The Ongoing Evolution Of Stope Panel Support At Impala Platinum Limited - SynopsisBy N. D. Fernandes
Labour-intensive narrow reef stoping, as traditionally practised in South African gold and platinum mines, is almost unique in the modern first-world mechanized mining environment. Shortcomings of the
Jan 1, 2011
-
Modelling Effects of Accidental Explosions in Rock TunnelsBy P. Lundman, L. Rosengren, T. Brandshaug
Tunnel 99’, the Swedish National Road Administration´s (SNRA) general technical specification for road tunnels requires that the load bearing system must be designed to withstand specified design expl
Jan 1, 2003
-
The LUREC® process?key to economic smelter acid plant operation - SynopsisBy K. -H. Daum
Over many decades, numerous feasibility studies have demonstrated, that the production of sulphuric acid remains the most viable option of sulphur recovery from smelter off gas and abatement of SO2 em
Jan 1, 2009
-
Using laser scanner face mapping to improve geotechnical data confidence at Sishen mineBy T. M. Russell
"Face mapping is a simple but invaluable means of geological and geotechnical data acquisition whereby intact rock properties, rock mass properties, discontinuity properties, and structural orientatio
Jan 1, 2018
-
A Simple Framework For Developing A Concept Beneficiation Flow SheetBy J. Rabe
Tasked with developing a flow sheet for a new resource, one typically turns the experts for help. The advice of an expert can be invaluable in reducing the time and costs associated with characterizin
Jan 1, 2014
-
Dual energy X-ray transmission sorting of coal - SynopsisBy L. von Ketelhodt
Dual energy X-ray transmission (DE-XRT) sorting is a recent development in the range of sensor-based sorting technologies available today. DE-XRT is particularly suitable for dry coarse coal beneficia
Jan 1, 2010
-
The Introduction of a Stiff Rockbolt and Hanging Wall Control Management System at a Platinum Mine in South AfricaBy P. Altounyan, K. Akermann, T. Van den Berg
Amandelbult Mine is currently undertaking a trial to mechanise the mining of the UG2 reef through the introduction of room and pillar mining. As part of the trial, a system of managing the control of
Jan 1, 2003
-
Sirovision®: a proposed solution for the implementation of a digital geological mapping and modelling system at AngloGold Ashanti?s Moab Khotsong Mine ? interim reportBy H. C. Van Der Merwe
In the 21st century, dynamic, accurate digital 3-D geological models are essential to the pursuit of safe, efficient and profitable mining. This is particularly true for the deep-level underground min
Jan 1, 2009
-
Control of the grain size distribution of the raw material mixture in the production of iron sinter - SynopsisBy E. Lwamba
The aim of this study was to examine the effect of grain size distribution control of the raw material mixture on the permeability of the green sinter bed and the properties of the produced sinter. Th
Jan 1, 2008
-
Valuation Of A Mineral Resource That Has A Compound Metal Content Distribution: An Example Based On The Merensky Reef At Wesizwe Platinum Limited?s Pilanesberg ProjectBy D. R. Young
Drilling exploration over the Wesizwe Platinum Limited?s Pilanesberg Project has identified the Merensky Reef at depths varying from 594 m to 1 552 m depth. Merensky Reef thickness varies from 0.05 m
Jan 1, 2006
-
Observations and analyses of roof guttering in a coal mine - SynopsisBy X. Ndlovu
Underground observations in a coal mine have indicated failure oft he immediate roof above the bords. Careful observations and photographic recording of occurrences of these roof failures, termed ?roo
Jan 1, 2007
-
Systematic characterization of the mixing process for the BIOX® reactorBy R. Van Deventer
The BIOX® process was developed for the biological pre-treatment of refractory gold ores and concentrates ahead of conventional cyanide leach gold recovery. Rights to the process are currently with BI
Jan 1, 2009
-
Summary of results of ACARP project on cross-belt cuttersA project was funded by the Australian coal industry to investigate the mechanisms that might lead to sample bias when using cross-belt cutters, in order to help coal industry personnel to make better
Jan 1, 2009
-
A discrete event simulation approach for mine development planning at Codelco’s New Mine LevelBy I. Soto, E. Córdova, A. Anani
The new caving megaprojects that are planned to go into production in the next decade have scheduled horizontal developments at very high rates, which are difficult to achieve. Research has been condu
Oct 1, 2022
-
The effect of ultrasonic pre-treatment on wettability and floatability of chalcopyrite, pyrite and quartz, A. Hassanzadeh, A. van Hall, G. Öktem, S.G. Özkan, and M. RudolphBy M. Rudolph, A. van Hall, G. Öktem, S. G. Özkan, A. Hassanzadeh
Despite the four-decade study on ultrasound’s (US) impact on mineral’s floatabilities, there is still not clarity regarding its role in mineral surface wettability. For this purpose, the present inves
Jan 1, 2020
-
Measurement and verification of energy efficiency impact at gold minesBy K. Arnold
AngloGold Ashanti has been proactive in the field of energy management for many years. AngloGold Ashanti is a signatory to South Africa?s National Energy Accord of 2005 calling for a15% reduction in e
Jan 1, 2009
-
The effectiveness of current control of submerged arc furnace electrode penetration in selected scenarios - SynopsisBy A. C. Mulholland
The electrical control of three-electrode submerged-arc furnaces suffers from a number of complexities, mostly due to the nature of the furnace electrical circuit providing power to the furnace where
Jan 1, 2009
-
Reflections on Narrow-Reef Platinum Mining Pillar Design Systems as Applied to a Large Platinum Exploration Feasibility ProjectBy J. N. Van der Merwe
"Platinum is a highly valuable resource, its safe and economic extraction is paramount. The success of platinum mining by the bord and pillar method depends heavily on a comprehensive and dependable p
Jan 1, 2017
-
Case Studies Of Simultaneous Mining And Mineral Processing Optimization Applied To Platinum And Nickel OperationsBy S. Burks
This paper develops the themes explained at the previous SAIMM Platinum conference by Whittle and Burks1. Optimization techniques can be used to significantly increase the value of mining businesses b
Jan 1, 2012
-
Case Study: Using Software Optimization Techniques For The Optimal Allocation Of Equipment In A Mechanized Underground Mining EnvironmentBy D. Kok
A challenge in mine planning is the optimal allocation of resources to the appropriate workplaces within the shift cycle (labour, equipment type, and other resources) in order to carry out the shift c
Jan 1, 2012