Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • CIM
    Emergency Egress/Ventilation Raise Innovations in Directional Raise Boring & Remote Shotcrete Application

    By Eric Schraml

    Wardrop Engineering and the Placer Dome?s Campbell Mine Design Team utilized leading edge directional raise boring techniques and an innovative, remote controlled application of steel fibre reinforced

    May 1, 2002

  • CIM
    Social Implications of Mining Operations on Nearby Communities - A Case Study

    By Steven Townend

    Mining-related activities have been known to create a challenging operating environment for mining companies located in close proximity to communities. Issues such as noise, vibrations from mining ope

    May 1, 2011

  • CIM
    Grinding Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of an SABC grinding circuit using CEET technology applied to grindability data produced from testing 100 samples and distributed across the blocks of a mine plan using

    Jan 1, 2007

  • CIM
    The Importance of Efficient Mass Flow Balance in Crushing and Screening Plants

    By Fernando Romero Lage

    The purpose of this paper is to analyze detailed crushing and screening configurations and the interrelationship as they relate to mass flow balance, operating efficiency, plant availability and final

    May 1, 2010

  • CIM
    Global Approach to Managing Deep Mining Hazards

    A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced

    May 1, 2009

  • CIM
    Evaluating the Applicability of Gold Pre-Concentration by Sensor Based Sorting of Quartz Ore

    By A. Takala, B Nielson, J. Schunicht

    "Pre-concentration in minerals processing presents clear advantages in energy efficiency, water efficiency, reduction of consumables and minimization of capital and operating costs. Outotec’s sorting

    Jan 1, 2017

  • CIM
    Real-Time Data Reconciliation for Process Control

    By Éric Poulin, Simon Gariépy, Mario Paredes Malca

    "While the design of a control strategy depends on the available process knowledge, its implementation depends on the available process information. On-line chemical analyzers are today widely spread

    Jan 1, 2006

  • CIM
    Simulating the Mine-Mill Interface

    By J. A. Meech, G. R. Baiden

    "A dynamic simulation of a mine-mill complex has been conducted using networked microcomputers (IBM PC/AT and IBM PC/XT). These models allow simultaneous operation of an open pit using shovels and tru

    Jan 1, 1987

  • CIM
    Linking Flotation Efficiency to Bubble Size

    By Jose R. Hernandez-Aguilar

    "This paper revisits data from previous studies (Hernandez-Aguilar, 2010, 2011) to better understand the link between metallurgical performance and pulp-zone bubble size (Db) in full-scale flotation s

    Jan 1, 2017

  • CIM
    Rock Mechanics Approach for the Recovery of the Zone G Crown Pillar at the Raglan Katinniq Mine

    By P. P. Andrieux

    The recovery of the Zone G crown pillar, located between the bottom of the open pit and the top of the underground workings at the Raglan Katinniq Mine in Nunavik, started in the summer of 2008 and sh

    May 1, 2009

  • CIM
    Towards Sustainable Mining - Made-in-Canada solution to driving environmental and social performance in mining

    About MAC ? The national organization of the Canadian mining industry ? Mining, smelting and refining of base and precious metals ? Mining of iron ore, diamonds, uranium, oil sands, coal and

    Aug 1, 2013

  • CIM
    New Technology for Hoist Conveyance Monitoring and Analysis

    Many mines in Canada, the US and S. Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due the excessive weight. It has been suggested (DeLorme, 2

    May 1, 2002

  • CIM
    Frother Analysis: Procedure and Plant Experiences

    By James A. Finch, Stéphanie Gélinas

    "A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2007

  • CIM
    Use of the IREDES Standard For Real-Time Information Exchange in Mining Process Optimization

    By Christoph Müller

    Information exchange for mine process optimization is essential. Today, modern mining equipment uses the IREDES standard to exchange production plans and reports for easy management and storage. To ga

    Oct 1, 2009

  • CIM
    Concentrate Dewatering Modernization at the INCO Thompson Smelter

    By Mika Muinonen

    "Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou

    Jan 1, 2006

  • CIM
    Artificial Geo-Hydrological Zonation

    By J. A. López-Molina, S. García, V. Castellanos-Pedroza

    "Groundwater inflow into underground constructions may cause hazardous working conditions and environmental problems. It is essential to localize and characterize potential flow paths and to estimate

    Jan 1, 2015

  • CIM
    Latest Fire Protection Innovations for Large-Scale Mining Equipment

    By Don A. Toth

    Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were

    Apr 1, 2005

  • CIM
    Application of advanced blasting technologies for large scale de-stress blasts at Brunswick mine

    By S. Chung

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick mine. Over the past 30 years, two large regional pillars were established on the 1000 m Level to support t

    Jan 1, 2005

  • CIM
    On-Line Mine ? A New Concept for Improving Mining Economy Through On-Line Mineral Analysis

    By Ilpo O. Auranen

    Background: Mines of today are moving ever increasing tonnages of rock. The new ore bodies tend be of lower grade and located deeper in the earth?s crust. The industry?s focus to overcome this ?deep

    Oct 1, 2009