Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Prospecting in Areas of Glacial Overburden in Western TasmaniaBy Orr D. B
This is a case history of prospec- ting carried out by Comstaff Pty. Ltd. over the Pinnacles Area, part 4 of Exploration Licence 5/63, 9 km north of Rosebery in Western Tasmania. Evidence is prese
Jan 1, 1977
-
Developments in Mineral Processing TechnologyBy Greenhalgh L. P H
The opportunities offered by an increasingly volatile world invite the international consultant or engineering services contractor to broaden attitudes, diversify interests, expand capabilities, retai
Jan 1, 1993
-
Generating Synthetic Data for Simulation Modelling in Iron OreBy J E. Everett, K Jupp, T J. Howard
Simulation modelling is a practice commonly used in the mining industry to evaluate alternative process designs. Such modelling is typically undertaken as an optimisation study to increase the efficie
Sep 29, 2013
-
Identifying Gold Losses Through the Application of SIMS TechnologyBy P Hayward a, P Evans, K Prince, F Radke
Operating efficiency is becoming paramount as the mining industry moves towards globalisation and conglomeration. Mining companies are continuously searching for new technologies that can improve plan
Jan 1, 2004
-
Optimisation of Cut-off Grades During Design of Underground MinesThe theory of declining optimimum cut-off grades is more than 25 years old, but for a number of reasons it is still not widely used in industry. A lack of faith in the veracity of estimated grades i
Jan 1, 1991
-
Eliminating Waste Streams on Synthetic Rutile Plants: Treatment of Electrostatic Precipitator Fume by Plant Acid EffluentBy M M. Collisson
The Synthetic Rutile (SR) plant operations, North Capel, produce electrostatic precipitator (ESP) fume and kiln scrubber residue. Typically ESP contains about 18 per cent Ti, 13 per cent Fe, 0.5 per c
Jan 1, 2001
-
Fragmentation MechanicsThe mechanisms of fragmentation in homogeneous materials and structured rock mass are reviewed. A method previously used to predict vibration damage to the remaining rock is extended and shown to be
Jan 1, 1990
-
Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro KencanaBy H Utama, hi, A Suw
PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method
Nov 29, 2022
-
Pre-concentration – more than bulk ore sortingBy P Holtham, K Duffy, L Pyle, W Valery
The mining industry is becoming increasingly focused on pre-concentration due to its potential economic and environmental benefits, particularly for the more complex, low-grade, high throughput operat
Aug 24, 2022
-
Reopening the Golden MileBy Cleghorn JH
Underground mining operations on Kalgoorlie's Golden Mile were suspended in 1976, suffering the combined effects of low gold prices and grades. A subsequent substantial increase in the gold price
Jan 1, 1984
-
Maximising asset value through optimal block by block decisions on marginal materialBy F Phillips, E Deucker, J Kato
It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari
Mar 15, 2021
-
The Effect of Seasonal Variations on the Performance of Mineral Processing Plants – A Case Study of Deposit-10/11A Mine of NMDC LtdBy S Das
Deposit-10/11A is situated in the iron rich Bailadila region of India comprising haematite ore of average grade 65 per cent Fe. The deposit production line was commissioned in the year 2002 having a c
Jul 11, 2011
-
Developing and Implementing Ore-Specific Targets for the Rosebery ConcentratorProduction targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated
Oct 29, 2012
-
Large Scale Development of Submerged Lancing Sirosmelt Tin Process at Associated Tin SmeltersBy Jones KW, McClelland RA, Denholm WT, Taylor RN, OÆShea J
Associated Tin Smelters, Sydney, are developing tin smelting operations in a prototype commercial SIROSMELT plant comprising two furnaces of 5 to 8 tonnes capacity. Features of the plant and its
Jan 1, 1984
-
Optimizing Exploratory Drill Hole LocationsBy Baafi EY, Chatterjee PK
The quality of mine planning decisions ultimately depends on reliable estimates of the characteristics of the orebody. The quant- ifiable factors such as grades or thickness can be estimated from f
Jan 1, 1986
-
Effluent Treatment System at Pasminco Metals - EZBy Plamer D. J, Newman O. M G
The Effluent Treatment System at Pasminco Metals - EZ (PMEZ) was commissioned in December, 1991 and has operated satisfactorily, ensuring that aqueous discharges from PMEZ comply with the Tasmanian
Jan 1, 1993
-
Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam – Utilisation of Flyash and CO2 StorageBy A Hamanaka
EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be
Nov 22, 2011
-
Thermodynamic Studies of Liquid Iron Alloys by a Mass Spectrometer Equpped with a Newly Developed Ion Current Measuring SystemBy Yamada K, Abe H
Magnetic scanning type mass spectrometers have been given improved sensitivity with a large dynamic range and considerable resolution by the addition of a computer-controlled electric equipment. A
Jan 1, 1980
-
Practical Conditional Simulation for Geologists and Mining EngineersBy Coombes J, Richards W. L
The objective of this paper is to illustrate, in a practical way, how both geologists and mining engineers can use conditional simulation to add value to their decisions. Inherent assumptions, requi
Jan 1, 1998
-
Mineralogical Evaluation of PGE Behaviour in Fe-Ni-S and Cu-Ni-S Mattes and Fayalite Slag: Geological ImplicationsBy Selischop F, Tredoux M
The distribution of platinum-group elements (pGEs) has been investigated in matte and slag samples from Waterval Smelter (Rustenburg Platinum Mines). The study showed that a strong preference of PGEs
Jan 1, 1994