Reduced Energy Consumption at Kidd Creek through Pressure Filtration Technology
By S. Pinard, J. MacLellan, G. Ehlert
"The Kidd Creek concentrator is looking actively for alternative technology as means of reducing operating costs in their concentrate handling section. The use of pressure and vacuum filters to elimin
Jan 1, 1992
-
Design of the Kubaka Grinding Circuit Using SPI and Bond
By Graham Holmes, John Starkey
"The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball
Jan 1, 2001
-
Flooding and loss of the Patience Lake potash mine
By D. Gendzwill, N. Martin
"In early 1987, the Patience Lake potash mine near Saskatoon, Saskatchewan, was closed due to uncontrollable floodingWater inflows were first encountered during routine mining in 1975 at the south bou
Jan 1, 1996
-
Teck’s Secondary Leaching Technology
By H. M. Lizama, R. L. Stephens
Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph
Jan 1, 2019
-
Milling of Noranda Process Slags
By P. W. Godbehere, B. W. Brooks
"This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced
Jan 1, 1977
-
Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits
By J. A. McLennan
Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer
Apr 1, 2005
-
Back to the Basics in Process Control
By A. Vien, B. C. Flintoff, R. P. Edwards
"A major thrust in industrial automation over the past few years has been the exploration and incorporation of higher level (supervisory and optimizing) control strategies aimed at more fully exploiti
Jan 1, 1998
-
Development of the East West Caribou Selective Lead and Zinc Flowsheet and Subsequent Modifications to the Existing Mill Facilities
By Godfrey MacDonald
"The East West Caribou deposit with an underground mine, concentrator and ancillaries is located 30 km west of Bathurst, New Brunswick. The Restigouche deposit, an open pit mine is 30 km west of East
Jan 1, 1997
-
Parameters for Cyclone Selection
By Norman A. Jull
"Factors which affect the separation achieved in a hydrocyclone are discussed and illustrated with graphs of some mathematical relationships.Definitions of separation and sharpness include comment on
Jan 1, 1972
-
A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas
By Anil K. Beersing
Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring
Apr 1, 2005
-
Iron Ore Pelletizing -A Literature Survey
By G. E. Viens, R. A. Campbell, G. N. Banks
A survey of the literature reveals wide differences in the procedures used in making iron ore pellets and in the properties of the pellets obtained. In this paper, the methods of production and the pr
Jan 1, 1962
-
Uranium Milling in Northern Saskatchewan’s Athabasca Basin Past, Present and Future
By Chuck Edwards
"Milling operations in northern Saskatchewan’s Athabasca Basin have produced uranium continuously since 1975. Over that period, the Athabasca Basin has been one of the world’s premier uranium camps, y
Jan 1, 2011
-
Comparison of Ore Hardness Measurements for Grinding Mill Design for the Tenke Project
By David Meadows, John Starkey
"As part of the ongoing project development for the Tenke Fungurume Copper-Cobalt Project in the Democratic Republic of Congo, Phelps Dodge Corporation has examined methodologies for determining the s
Jan 1, 2007
-
The Upgrading of Primary Gold Gravity Concentrates
By Bryn Harris, Liming Huang, Andre Laplante
"This paper reviews flowsheets generally used in gold rooms to upgrade primary gravity concentrates particularly those of Knelsons. It is concluded that even for small operations, which treat between
Jan 1, 1999
-
The evolution of advanced guidance techniques for autonomous underground vehicles
By L. Bloomquist
This paper describes how Automated Mining Systems (AMS) is evolving the state-of-the-art in guidance systems for autonomous underground vehicles. The techniques, trade-offs, and lessons learned from t
Jan 1, 2004
-
The evolution of advanced guidance techniques for autonomous underground vehicles (8e8c3b94-ac75-4947-840c-a59d92585998)
By L. Bloomquist, C. Arnoldi
"This paper describes how Automated Mining Systems (AMS) is evolving the state-of the- art in guidance systems for autonomous underground vehicles. The techniques, tradeoffs, and lessons learned from
Jan 1, 2004
-
Data is not the Problem? Good Decisions are the problem.
Today?s Topics ? Data to decision value chain ? Practical Considerations ? Example ? Before / After DSS ? Quick Decision Support Demo Practical Considerations ? More data is not necessarily bett
May 1, 2008
-
Tailings Disposal at Kidd Creek Mines Ltd.
By T. J. Yeomans
"The Kidd Creek metallurgical site is situated twenty-six kilometres east of Timmins, Ontario. The site consists of a 4.5 niillion tonne per year concentrator, a 127,000 tonne per year electrolytic zi
Jan 1, 1986
-
Choosing a SAG Mill to Achieve Design Performance
By Sami Hindstrom, Travis Orser, John Starkey
"A great deal of effort has been expended in the last 11 years by the authors and others to identify the correct power required to grind ore in a SAG mill, by developing ore hardness variability funct
Jan 1, 2003
-
Optimization of SAG Mill Process Control at the Raglan Mine
By G. Couture, J. -F. Dubé, F. Letarte-Lavoie
"The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan
Jan 1, 2013