Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Challenges of ISRU Rover Development

    ?Four-wheel, skid-steer, rover developed for CSA ?U-chassis for payload accommodation ?Passive geometric suspension ?Max speed 13km/hr ?Remote workstation ?275kg payload capacity ?On-board

    May 1, 2013

  • CIM
    Pillar Extraction in Thick Coal at Canmore, Alberta, on Gradients Between 5 and 30 Degrees

    By H. G. Stephenson, C. W. Gregory

    "This article describes the methods used for pillar extraction in the Wilson Seam at Canmore Mines, Alberta. The Wilson Seam is extremely gassy and varies in thickness between 7 and 30 ft, with an ave

    Jan 1, 1972

  • CIM
    Development of Corrosion-Resistant Low Alloy Steels for Commercialization

    By B. Voyzelle

    The deterioration of highway and bridge infrastructure has received considerable attention in recent years because of the billions of dollars needed for repair and rehabilitation. A major factor contr

    Jan 1, 2005

  • CIM
    Canadian Steel Foundry Practice

    By S. L. Gertsman

    Canadian steel foundry practice has made marked progress during the past decade. Equipment suppliers, development engineers, and foundry personnel have focussed their attention on every phase of the f

    Jan 1, 1948

  • CIM
    III.-Rock-Bursts at Lake Shore Mines

    By W. T. Robson

    ONE of the problems encountered in any mine is the effect of increasing pressure manifested by increasing depth. Although the depth at which excessive pressure assumes serious proportion, and the mann

    Jan 1, 1940

  • CIM
    Investigation of Sorting Technology to Remove Hard Pebbles from an Autogenous Milling Circuit

    By P. Condori

    Palabora Mining Copper has a unique ore body composition which unlike other copper ore bodies has three main components in significant proportions; these are copper bearing ore, magnetite and dolerite

    Jan 1, 2012

  • CIM
    Deepening ‘C’ Shaft at Giant Yellowknife with the Cryderman Shaft Mucker

    By G. A. Pinsky, Pickard M. K

    "IntroductionTWO METHODS of mucking have been used in sinking C shaft, the five-compartment production shaft of the Yellowknife property of Giant Yellowknife Gold Mines, Limited:(a) Band mucking durin

    Jan 1, 1955

  • CIM
    The Separation .of Acid-Consuming Minerals from Pitchblende by Flotation

    By G. B. Hudson

    Previous papers (1, 2) pertaining to the treatment of uranium-bearing ores were concerned with the flotation of the radioactive minerals. In this investigation, the application of flotation to the rem

    Jan 1, 1963

  • CIM
    A Pilot-Scale Examination of a High Pressure Grinding Roll / Stirred Mill Comminution Circuit

    By J. A. Drozdiak

    In this paper we examine, through pilot-scale testing, the possibility of operating a circuit comprised of two stages of HPGR comminution, followed by grinding through a horizontal stirred mill. In or

    Jan 1, 2012

  • CIM
    The Starved Acid Leach Technology (SALT) for Processing Of Nickel Laterites and Caron Plant Tailings

    By J. D. Clucas, D. B. Dreisinger

    "The Starved Acid Leach Technology (SALT) has been developed by Search Minerals to extract nickel and cobalt VALUES (from nickel laterite ores (saprolites) and Caron plant residues. The technology con

    Jan 1, 2012

  • CIM
    Safety Phases in Mechanized Mining in the State of Washing ton

    By S. H. Ash

    No single factor in modern civilization has played a more important part in the lives of our people than mechanization in industry and to it civilization owes much of its progress. In no industry has

    Jan 1, 1937

  • CIM
    Some Recent Observations in Mining Safety

    By S. H. Ash

    Introduction Probably the newest thing in mining safety is the apparent dissatisfaction on the part of the mineral industry, as represented by both management and labour, and the general public of

    Jan 1, 1950

  • CIM
    Energy Management at Inco

    By J. G. Cullain

    Inco Limited is an integrated mining, smelting, refining and manufacturing company with operations located worldwide. The Ontario Division operations consist of 13 mines and 10 processing facilities l

    Jan 1, 1977

  • CIM
    The Flash Recycle System for the Cooling of Autoclaves Process Design and Operation

    By F. Crundwell, N. Steenekamp

    "The leaching of sulphide minerals generates a significant amount of energy. There are three systems that might be used to remove this energy. These are: cooling coils, quench water, and flash recycle

    Jan 1, 2012

  • CIM
    The Engineer and the Diamond Drill in Northern Ontario

    By C. H. Hopper

    DIAMOND drills have played an important part in the development of mines for many years. Recently. they have also entered the production field arid the use of diamond drills m the primary breaking of

    Jan 1, 1943

  • CIM
    Exploration• Expenditure, Discovery Rate and Methods

    By D. R. Derry

    This paper up-dates an earlier paper by the author on the rate of new Canadian mineral discoveries and the exploration methods which were principally responsible for these finds. He concludes that the

    Jan 1, 1970

  • CIM
    Lateritization as a Major Process of Ore Deposit Formation in the Amazon Region

    By Marcondes Lima Costa

    Abstract-The Amazon region is characterized by the development of deep chemical weathering represented by widespread lateritic covers and soils. Two distinct periods of laterite formation can be disti

    Jan 1, 1997

  • CIM
    Lateritization as a Major Process of Ore Deposit Formation in the Amazon Region (5b5e5ff1-6b6d-4fad-a9e8-f2a546f4af00)

    By Marcondes Lima Costa

    The Amazon region is characterized by the development of deep chemical weathering represented by widespread lateritic covers and soils. Two distinct periods of laterite formation can be distinguished:

    Jan 1, 1997

  • CIM
    Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce Costs

    Mining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins

    May 1, 2013

  • CIM
    Operational Characteristics of the TankCell® 300 at Codelco's Chuquicamata Concentrator

    By S Grönstrand, C. Perez, A. B. Yañez, F. Coddou, P. Morales, H. Elgueta

    "The TankCell® 300 forced air flotation cell designed and built by Outotec, with active volume of over 300 m3, was installed at Codelco’s Chuquicamata concentrator in September 2008. After that, a pro

    Jan 1, 2010