slope angles that can be achieved within the rock masses present. This is particularly true of pre

    Jan 1, 2002

  • AUSIMM
    A batch elutriation technique for the density-based fractionation of iron ore

    By D M. Hunter, S M. Iveson, K P. Galvin

    For low density materials such as coal, density-based fractionation of particles via the sink-float method is relatively simple due to the availability of liquids of suitable density; however, for hig

    Jul 24, 2017

  • CIM
    Advantages of Tailing Disposal by Thickened Discharge

    By E. I. Robinsky

    "This paper describes a new, proven approach for tailing disposal. Not only is the disclosed system less damaging to the environment, it is also less costly to operate, to close down and maintain in p

    Jan 1, 1976

  • NIOSH
    IC 8393 Computer Usage For Evaluation Of Design Parameters And Cost Of Heat Exchangers - With No Change In Phase And Shell Side Pumping Costs As Prime Parameters

    By P. R. Jones

    A computer program was written for the design of a shell and tube heat exchanger on a price optimum basis for the following conditions: (1) Triangular pitch; (2) single or multiple pass; (3) heating o

    Jan 1, 1968

  • SAIMM
    Feasibility study of electricity generation from discard coal

    By A. Engelbrecht, B. North, B. Oboirien

    "There is large electricity generation potential in discard coal, both in stockpiles and current arisings. Power stations with a combined capacity of up to 18 GW electrical (GWe) could be fuelled by d

    Jan 1, 2015