Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Bougainville Copper ProjectThe mining. operations of Bougainville Copper Pty Limited are located at Panguna on the Island of Bougainville which is part of the Territory of Papua and New Guinea. Mineralisation in the Panguna ar
Jan 1, 1970
-
Preliminary Assessment of Sampling Techniques at Hilton MineAt Hilton Mine, 18 kilometres north of Mount Isa, the silver-lead-zinc sulphide bodies have undergone strong deformation in the form of folding and later faulting and brecciation in the hangingwal
Jan 1, 1976
-
Post-Mortem Findings on the Performance of Engineered SRB Field-Bioreactors for Acid Mine Drainage ControlBy M A. Harrington-Baker, J M. Trudnowski
Sulfate-reducing bacteria (SRB) have the ability to immobilise dissolved metals by precipitating them as sulfides, provided that a favourable biochemical environment is created. Such an environment in
Jan 1, 2003
-
A User-Oriented, Mini Computer Based System for Open Cut Coal Mine PlanningBy Van Hoorn PD
For the development of BHP's Gregory open cut coal mine in Central Queensland a mini computer was successfully used to assist staff in the evaluation of the deposit and the planning of the mi
Jan 1, 1978
-
Two Colombian TunnelsThe 5.6 km Canning Tunnel was constructed to improve water supply from Canning Dam to the Perth metropolitan area. The site area is in the Darling Range which is essentially a laterite-capped plate
Jan 1, 1976
-
Breakthrough in elliptical motion screen trial delivers significant performanceBy D Teyhan, J Kirsch
Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive
Aug 24, 2022
-
Breakthrough in elliptical motion screen trial delivers significant performance gainsBy D Teyhan, J Kirsch
Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive
Nov 8, 2021
-
Trends in Magnetite Ore Processing and Test WorkBy D Yan, D Connelly
Beneficiation of magnetite is an integral part of the future of iron ore processing. Historically, the focus of Western Australian producers has been on exporting direct shipping ore (DSO) namely haem
Jan 1, 2009
-
Lateritic Weathering of Serpentinite at Rockhampton, QueenslandBy Hewitt D
A study of two laterite profiles developed on a serpentinite near Rockhampton, shows that loss of Si02 and MgO results in the relative concentration of Fe203, A1203 and a number of minor elements.
Jan 1, 1974
-
Mining Explosives Security ù Complacency No LongerA mining companyÆs approach to managing the risk of theft of explosives and initiating devices should be underpinned by an organisation-wide policy developed with internal and external consultation. I
Jan 1, 2004
-
Decline Excavation by Roadheader at Ballarat EastBy Dorricott M. G
Ballarat Goldfields NL is developing an exploration decline at Ballarat East using a Mitsui Miike S-125 roadheader. To-date, 530 in of advance has been achieved at an average rate of 16.1 m/week. Ro
Jan 1, 1995
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation ObjectivesBy A A. Puhalovich
The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca
Jul 10, 2012
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Optimisation of the Prominent Hill Flotation CircuitBy P Woodward, T Ly, N Muhamad
OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial
Jul 15, 2013
-
Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa MinesBy J Simpson, M Johnston
Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n
Jan 1, 2003
-
Site Investigation and Design for Melbourne’s New MetroBy H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022
-
The Behaviour of Sulphur in the Sherritt Zinc Pressure Leach ProcessBy Collins M. J, Ozberk E
A major advantage of the Sherritt Zinc Pressure Leach Process is the conversion of sulphide sulphur in zinc concentrate to elemental sulphur during pressure leaching. Elemental sulphur can be recove
Jan 1, 1993
-
Coal - Paper No. 11 Various Interpretations Of Coal Petrographic Nomenclature And Their Effects On Maceral AnalysisBy Diessel C. F K, Ng N
The commonly used Stopes-Heerlen coal petrographic classification and nomenclature has over the years been subject to variable interpretations. This paper discusses the problem with specific refere
Jan 1, 1969