Emerging Conveyor TechnologiesBy G. Bierie
The conveying of bulk materials is prone to problems. These problems can reduce the capacity and efficiency of the plant, and even threaten the health and safety of the workforce. This presentation w
Jan 1, 2007
-
Securing Rail Infrastructure in RomaniaBy Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
Rapid Excavation Using Trackless TechniqueBy S. P. Lewis, R. L. Sundeen
Most of us are aware of the ever increasing use of underground space. At the Advisory Conference on tunneling in Washington, D. C. in June of 1970, the demand for construction oriented tunneling durin
Jan 1, 1974
-
Sumps Aids the Broken Hill Proprietary Company Limited in Saxonvale Feasibility StudyBy G T. Kukla
A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine planning sy
Jan 1, 1980
-
Experiments on stope closure as a diagnostic measure of rock behaviourBy D. F. Malan, M. Grave, J. A. L. Napier
Previous fundamental research projects have indicated the value of continuous closure measurements in deep tabular excavations for improved support design, hazard assessment and for quantifying the ef
Jan 1, 2003
-
Utilization of Brazilian Waste Mica in Preparation of PigmentsBy Shirleny Fontes Santos
Muscovite mica crystals lower than 15 mm diameter are discarded as waste in the mining area of Borborema-Seridó (BRAZIL). The objective of this work was the ore dressing and purification of this waste
Jan 1, 2010
-
Filter-PressingTHE filter-press, which has done so much for the successful treatment of the sulpho-telluride ores of Kalgoorlie, has a serious rival in the vacuum process, and this paper is written with a view to ar
Jan 1, 1910
-
Reliability of Timing Sequence Network for Multiple Blast HolesBy Lifeng Li, Jhon Silva-Castro
In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m
Jan 1, 2016
-
An Investigation Into The Optimization Of Personnel Transportation To Level 15 And Below At Khuseleka No. 1 Shaft, Anglo Platinum ? SynopsisBy M. S. P. Rampedi
The paper reports on a vacation work project conducted at Khuseleka No. 1 Shaft, Anglo Platinum, where there was a need to optimize the transport of personnel to level 15 and below. Approximately 900
Jan 1, 2012
-
An Agglomerate Scale Model For The Heap Bioleaching Of ChalcociteBy N. Ogbonna
A mathematical model for bioleaching at the agglomerate scale is developed. The agglomerate is defined as a unit volume of a heap which contains a solid phase (a size distribution of ore particles), a
Jan 1, 2006
-
New and Improved ISO-Seismic 3D Analysis System for Mapping Ground Vibration Patters Around a BlastBy D T. Froedge
At the 1990 Symposium of the Society of Explosives Engineering, D.T. Froedge, President of GeoSonics Inc., presented a paper entitled "Differential Topographic Vibration Isomapping", which detailed th
Jan 1, 1992
-
Mining a 100 Million Tonne Orebody Without SubsidenceThe major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There were
Jan 1, 1980
-
Integration Of Operations And Underground Construction: Sound Transit University LinkBy John Sleavin
As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove
Jan 1, 2010
-
Belt conveyor booster drivesBy J. A. Stewart
"A common problem in the mining industry involves the overloading of established conveyor systems. This overloading can have a number of causes, such as new production technology or a changing market
Jan 1, 1982
-
Infrastructure Needs and Costs for Mining ProjectsBy Gibbs R
The objective of this paper is to provide a broad qualitative perspective of the needs and costs of infrastructure associated with typical mining projects. Infrastructure may be defined as anything
Jan 1, 1990
-
Reservoir Engineering - General - The Prediction of Volumes, Compressibilities and Thermal Expansion Coefficients of Hydrocarbon MixturesBy H. T. Kennedy, S. M. Avasthi
An equation developed for gaseous hydrocarbon mixtures predicts molal volumes with an average absolute deviation of 0.73 percent when applied to 264 natural gas and condensate systems including 2,043
Jan 1, 1969
-
Mining Ventures and Environmental ChangesA consideration of mining ventures and the changes of an environmental nature that occur. The paper is introduced with a general statement claiming recognition that mining ventures are important to hu
Jan 1, 1981
-
Bearing capacity of open-cut coal-mine backfill materialsBy A. R. Naderian
Laboratory strength and deformation testing of freshly blasted sandstone and claystone overburden from Jeebropilly colliery in Queensland and in-situ plate-bearing tests on four backfills of different
Jun 19, 1905
-
Deep Soil Mixing Utilizing Multi-Auger Equipment And Procedures - General - Background InformationBy Robert Jakiel
The following paper is being presented to provide a basic understanding of the equipment and procedures used in multi-auger deep soil mixing as part of the program for the Deep Foundations Institute (
Jan 1, 2001
-
Characterisation of Coal Seam Gas Waters in New ZealandBy D Nobes, D Trumm, D Manhire, A OÆSullivan, M W. Milke
Coal seam gas (CSG) exploration and development requires the abstraction of significant amounts of water. This is so because gas desorbtion in coal seams takes place only after aquifer pressure has be
Jan 1, 2005