Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effect of Flotation Feed Density on the Operation of a Flotation Cell

    By R Crosbie, K C. Runge, E Tabosa, J K. McMaster

    Flotation feed density is an operating parameter which is currently not well understood. Most models of flotation only incorporate its effect on particle residence time, but it is likely to have addit

    Oct 29, 2012

  • AUSIMM
    Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy System

    ABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region

    Jan 1, 1971

  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    Iran Mining Industry Based on the 20-Year Perspective 2025

    By F Rashidinejad

    Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many

    Nov 22, 2011

  • AUSIMM
    Platinum Mining and Sustainability - Understanding the Environmental Costs of Future Technologies

    By G M. Mudd

    The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain

    Jan 1, 2009

  • AUSIMM
    Shifting the comminution workload from the primary ball mill to TowerMill circuit

    By H Ishikawa, R Halomoan, S Palaniandy

    The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,

    Aug 29, 2018

  • AUSIMM
    The study of applying dry cobbing pre-concentration and its impact on concentrator efficiency and pit optimisation – Yogi BIF magnetite iron ore mine

    By M Saghaeian, V Sheikhzadeh, R Hejazi

    Mining dilution is one of the most important factors affecting the economy of mining projects. Instead of quantifying dilution in mining studies, it is common to assume a general dilution such as 5 pe

    Aug 24, 2022

  • AUSIMM
    Development and implementation of low-cost sensors and LiDAR for managing dust emissions due to mining activity

    By J Holdsworth, L Sutton, A Lavrinec, D Ilic

    Air quality is a big topic of discussion in regional mining communities as well as urban environments situated close to port terminals handling bulk solids. Community perception of poor air quality ca

    Sep 18, 2023

  • AUSIMM
    Development of a Near Field Damage Model for Cemented Hydraulic Fill

    By G P. F Chitombo

    The dilution of blasted ore with cemented backfill materials has been recognised as a significant factor influencing the economics of some underground metalliferous mining operations. Several mechanis

    Jan 1, 1998

  • AUSIMM
    Old Stopes and New Simulations – A Structural Modelling and Resource Estimation Case Study of the Edna May Gold Mine, Western Australia

    By P Hodkiewicz

    Recent structural interpretations based on historic stope shapes were used to develop a rapid and innovative method to domain and simulate structurally complex, high-grade gold veins at depth in the E

    Aug 22, 2011

  • AUSIMM
    Bubble Surface Area Flux-A New Criterion for Flotation Scale-up

    By burgess F, Manlapig E. V, Franzidis J. P

    Bubble surface area flux, a parameter which is determined by bubble size and superficial gas velocity, has been identified as a criterion for flotation scale-up from a metallurgical point of view. I

    Jan 1, 1997

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • AUSIMM
    Technology change by regulation – a cresting wave?

    By J D. Pease, J M. I Tuppurainen, P D. Munro

    This paper examines how legislation and regulation can be external drivers of technical change in mineral processing and extractive metallurgy and how the industry can respond. Two examples are consid

    Sep 11, 2017

  • AUSIMM
    Spatial Modelling and Optimisation of Geometallurgical Indices

    By M J. Newton

    As part of the AMIRA P843 project Keeney and Walters (2008) describe how the principal components analysis (PCA) method can be used to identify classes of samples with similar metallurgical characteri

    Sep 5, 2011

  • AUSIMM
    Cyclic and Post-cyclic Behaviour of Four Australian Tailings

    By R Fanni, D Reid, M Kulessa

    Recent updates to Australian industry guidelines emphasise the importance of the assessment of liquefaction potential of tailings. This includes assessment of the cyclic liquefaction potential, and th

    Jul 27, 2015

  • AUSIMM
    Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite Concentrates

    By D R. Seaman, B Adamson, F Burns, B A. Seaman, P Manton

    The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines w

    Oct 29, 2012

  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    True Pipe Sampler – A Correct Design Utilising the Principle of Symmetry in Pressurised Slurry Particulate Streams

    By G J. Halstead, R C. Steinhaus

    The True Pipe® in-line sampler was developed in an attempt to address the need for a mechanically reliable and correctly designed sampler to suit one-dimensional pressurised slurry pipelines, often fo

    Jul 29, 2014

  • AUSIMM
    Exploring Community Involvement in a Major Infrastructure Project û Case of an Oil Pipeline in Eastern Siberia

    Addressing community concerns in relation to an economic activity, particularly when it causes significant community impacts, is especially important for the development of extractive industry project

    Jan 1, 2009