Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005

  • AUSIMM
    Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset

    By J Deraisme, P Epinoux, O Bertoli

    "Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr

    Nov 24, 2014

  • AUSIMM
    Thermodynamic modelling of the Fe-Al-Ti-O system and evolution of Al- Ti complex inclusions during Ti-added ultra-low carbon steel production

    By Y B. Kang, Y J. Park

    Ti-added ultra-low carbon (ULC) steel is produced by adding Al and Ti during the secondary refining process to deoxidise molten steel and to bind C and N which are detrimental to the deep drawing qual

    Aug 21, 2024

  • AUSIMM
    Coke Bed and Liquid Flow in the Lower Part Dissected No. 1 Blast Furnace at Chiba Works

    By Konishi Y, Morioka Y, Okabe K

    A part of the results of dissection survey of Chiba No.1 blast furnace, Kawasaki Steel Corporat- ion, is presented. Distributions of coke size and of slag and metal holdup are shown in the region of

    Jan 1, 1981

  • AUSIMM
    Kisoro-Kabale iron ore project in south-western Uganda – unlocking a new high-grade iron ore region for exploration and development

    By B Vietnieks, N Widmer, L White, E Tata, J Natukunda, D C. Ilouga, J P. Tyler

    The Republic of Uganda aims to exploit its’ significant, un-developed iron ore resources to supply the required raw material for developing its’ iron and steel industry across all the stages of the su

    Sep 18, 2023

  • AUSIMM
    The Konongo Gold Project, Ghana – An Example of How Geology Makes All the Difference to a Resource Estimate

    By R Sterk, B Reid

    The Konongo Gold Project is located on the western margin of the 125 Moz Ashanti Gold Belt in Ghana, West Africa. It is situated 60 km along strike of the world-class mineral system at Obuasi and is i

    Aug 18, 2014

  • AUSIMM
    Resource Efficient Mining Processes of Tomorrow

    By P Holtham, K Duffy, W Valery, A Jankovic

    In the face of increasing energy costs, limited water resources, more stringent legislation, and lower feed grades, the mining industry is searching for more sustainable technologies and practices. Me

    Nov 4, 2015

  • AUSIMM
    Theory of Safe and Efficient Co-extraction of Coal and Gas and its Applications

    By J-T Zhu, Q-Y Tu, S-L Kong, L Wang, Y-P Cheng, H-Y Liu, Q-L Yang

    China is the largest coal-producing country in the world, while the geological conditions of deep coal mining are extremely complicated with high ground stress, high gas pressure and low permeability,

    Aug 31, 2015

  • AUSIMM
    Sensitivity Analysis and the Mine Development Decision

    Traditionally, the development of a mineral resource project goes through a fairly set pattern of decisions from what commodities to search for; where to look; how to locate; what are the reserves

    Jan 1, 1983

  • AUSIMM
    Study on change in mould slag characteristics during casting Ti containing steel grades

    By M Ranjan, C R. Borra, P Palai, P P. Sahoo

    Change in mould slag composition during casting of medium alloy steel is caused by the redox reaction between molten steel and mould flux. Mould flux generally contains a certain amount of SiO2, but e

    Aug 21, 2024

  • AUSIMM
    Process Control Developments at Queensland Alumina

    The completion of the 3rd expansion at Queensland Alumina added 725,000 t.p.y. capacity to what was already the world's largest alumina refinery. Rated design capacity is now 2.0 million t.p.

    Jan 1, 1974

  • AUSIMM
    Oxidative combustion law of water soaked coal under oxygen-lean condition

    By H Y. Niu

    The coal left in the goaf is easily submerged by groundwater damage. During the mining process of the underlying coal seam, it is necessary to drain the water in the overlying goaf. The coal sample is

    Oct 12, 2022

  • AUSIMM
    Behaviour of iron ore granules – laboratory and commercial sinter plant granulation

    By O A. Aladejebi, S Mitra, T Singh, D J. Pinson, S, S J. Chew, T Honey

    Currently, many commercial sinter plants are exploring the potential addition of high-grade iron ore concentrates to improve the sinter grade. A better understanding of the ore blend, granule behaviou

    Sep 18, 2023

  • AUSIMM
    Developing a best practice framework for inrush risk management

    By L Manca, P B. Hills, D Tyler, N Pollington

    This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in

    Mar 15, 2021

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014

  • AUSIMM
    Blasting Vibration Assessment and Innovative Blasting Methods in High-density Urban Environments

    By J W. Muir, N Bedford

    Hong Kong is one of the most rapidly developing cities in the world. With constant population growth and limited opportunities for space, the development of a fast and effective underground public tra

    Sep 17, 2014

  • AUSIMM
    Design and Engineering of Flotation Circuits (in Australia)

    By D Mcleod, S Brindley, S Green

    The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit

    Jan 1, 2005

  • AUSIMM
    Ground Support Design and Application for Developing in Pastefill at BHP Billiton – Cannington Mine

    By J Li

    Cannington Mine has been developing through paste backfilled stopes since the year 2000. These paste drives have been used as either production drill accesses or long-term bypasses. Prior to this stud

    Mar 21, 2011

  • AUSIMM
    A guide to reporting Mineral Resource exclusive of Mineral Reserve

    By H Arvidson, V Chamberlain, R Marinho, B Parsons, T Rowl, M Noppé, M Mattera

    With the introduction of CRIRSCO (2019) based mineral asset disclosure, Regulation S-K part 1300, 2019 (S-K1300) by the United States (US) Securities and Exchange Commission (SEC), applicable to compa

    May 24, 2023

  • AUSIMM
    Carburisation and melting of hot compacted iron in a coke bed

    By M Kim, J Park, I-K Suh, E Kim, J Lee

    One of the key technologies in developing hydrogen-enriched ironmaking operations is the control of the carburisation, melting, and dripping behaviour of the iron ore burden materials. When a hot comp

    Aug 21, 2024