Tunnel Design Aspects for the New Haven Downtown Storm Sewer Infrastructure Improvement Project - RETC2021By Michael Schultz, Gregory Sanders
The City of New Haven is proposing to construct Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project includ
Jun 13, 2021
-
Improvements in conveyor belt fire suppression systems for US coal mines - SME Transactions 2010By J. H. Rowland, A. C. Smith, K. A. Teacoach
Current regulations for fire suppression systems in underground coal mines to protect conveyor belt installations have been in place since the Coal Mine Health and Safety Act of 1969 was enacted. Over
Jan 1, 2010
-
Large Scale Performance Test Methods for Geomembrane Systems Used in Heap Leach Pad ApplicationsBy Ronald K. Frobel, Christopher J. Wienecke
Geomembrane systems and associated geosynthetics such as geotextiles, geonets, geogrids and geocomposites have been used in precious metal heap leach and tailings facilities for many years. Geomembran
Jan 1, 1993
-
Commissioning and Operation of Bio-Oxidation Plants for the Treatment of Refractory Gold OresBy Pieter C. van Aswegen, J. A. Brierley, C. L. Brierley
The bacterial-oxidation (BIOX®) process for the pre-treatment of refractory ores for gold recovery is marketed by BlOMlN Technologies S.A. The process was originally developed by GENMIN who is still p
Jan 1, 1993
-
Safety Considerations for Fast-Track Linear Projects Using Directional Boring, Plowing and Trenching TechniquesBy Patrick G. Hill
This paper discusses safety protocols for Kiewit Construction’s Level (3) project. The Level (3) project will cover a majority of the United States, and literally thousands of site operations will be
Jan 1, 1999
-
The Future Of The Analog Technique For The Simulation Of Mine Ventilation Networks ? IntroductionBy R. W. Williams
Consequent on the development of digital computers the importance of analog simulation as a means of studying engineering problems has diminished in recent years. The general-purpose nature of a digit
Jan 1, 1980
-
Fundamental Investigation Into The Interactions And Limitations Of Primary Dust Controls For Continuous MinersBy R. A. Jankowski, J. J. McClelland
Laboratory tests were conducted by the U.S. Bureau of Mines to determine the respirable dust reduction effectiveness of and interaction between face airflow and water sprays for a continuous miner. Ex
Jan 1, 1991
-
EM1ERGING REGULATORY DEVELOPMENTS lN THE USA AND THEIR IMPLICATIONS FOR POND/PAD LINER SELECTIONBy Rick T. Richins
Despite what may be overwhelming evidence that natural degradation of cyanide and cyanide attenuation in hydrogeochemical processes are capable of reducing or eliminating potential water quality probl
Jan 1, 1998
-
Rock Engineering Design And Construction Of High Head Pressure Tunnels For The Drakensberg SchemeBy Luigi P. Gonano, John C. Sharp
The Drakensberg Pumped Storage Scheme in South Africa with an operating head of 500m is located in sedimentary rocks containing relatively weak argillaceous strata. The paper describes design and cons
Jan 1, 1983
-
The Development of a Fully Autogenous Grinding Circuit for the Curragh Resources - Stronsay ProjectBy A. C. T. Bigg, A. F. Colombo, A. R. MacPherson
The step-by-step study of the Stronsay ores follows the testwork through the initial determination of Bond Rod and Ball mill work indices, the MacPherson Autogenous work indices and the production of
Jan 1, 1992
-
XTAl TITE CERAMICS FOR THE IMMOBILISATION AND CONSOLIDATION OF ARSENIC RICH SMEl TER FUMESBy F. Lincoln & B. Rodier, G. Poniatowski, N. Kawashima, T. J. White, J. H. Kyle, G. F. Eaton
The history of Australia is a narrative of the discovery and development of its mineral wealth. The gold strike at Ballarat, Victoria, in 1851 transformed the colony by triggering the first great infl
Jan 1, 1995
-
Thermosyphons For The Removal Of Ventilation-Induced Heat In An Arctic Underground Placer MineBy H. Wu, V. Izaxon
Intensive ventilation is required during the excavation of a mine opening and the subsequent exploitation of the mineral resources. The exchange of heat between the ventilation air and the rock mass h
Jan 1, 1997
-
Techniques for Estimating the Amount of Grain-Boundary Fracture During Comminution Of Mineralogical MaterialsBy R. P. King
Direct observations of intergranular fracture during comminution are very difficult to make. The best indirect method is based on the measurement of interphase area before and after comminution. If in
Jan 1, 1992
-
Photochemical Processes For Specific Removal Of Unwanted Species In Waste Water From Metallurgical IndustryBy S. K. Vidyarthi
Most wastewater clean-up processes suffer from a fundamental lack of specificity in that a Reverse Osmosis process removes all dissolved solids, an Electrodialysis Reversal process removes all ions, w
Jan 1, 1988
-
Pyro Process For The Production Of Lightweight Aggregate From Fly-Ash And Wastewater SolidsBy D. M. Conner
An innovative patented process has been developed to convert high volume wastes--fly ash from coal-fired power plants, municipal solid waste (MSW) ash from incineration, solids from waste water treatm
Jan 1, 1997
-
Technical Note: Alternative Method Of Blending For Sulfur Compliance (c8482ee3-8e7b-4ae3-8c89-5a423fae8cbc)By S. Hicks
This technical note describes an alternative procedure that can be used in linear programming calcula¬tions where the compliance limit of lbs S02/million Btu for the blending coal is subject to change
Jan 1, 1997
-
Coal Geology, Resources And Coal-Bed Methane Potential For The U.S. Gulf Coastal PlainBy J. C. Willett, J. R. Sanfilipo, S. M. Podwysocki, P. D. Warwick
The U.S. Geological Survey is concluding an assessment of the major coal regions of the country. In this program, the quantity and quality of coals that are expected to be mined during the next 30 ye
Jan 1, 2000
-
Modern Management Technology Methods And Systems For Higher Margins (0f94c010-61c2-400a-a87b-0f8d501cb39b)Maximizing margins in competitive markets demands superior productivity. Unfortunately, management systems developed early this century for other industries often drive counterproductive behaviors cho
Jan 1, 1999
-
Use of MIMO models in spreadsheets for the control of a column flotation circuitBy K. Terhaar, K. Prisbrey
The objective was to determine operating protocols for a lead and silver column flotation cleaner being considered for installation at Sunshine Precious Metals Inc. 's Kellogg mill in Northern Id
Jan 1, 2002
-
Seattle Bus Tunnel ConstructionBy John F. MacDonald, John W. Critchfield
This paper describes the shield excavation of twin transit tunnels, through soft ground, in downtown Seattle. The tunnels are 6.5 m (21.25 ft) diameter and 1525 m (5000 ft) long. Initial support consi
Jan 1, 1989