Search Documents

  • SME
    Tunneling Through Mountain Faults

    By Don W. Deere

    Faults under high rock cover represent some of the most severe ground conditions a Tunneler can encounter. High ground water pressures and flows are usually associated with mountain faults. Ground beh

    Jan 1, 2007

  • AUSIMM
    Characterisation of Ore Crushability Using Petrophysical Properties

    By P Fullagar

    Automated multi-sensor core loggers (MSCL) measure petrophysical properties of diamond drill cores, including gamma density, P-wave velocity, electrical conductivity and magnetic susceptibility. A Geo

    Jan 1, 2009

  • AUSIMM
    Paper No. 128. The Rise And Fall of Dry Crushing on The Hauraki Goldfield.

    n the early days of the Hauraki goldfield (1866 to 1889) almost the only system of ore treatment was wet crushing followed by copper plate amalgamation. A further saving of bullion was in most cases o

    Jan 1, 1903

  • AUSIMM
    Mineral Project Management - A Perspective from Four Decades in the Industry

    By J S. Dunlop

    At its most basic level, minerals project management may be broken down into a series of logical chronological phases, described in this paper as: exploration, discovery; scoping and pre-feasibility;

    Jul 15, 2013

  • AUSIMM
    Kalgoorlie Geology Re-Interpreted

    By Miller F. S

    The famous Golden Mile of Kalgoorlie in Western Australia was, between 1888 and 19ft, one of the richest and most important gold camps in the world. Annual production, which reached a peak of nearly 1

    Jan 1, 1937

  • AUSIMM
    Some Features of Lead Blast-Furnace Operations at the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie, S.A.

    The discussion which followed the publication of my paper by the formert has, I think, enhanced its value. It may therefore be of interest to members of our Australasian Institute, who are not members

    Jan 1, 1932

  • SME
    Effective Planning Of Underground Space?Planning And Implementation Of The First Underground Water Reservoirs In Hong Kong

    By T. H. Chan

    As the University of Hong Kong and their advisors planned their new Centennial Campus it became clear that they would have to re-provide existing water reservoirs on an adjacent site with new salt wat

  • ABM
    AVALIAÇÃO DA HOMOGENEIZAÇÃO DE LIGA Ti35Nb PROCESSADA POR METALURGIA DO PÓ E EXTRUSÃO ANGULAR EM CANAL

    By Juan Garcia de Blas

    O presente trabalho aborda o desenvolvimento de liga titânio-nióbio obtida por metalurgia do pó no qual foi introduzida uma operação de extrusão angular em canal (Equal Channel Angular Pressing - ECAP

    Aug 17, 2017

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959

  • SME-ICGCM
    Evaluation Of Tailgate Ground And Support Interaction In The Illinois Basin For The Development Of A Ground Reaction Curve Based Standing Support Design (b187e562-fd74-46c1-b2f9-93667db20030)

    By Dennis Dolinar

    Improperly designed support systems have led to unplanned roof falls in longwall tailgates. To prevent such falls requires appropriate support and adequately designed support systems. The National Ins

    Jan 1, 2009

  • AUSIMM
    Adjusted Real Option Valuation to Maximise Mining Project Value - A Case Study Using Century Mine

    By M Nehring, E Topal

    Nowadays mining projects are seeking new versions of evaluation that are based on the flexibility in the project. Real option valuation (ROV) is one of the modern evaluation methods that provides a to

    Jan 1, 2009

  • SME
    Rehabilitation of a Brick-Lined Aqueduct

    By Taehong Kim, Carl Pannuti, Nikolas Sokol, Walter Herrick

    BACKGROUND This paper discusses work performed as part the rehabilitation of the gravity flow section of the New Croton Aqueduct (NCA) during an approximately two year period between 2004 and 2006

    Jan 1, 2007

  • AUSIMM
    The Fall and Rise of the Feasibility Study

    The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval

    Jan 1, 1990

  • AUSIMM
    An Analysis of Breakage Processes Within Rod Mills

    By Lynch A. J

    Comminution within rod mills has been investigated by use of a matrix analysis of breakage processes. A parameter, the number of breakage stages, has been introduced and comminution within all rod mil

    Jan 1, 1964

  • ISEE
    A New Generation of Shock Tube Detonators

    By John Watson

    The earliest known records related to mining document in dramatic terms the fact that mining methods have undergone significant change over the centuries. Wooden wedges, hammers and chisels, “fne sett

    Jan 1, 1997

  • SAIMM
    Maximizing Haematite Recovery Within a Fine and Wide Particle-Size Distribution Using Wet High-Intensity Magnetic Separation

    By M. Dworzanowski

    The physical beneficiation of iron ore that has a wide particle-size distribution is problematic, regardless of the process applied, whether dense medium separation, gravity concentration, magnetic se

    Jan 1, 2014

  • SME
    Numerical Evaluation of Tunnel Lining in Visco?elastic creep active ground

    By Kyoosang Yoo

    The report presents the results corresponding to the analysis of a lining system for tunnels in soil and soft rock in creep-active ground. The purpose of the analysis is to evaluate the performance of

    Jan 1, 2010

  • CIM
    Engineered Membrane Separation® (EMS®) Systems for Hydrometallurgical Applications

    By Larry A. Lien

    "A brief summary of the different membrane separation options currently available to the mining industry will be presented and discussed. The processes described involve operating membrane plants on t

    Jan 1, 2010

  • ISEE
    Using Photogrammetry Data from Unmanned Aerial Vehicle (UAV), Small Unmanned Aircraft Systems (sUAS) for Blast Design

    By Luis Valentim, John E. Wiegand

    Highwall or face profiling has long been used to facilitate the design and placement of front row blastholes to ensure optimum burdens. Traditionally, a large number of laser measurement points obtain

    Jan 1, 2016