Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimum Equipment Management through Life Cycle Costing (c0e511d8-44ab-43ca-828c-72662e49cf23)

    By Jessica Barber

    Problem ? Mining operations consistently need equipment that is available, and able to perform to its maximum potential ? The most difficult part of a Maintenance Manager?s job is often a lack of kn

    May 1, 2008

  • CIM
    Innovations in Reagent Technology: New Collectors and Modifiers for Difficult to Treat Ores

    By T. Bhambhani, D. R. Nagaraj

    "Ultramafic Ni ores present significant challenges in processing in that both recoveries and grades are not satisfactory, due to the presence of Mg silicates in large amounts. Significant quantities o

    Jan 1, 2012

  • CIM
    Stability Assessment of Rock Slopes: Towards an Inverse-Reliability-Based Methodology

    By Xiang Li, Xibing Li

    It is paramount that the stability of rock slopes be correctly accounted for under diverse operating and environmental conditions. Owing to different sources of uncertainty entailed in such stability

    Jan 1, 2015

  • CIM
    Column Flotation Applied to the Production of Phosphate Rock in Araxa-MG, Brazil

    By Antônio Peres, Rogério Guimaraes, Lauro Takata, Harold Wyslouzil

    "Serrana’s concentrator, in Araxii, has capacity of producing approximately 800,000 tomes of phosphate rock per year, with a P205 grade of 36%, from ores grading between 13% and 14% P205. The annual m

    Jan 1, 1999

  • CIM
    Flotation Performance Improvement at Placer Dome Kanowna Belle Gold Mine

    By S. Schwartz, T. Bilney

    "Over recent years a number of techniques have been developed as part of the AMIRA1 P9 project to represent mathematically or measure directly sub-processes occurring in flotation cells. These include

    Jan 1, 2005

  • CIM
    The Pierre Beauchemin Gold Mine: A structurally controlled deposit within a Sub-Horizontal Layered Composite Granitoid

    By Claude Hubert, Alex C. Brown, Michel Richard, Rejean Sirois

    "The Pierre Beauchemin gold deposit, situated 15 km NW of Rouyn-Noranda, produces an average of 1050 tonnes of ore a day. Reserves are 1.2 Mt grading 5.6 g/t Au. The deposit, located in a shear zone w

    Jan 1, 1990

  • CIM
    ICM / Minespace 2001 L'exportation De L'expertise Minière Canadienne Le 2 Mai 2001

    PROFIL D'ENTREPRISE Léandre Gervais & Associé(e)s est une société d'experts-conseils en ingénierie de la structure, de la mécanique & de la tuyauterie, et de l'électricité et de l&apo

    May 1, 2001

  • CIM
    Economical Benefits of Autogenous Grinding

    By Seppo Lähteenmäki, Pertti Koivistoinen, Jaakko Levanaho

    "This paper describes the benefits and disadvantages of fully autogenous grinding when compared to grinding with steel grinding media. The study is a real case study based on a low tonnage, high grade

    Jan 1, 2000

  • CIM
    Advances in Fine and Coarse Particle Flotation

    Flotation works very well for particles that are typically in the range 20 to 150 µmin diameter, for base metal ores. In this range, it is possible to get quite high recoveries in conventional flotati

    Jan 1, 2009

  • CIM
    Drill Rig Navigation and Drill Plan Creation using IREDES

    By André van Wageningen

    Since the beginning of this century Boliden Mineral and Atlas Copco have worked together in stages on improving the accuracy and quality of drilling. Navigation of the drill rigs with IREDES has been

    Oct 1, 2009

  • CIM
    Carbon Dioxide Use for pH Control at Greens Creek Mill

    By Tim Martin, Dave Tahija

    "In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p

    Jan 1, 2016

  • CIM
    Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest Queensland

    By Patrick J. Williams, Peter J. Pollard

    "Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a

    Jan 1, 2001

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Failure of Anisotropic Shales under Triaxial Compression and Extension

    By J. Ambrose, R. W. Zimmerman

    "Shales are highly anisotropic in their mechanical behavior. The strength ( ??1) of anisotropic shales depends not only on the magnitude of the other two principal stresses ( ??2, ??3), but also on th

    Jan 1, 2015

  • CIM
    Retarding Systems for Electric-Drive Haulage Trucks

    By Barry J. Turley

    With over 700 large electric-drive haulage trucks operating in Canadian mining today and over 3700 in mines worldwide, most aspects of electric drive are well known. Recently, however, extensive appli

    Jan 1, 1978

  • CIM
    Selecting Advanced Constitutive Models: An Overview

    By A. O. Sfriso

    "Numerical modelling is becoming universal in rock engineering practice. Most applications focus on the prediction of failure loads of 2D problems, where the numerical models are useful extensions to

    Jan 1, 2015

  • CIM
    Seismic Response to Mining at the Brunswick No.12 Mine

    By Brad Simser

    The Brunswick No. 12 Mine is a 10 000 tonne per day producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stopin

    May 1, 2003

  • CIM
    Study on Acoustic Wave Propagation in Fractured Rock Mass Under High in-Situ Stress of Model Test and Damage Constitutive Relation

    By Hang Zhao, Xinping Li, Pingan Wu, Yi Luo

    "The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under h

    Jan 1, 2015

  • CIM
    Oxygen Demand – Measuring Pulp Reactivity

    By Stephen R. Grano, Jon Glatthaar, Philippe Steinier, Christopher J. Greet

    "The importance of the oxygen content of sulphide mineral pulps in determining which reactions occur, and their subsequent influence on flotation behaviour is grossly underestimated in most operating

    Jan 1, 2004