Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Importance of Understanding 3-D Kinematic Controls in the Review of Displacement Monitoring of Deep Open Pits Above Underground Mass Mining Operations

    By J. Severin

    Surface mining operations are increasingly involving the design and development of deeper and larger open pits, often with plans to transition into underground mass mining operations. Experiences at t

    May 1, 2009

  • CIM
    Flotation Separation of Diaspore against Aluminosilicate Minerals Using N-(4-(Hydroxyamino)-4-Oxobutyl) Alkylamide Surfactants as Collectors

    By Hong Zhong, Shuai Wang, Gang Zhao, Lanqing Deng, Guangyi Liu

    In this paper, three novel surfactants containing double reactive centers(-CONHOH and –CONH-), double hydrophobic groups were designed and synthesized as collector for separation of diaspore and alumi

    Jan 1, 2016

  • CIM
    Soil profile development in vegetated uranium tailings (A Synopsis)

    By D. R. Murray

    "A promising long-term solution to uranium tailings reclamation has been the establishment of vegetation directly on the waste material. The soil profiles of areas vegetated for 0, 3, 8 and 10years ar

    Jan 1, 1984

  • CIM
    Grinding Circuit Design for Similco Mines (c92aaacb-9754-4479-979f-50ce395c95a4)

    By Ken Major, Anita Marks, Craig Sams

    In 2007 Copper Mountain Mining determined that there were sufficient resources to consider reopening the Similco Mine near Princeton, BC. The mill facility that had been built by Newmont Mining in 197

    Jan 1, 2012

  • CIM
    The use of Geosynthetics in Underground Works

    By C. Yoo

    "Geosynthetics engineering has made phenomenal advances during the last decade in areas of manufacturing as well as practical applications. As a result, geosynthetics are now being recognized as essen

    Jan 1, 2015

  • CIM
    Mass flow prediction for reagent control at Les Mines Selbaie

    By Robin Perry, Claude Bazin

    "Discrete transfer functions which use the grinding circuit feed tonnage to predict mass flowrates at reagent addition points in a flotation circuit were calibrated using a dynamic grinding/flotation

    Jan 1, 1994

  • CIM
    The Davy McKee combined mixer-settler: a novel approach to solvent extraction

    By G. A. Gillett, C. F. Bonney

    "The Davy McKee combined mixer-settler (CMS), is a liquid-liquid contactor, which has been commercially applied to the recovery of uranium from dilute sulphuric acid-bearing leach liquors. CMS differs

    Jan 1, 1983

  • CIM
    Steel Mill Dust Recycling Through the "2Sdr Process"

    By C. Pichler, J. Antrekowitsch

    During the production process of steel and other metals a lot of different by products are generated in high amounts. Some of these residues are recycled to recover valuable metals like zinc, lead, co

    Jan 1, 2014

  • CIM
    Prevention and Control of Rockbursts in Dongguashan Copper Mine

    By L. Tang

    A seismic monitoring system was installed in 2005 at Dongguashan Copper Mine, the deepest metal mine in China. Based on the seismic events monitored in situ, the possibility of rockburst prediction an

    May 1, 2009

  • CIM
    New Trends in Advanced Process Control and Impact on Minerals Processing Operations

    By Alan B. Morrow, William A. Poe

    "Minerals processing operations are constantly challenged with improving production rates, yields, energy efficiency and process stability. Advanced Process Control has proven to be an effective tool

    Jan 1, 2016

  • CIM
    Integrating Radar Proximity Sensing and Camera Vision to Improve Mining Equipment Safety with Minimal Distraction

    By Nima Nabavi

    Shovels and excavators have significant blind spots due to their large sizes, increasing the chances of collision with other surrounding equipment such as haul trucks, loaders, and dozers. While a cam

    Oct 1, 2009

  • CIM
    Development of a Softsensor for Particle Size Monitoring

    By René G. del Villar, Jules Thibault, René del Villar

    "Some key control variables of industrial processes, associated with product quality, often cannot be measured directly or frequently enough to establish adequate control. In such cases, it is possibl

    Jan 1, 1996

  • CIM
    Canadian mining automation evolution: The digital mine en route to minewide automation

    By Malcolm Scobie

    "This paper reviews the evolution of Canadian surface and underground mining automation, principally relating to: advances in communications, initial development of machine teleoperation from line-of-

    Jan 1, 1995

  • CIM
    Understanding Heat Stress Measurement & Exposure Guidelines

    By Stephen Hardcastle

    Personnel Heat Exposure Issues In Canada?s Deep Mechanized Mines ?Project developed in 2004 ?Base/precious metal industry identified heat stress/management as a major challenge affecting productivi

    Oct 1, 2010

  • CIM
    Enhancing the Collection of Rock Mass Fabric Data for Open Pit Mines

    By C. Poon

    For slope stability, knowledge of major and minor discontinuity sets that form the rock mass fabric is paramount for pit slope designs. Due to the increased awareness of health and safety in mining pr

    May 1, 2009

  • CIM
    Sulphide dust ignition resistant explosives

    By J .. R. Dalton

    "Blasting in high sulphide content ores presents at least two major safety considerations: (1) compatibility of the explosives with the ore while resident in the borehole; and (2) introduction of a fl

    Jan 1, 1994

  • CIM
    Locating Pre-Slide Topography Using Site Investigation Data, Case Study of the Maskun Landslide, Iran

    By V. Maazallahi, A. Rouleau, A. Saeidi

    "The geometry of the terrain topography before and after the failure are the essential factors for analyzing a landslide and for the design of remedial works. This paper presents a method to determine

    Jan 1, 2015

  • CIM
    Process for the Precipitation of Pure Jarosite

    By M. Lahtinen, B. Saxén, M. Latva-Kokko

    The conventional jarosite precipitation process with neutralization by zinc calcine is widely utilized in the zinc industry. However, it has a significant drawback of causing losses of valuable metals

    Jan 1, 2016

  • CIM
    Acceleration of Project Schedule for Targeting Early Revenue Streams

    By Zia Pirzada

    "Time is of the essence" and "Time is money" These are powerful and true statements during a project life cycle and have far-reaching implications on the success and failure of the project Time and p

    Oct 1, 2010

  • CIM
    Decommissioning of the Brenda Mine Near Peachland, British Columbia

    By Ron Bradburn, Derek Perkins

    "The Brenda mine is located in south central British Columbia, 22 km north west of Peachland, in the heart of the Okanagan Valley. Situated at an elevation of 1500 metres, the mine area straddles the

    Jan 1, 1995