Search Documents

  • CIM
    Environmental consequences of the placement of radium-barium sludge in tailings areas

    By K. L. Murphy, G. Multamaki, P. M. Huck

    "A preliminary evaluation, based on existing data, has been made of the implications of placing radium-barium sludge in tailings areas. The study was restricted to a consideration of possible increase

    Jan 1, 1982

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • SAIMM
    Block Size Selection And Its Impact On Open-Pit Design And Mine Planning

    By R. M. Jara

    This work evaluates and characterizes the impact of the support size and mining dilution of a block model in the operation and selection of equipment at an open pit mine. An exploratory analysis and g

    Jan 1, 2006

  • SME
    Modification Of Waelz Kiln Processing Of La Oroya Zinc Ferrite

    By P. C. Holloway

    La Oroya zinc ferrite (19.5% Zn, 26.6% Fe, 0.052% Ga, 0.075% In) was roasted with coal under conditions more oxidizing than normally used in a Waelz kiln, and the roasted residues were leached with 20

    Jan 1, 2008

  • AUSIMM
    Continuing Professional Development for the Mining Industry - A Suggested Agenda for Action by the AusIMM

    By Pullen G, Rose M

    Continuing Professional Development (CPD) is not just a catch-cry. It is an essential component of every-day life in many professions, including accountancy, law and public administration. Without

    Jan 1, 1989

  • SAIMM
    Pelletizing Of Sishen Concentrate - Synopsis

    By P. Mbele

    Iron ore concentrate is not easily transported to, or processed in, ironmaking plants, therefore it is necessary to agglomerate. This paper will determine the possibility of agglomerating Sishen conce

    Jan 1, 2012

  • DFI
    Comparative Analysis Between Traditional and EC7 Criteria Applied to the Design of Diaphragm Walls Concerning the Ultimate Limit States

    By J. Matos e Silva

    "Abstract The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditiona

    Jan 1, 2014

  • CIM
    Development of Cable-Lok Anchor for Pre-stressed Cable Bolting and its Applications in Mines

    By Rocky (Yaokun) Wu

    This paper introduces the development and application of a new cable anchor - Cable-Lok for pre-stressed cable bolting in mines. Cable-Lok is a spring-loaded cable anchor suitable for the drill hole

    Oct 1, 2010

  • AUSIMM
    Commissioning Under a Microscope ù The Cawse Nickel Start-Up

    By R Young, D OÆSullivan

    When Centaur Mining and Exploration produced nickel metal fromlaterite ore at its Cawse nickel project in January 1999, a new era in the nickel industry was heralded in. One of three new laterite proj

    Jan 1, 2001

  • AUSIMM
    The sampling characteristics of grains contaminated by mycotoxins

    By G J. Lyman, S A. Tittlemier

    International regulations exist to manage the concentrations of mycotoxins such as Ochratoxin A (OTA) and deoxynivalenol (DON) in grains and prevent health risks from excessive exposure to OTA and DON

    May 9, 2017

  • AUSIMM
    Storage and Time - A Paradigm for Aquifer Pressure Management Beneath Open Cut Mines

    By S Yuen, T Rana, S Khan

    Many open pit mines require dewatering or need aquifer depressurisation systems to manage mine water inflow and/or mine floor stability. In many instances these mining operations impact on regional gr

    Jan 1, 2009

  • SAIMM
    Transition From Open Pit To Underground Mining At Chuquicamata, Antofagasta, Chile

    By Antonio Karzulovic, Sergio Olavarría, Patricio Adriasola

    The economical analyses of different Chuquicamata open pit mine planning scenarios, indicate that the pit closure should occur at latest in the year of 2017. However, about 60,000 m of drill holes hav

    Jan 1, 2006

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to Mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian Mining Industry, possibly as a consequence of the downturn in mar

    Jan 1, 2000

  • CIM
    Application of biotechnology for treatment of nitrogen compounds in gold mill effluents

    By W. D. Gould, A. Kapoor, K. Morin, P. Bédard

    This paper presents the results of a research study that is being conducted by the Mine Effluents Program, Mining and Mineral Science Laboratory (MMSL), Natural Resources Canada aimed at evaluating bi

    Jan 1, 2004

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • SAIMM
    Modelling open pit shovel-truck systems using the Machine Repair Model - Synopsis

    By A. Krause

    Shovel-truck systems for loading and hauling material in open pit mines are now routinely analysed using simulation models or off-the-shelf simulation software packages, which can be very expensive fo

    Jan 1, 2007

  • AUSIMM
    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore

    Pilot-Plant Testing of Ammoniacal-Cyanidation for Gold Recovery from Copper Gold-Bearing Ore The results of pilot-plant tested ammoniacal-cyanidation of gold recovery from copper gold-bearing ore are

    Sep 13, 2010

  • CIM
    Evolution of a Mine Development System: Tunnel Boring Machine I&C Cameco Cigar Lake

    By Neil H. Brown

    Outline ? Cameco - Cigar Lake ? Cigar Lake Mine Development ? MDS #1 ? MDS #1 Improvements ? MDS #2 ? MDS #2 Improvements Pending ? Acknowledgements Mine Development System ? Mining methods t

    Oct 1, 2010

  • SME
    Strata Control

    By Christopher J. Bise

    INTRODUCTION Perhaps no other area reflects the art as well as the science of mining-engineering design quite as obviously as strata control. This is due to the fact that the design of mining stru

    Jan 1, 1986