Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Infrared Imager as a Tool for Monitoring of Power Shovels, Gearcase Bearings and Electric Motors
Thermal method of diagnostic as a nondestructive monitoring is based on data logging of infrared radiation from heated surface or from the associated thermal field. Monitoring of gearcases and motors
Dec 6, 2010
-
Various Interpretations of Coal Petrographic Nomenclature and their Effects on Maceral Analyses
The commonly used Stopes-Heerlen coal petrographic classification and nomenclature has over the years been subject to variable interpretations. This paper discusses the problem with specific reference
Jan 1, 1970
-
Plant and Method of Manufacture of Portland Cement at Limestone Island
WITH the exception of the deposits of the Milburn Cement Co near Dunedin, Wilson's Portland Cement Co., on the Mahurangi River (a short distance north of Auckland), and those of the New Zealand P
Jan 1, 1912
-
Characterisation and Monitoring of the Stress State of Production Pillars at El Teniente Mine
By R Munoz, R González, J Vallejos, A Delonca
In panel caving in underground mines, it is essential to characterise and monitor the stress and stability state of production level pillars to ensure the extraction of the mineralised ore column and
May 9, 2016
-
Metallurgical Effects Associated with the use of Cemented Backfill at the Zinc Corporation, Limited and New Broken Hill Consolidated Limited
The addition of cement to underground backfill at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill commenced in 1967. A deterioration in metallurgical performance at
Jan 1, 1971
-
The Macraes Gold Mine Development of a Major Resource
The Macraes Mining Company Limited was listed on the New Zealand and Australian stock exchanges in January 1990, and the proceeds of the float were used to purchase a 70 per cent interest in the Macra
Jan 1, 1991
-
Mineralogical Assessment of a Churn-Drill Core form an Alluvial Tin Deposit
Some of the problems associated with drill core evaluation of alluvial tin deposits and correlation with plant-scale recovery are discussed. Panning churn-drill cores on site tends to undervalue such
Jan 1, 1970
-
Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited
By Harris J. W
The treatment plant at The Great Boulder Proprietary Gold Mines Limited was designed and erected by Chas. Ruwolt Proprietary Limited in 1934 to mill 12,000 short tons per month. The flow sheet called
Jan 1, 1955
-
The Failure of Lead by Creep
From time to time lead, which is normally considered to be a soft ductile metal, fails by cracking. The cracks which form appear to be of two distinct types-(a) those which follow a zig-zag course aro
Jan 1, 1935
-
Deterministic Expert Systems : A New Planning Tool for Project Development
Project developent proceeds by increasingly detailed studies addressing overall project returns through an analysis of the substance, risks and costs associated with the following elements: ò Reserv
Jan 1, 1989
-
Genetic Classification and Prospectivity of Gold-Bearing Veins in the Otago Schist, New Zealand
By R J. Norris, D J. MacKenzie
Gold-bearing veins have formed at a wide range of depths throughout the uplift history of the Otago Schist. The earliest gold mineralisation occurred during the later stages of Mesozoic metamorphism.
Jan 1, 2000
-
Hydrologic and Environmental Changes in the Gippsland Basin
The Gippsland Basin, southeastern Australia, has an Upper Cainozoic history of episodic change of hydrology and the related environment, reflected in the geomorphology and surficial deposits of the
Jan 1, 1992
-
Key Differences Between In Situ Recovery Mining and Conventional Mining
By S Telford, J Weir
Heathgate Resources Pty Ltd (Heathgate) operates the Beverley Uranium Mine in South Australia, located on the plains between the northern Flinders Ranges and Lake Frome some 600 km north of the state
Jan 1, 2008
-
Optmization of Copper Electrowinning at High Current Densities
A detailed study of the capital investment and production cost for copper electrowinning plants shows that significant savings in both can be achieved by increasing the current density. From the econo
Jan 1, 1972
-
Micro Examination of Some Samples From the Lead Refining Process
By Wesley, Worner H
During the meeting of the Institute last year at Port Pirie, the opportunity was taken to sample the lead bullion coming from the blast furnace and various stages during the refining process. Also, in
Jan 1, 1938
-
The Determination of Certain Curves and Their Application to the Desilverisation of Lead by the Parkes Process
WHILE in the employ of the Broken Hill Associated Smelters and the Electrolytic Zinc Oompanies at their South Melbourne Research Station, the writer was detailed to investigate the principles underlyi
Jan 1, 1925
-
Some of Features of Lead Blast-Furnace Opeartions at the Works of the Broken Hill Associated Smelters Proprietary Limited, Port Pirie, S.A.
IN this paper it is proposed to present certain features of operating practice at the Port Pirie works of The Broken Hill Associated Smelters Proprietary Limited, in the smelting in a blast furnace of
Jan 1, 1931
-
Arc Exploration from the Hydrothermal Plume Perspective
By C E. J de Ronde, I C. Wright
Oceanic subduction-related volcanic frontal arcs extend over 20 000 km within the western Pacific basin and over 21 500 km worldwide, yet they remain largely unexplored with respect to active seafloor
Jan 1, 2002
-
Water Quality Standards with Reference to the Mining Industry in New Zealand
Water quality standards for some of the substances likely to be discharged to natural waters by the mining industry are discussed. After briefly examining how uses of water can be affected by discharg
Jan 1, 1986
-
All-Flotation at North Broken Hill Limited
Author's Note: Since the paper on "All-Flotation at North Broken Hill Limited" was read and discussed, the metallurgical results obtained have conclusively justified the adoption of the
Jan 1, 1931