Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Rock Stress Inputs to Stability Assessments at Ok Tedi Mine, Papua New Guinea

    By K W. Mills, N R. P Baczynski, J Mylvaganam, D A. Prado, M F. Lee, I A. de Bruyn

    "This paper presents the second part of a study of the assessment of rock stress inputs on the performance of various new mining designs at the Ok Tedi large open pit mine in Papua New Guinea. Over th

    Nov 5, 2014

  • AUSIMM
    An Integrated Technology Solution for Optimised and Environmentally-controlled Blasts

    By C Parihar, R Garg, A Bhandari, S Bhandari

    Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for

    Aug 24, 2015

  • AUSIMM
    Potential of the Overburden Cast Blasting Technique in Indian Surface Coalmines – A Modular Approach and its Financial Implications

    By M D. Uttarwar, R R. Yerpude

    India is the world’s third-largest producer of coal and is endowed with the fifth-largest coal reserves in the world. Surface mining straddles the entire domain of the Indian coal mining industry, yie

    Aug 24, 2015

  • AUSIMM
    Blasting Near Mine Surface Infrastructure

    By A J. Moore

    Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established

    Nov 8, 2011

  • AUSIMM
    Study of the Effect of Blast Pattern Design on Autogenous and Semi-autogenous Mill Throughput at Gol-e-Gohar Iron Ore Mine

    By M R. Dehghan, H Mansouri, A Hakami, M A. Ebrahimi Farsangi, F Faramarzi

    Today, it is accepted that rock fragmentation by blasting affects loading and hauling operations, and also directly influences on downstream processes such as crushing and grinding. In this research,

    Aug 24, 2015

  • AUSIMM
    Measurement and Assessment of Bulk Explosive Products

    By G Cavanough, A Olsson, J Rock, A C. Torrance

    There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys

    Aug 24, 2015

  • AUSIMM
    Northparkes Mines – Flotation and Planning for the Future

    By G Harbort, D Clarke, D Morgan, C Sola

    Northparkes Mines commenced production in 1994 and the mine has significant reserves to allow operation into the future. There are a number of potential future concentrator feed sources with variable

    Sep 1, 2014

  • AUSIMM
    Iran Mining Industry Based on the 20-Year Perspective 2025

    By F Rashidinejad

    Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many

    Nov 22, 2011

  • AUSIMM
    A Historical Perspective of the Application and Success of Geometallurgical Methodologies

    By S R. Williams

    There is a sense of geometallurgy being new; a new methodology for mining project development and improved operational strategy. One of the main challenges that any ænewÆ technology faces is a validat

    Sep 29, 2013

  • AUSIMM
    Water Treatment at the Waihi Gold Mine

    By B Twidle, D Bertoldi, J Meikle, R Dunne

    The Waihi Gold Mine is situated in a high rainfall area (annual average of over 2 m) on the North Island of New Zealand. Water treatment and discharge at the mine has been ongoing for the last 25 year

    Sep 26, 2013

  • AUSIMM
    The Geology and Exploration of the Mt Coolon Gold Deposit

    By Cunneen R. D, Murray A. M

    Exploration in the vicinity of the abandoned Mt Coolon mine has shown that the shape and attitude of the quartz lode is controlled by the interaction between the lode and a converging syncline. Go

    Jan 1, 1989

  • AUSIMM
    The Real Goal of Project Development is Building Businesses, Not Projects

    All too often engineers and project teams focus on building æthingsÆ, and they tend to see the key goals as meeting the project cost and schedule targets. We frequently compound the problem by unknowi

    Jan 1, 2002

  • AUSIMM
    A Study of the Composition, Microstructure, and Softening Characteristics of Some Zinc-Lead Sinters

    By Shoobridge PH

    Operating difficulties during 1977 with the Imperial Smelting Furnace operated by Sulphide Corporation Pty. Limited at their Cockle Creek zinc-lead smelter were found to be caused by premature so

    Jan 1, 1978

  • AUSIMM
    Treatment Plant Innovation at Garden Well

    By W T. C Kendall, H D. Ngo

    Garden Well is a shear-hosted Archaean orogenic gold deposit located 100 km north of Laverton, Western Australia. The Garden Well processing plant is designed for a nominal 491 t/h milling rate and an

    Sep 26, 2013

  • AUSIMM
    Olympic Dam Operations Review

    The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y

    Jan 1, 1998

  • AUSIMM
    Geophysics of the Honeymoon Well Nickel Deposits, Western Australia

    The Honeymoon Well nickel sulphide deposits are located in the Agnew-Wiluna greenstone belt, about 45 km south of Wiluna. Both disseminated and massive sulphide nickel deposits are hosted by komati

    Jan 1, 1996

  • AUSIMM
    A Model To Control Bins for Hydraulic Hoisting

    A model has been developed for the per iodical maintenance of bins used for hydraulic hoisting in mining of steeply inclining coal seams. This model gives a control plan for hoisting, bin switching

    Jan 1, 1977

  • AUSIMM
    The Transition from Semi-autogenous to Autogenous Milling at Waihi Gold

    By D Bertoldi, C Haines

    "The Waihi Gold Mine (WGM) operated by OceanaGold New Zealand Limited is a wholly owned subsidiary of the OceanaGold Corporation of Australia. Traditionally WGM has stockpiled and processed separate c

    Oct 10, 2016

  • AUSIMM
    Improving the performance of blind uphole rises at Ernest Henry Mine – a case study

    By T Purvis, Z Liu

    Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro

    Oct 16, 2017

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015