Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Operation of the Process Plant at Tolukuma

    This paper reviews the commissioning and operation of the process plant at Tolukuma over the past 18 months. The plant treats a high-grade gold and silver ore through a SAG mill followed by a conven

    Jan 1, 1997

  • AUSIMM
    The Impact of Landslides on the National Highway System in the Highlands Region

    The Highlands Region of Papua New Guinea has 3 major national highways. The locations of these national highways are shown in Figure 1. The Highlands Highway begins at Lae City on the coast and pas

    Jan 1, 1997

  • AUSIMM
    Testing and quantifying geological uncertainty (or a gram of drill data is worth a kilogram of geological interpretation)

    By M P. Murphy, C M. D Barton

    When developing a new underground mine, the geological interpretation that guides the mineral resource is crucial to the preparation of a reliable ore reserve. In preparing a robust geological model t

    May 24, 2023

  • AUSIMM
    The Design and Development of a Laboratory Scale Solvent Extraction Apparatus

    By Brady KT, Pattenden G

    A laboratory size solvent extraction apparatus has been constructed, which incorp- orates three stages of countercurrent extraction, followed by two stages of counter- current stripping. The model u

    Jan 1, 1984

  • AUSIMM
    Mine Geology from a Geotechnical Perspective

    This paper addresses the role of mine geology in mining geotechnics. The role is assessed and discussed in terms of five main elements; geotechnical complexity, geological complexity, mine scale, perc

    Jan 1, 1993

  • AUSIMM
    Natural Rehabilitation of Shag River Catchment, East Otago, After Historic Gold Mine Tailings Discharges

    By A Black, J H. Youngson

    At least 85 000 tonnes of mine tailings were discharged into Deepdell Creek, east Otago between 1890s and 1940s. The tailings contained about 1 wt % arsenic, so about 850 tonnes of arsenic in the form

    Jan 1, 2004

  • AUSIMM
    Developments at MHD 'Berzelius' Duisburg

    By Tack K

    During its 28-year life the MHD ISP smelter has gone through two phases, each of about a dozen years. The first phase was a learning one; in the second phase the lessons were applied and throughput

    Jan 1, 1993

  • AUSIMM
    Floatability of Streams Around the Cominco Red Dog Lead Cleaning Circuit

    By Frew J. A, Harris M. C, Manlapig E. V

    The recovery achieved in a flotation process is a function of both the characteristics of the feed stream and the operating conditions within the flotation cell. In this paper, the flotation charact

    Jan 1, 1997

  • AUSIMM
    Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification

    By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford

    Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti

    Nov 24, 2014

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Development of Blast Furnace Slag as an Aggregate on Road Surfacing

    By Simpson JF, Murrie SJ

    In determining new areas for slag disposal a foamed slag aggregate has been developed for use as a skid resistant material. The foaming of the slag does not rely on the use of water, but rather on

    Jan 1, 1979

  • AUSIMM
    Meteorological Forecasting of Blast Noise from the Del Park Minesite (fbcdcfc5-5412-43cd-8805-cbe0739cecc8)

    Alcoa of Australia's Western Australian bauxite mining operations in the Darling Ranges, southeast of Perth, present major challenges in the control of air blast. The close proximity of rural com

    Jan 1, 1983

  • AUSIMM
    Changes in Underground Coal Mining Technology - an Australian Outlook

    By Lama R. D

    The Australian underground coal mining industry is undergoing major changes. This paper analyses the technologies presently being researched in mines, and discusses their utilisation as major cont

    Jan 1, 1986

  • AUSIMM
    Economic Influeces on a Base Metals Project

    By Cooper P. G

    I he Electrolytic Refining and Smelting Company (ER&S) has oper- ated a copper smelter at Port Kembla, NSW since 1908. The feasibility of modernising the smelter was recently studied and external inf

    Jan 1, 1988

  • AUSIMM
    Coal Seam Modelling and Mine Planning Using Results of a 3D Seismic Reflection Survey û An Example from Huntly Coalfield, New Zealand

    Geological hazards such as faulting, basement ridges, and zones of "thin" (

    Jan 1, 1998

  • AUSIMM
    Tonnes, Grade and Economics - The ZC Mine Experience 1985-1988

    From the mid-1970s ZC Mines at Broken Hill had a policy to increase ore production rates at progressively lower head grades. In the mid-1980s the mine suffered crippling losses at a time of low metal

    Jan 1, 1990

  • AUSIMM
    Excess pore water pressure induced during tailings run-out

    By M A. Llano-Serna, D J. Williams, L Bu

    Tailings dam failures continue to occur worldwide at an unacceptable rate, averaging two events annually over the last 100 years. Furthermore, tailings dams continue to grow in size, increasing the po

    Jul 23, 2018

  • AUSIMM
    Some Design and Operating Aspects of the Ranger Uranium Mine Treatment Plant

    Environmental considerations were key factors in the design of the Ranger Uranium Mines treatment plant. The mine is located adjacent to the Kakadu National Park and has an average rainfall of 1.6

    Jan 1, 1984

  • AUSIMM
    Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical Techniques

    By D J. Bradshaw, B Lottermoser, A Parbhakar-Fox

    "Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency

    Sep 29, 2013

  • AUSIMM
    Reassessment of Controls on the Gold Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania

    By M J. Nugus

    The Geita gold mines in north-western Tanzania have produced 5 Moz of gold from an estimated endowment of 15 Moz. They are generally classified as typical Archaean orogenic banded iron formations (BIF

    Aug 22, 2011