Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • SME-ICGCM
    Underground Movement Of Rock Mass And Stress Distribution Due To Multiple Mining

    By Victor V. Nazimko

    Multiple mining generates gob-interaction displacements. They redistribute stress m strata and obey laws of irreversibility thermodynamics. An irreversible state causes inhomogeneity of the stress dis

    Jan 1, 1996

  • SME-ICGCM
    Jenmmar Compression Roof Control System

    By John C. Stankus

    To improve mine roof bolt performance, Jennmar Corporation commenced the design and development of a new roof control sys- tem. This new system designated "Insta'l Compression", not only improves

    Jan 1, 1990

  • SME-ICGCM
    Rating Coal Mine Roof Strength From Exploratory Drill Core

    Characterizing coal mine roof rock is extremely important for hazard assessment, reinforcement, and entry design. The Coal Mine Roof Rating (CMRR) is an innovative rock mass classification that has fo

    Jan 1, 1996

  • SME-ICGCM
    Destressing Practice In Rockburst-Prone Ground

    By J. Willan

    This paper addresses the problem of designing a destress blasting procedure to reduce the incidence of rockbursting in hard rock mines. A review is made of the developed theory and practice of destres

    Jan 1, 1984

  • SME-ICGCM
    Track Entry Deformation Subjected to Longwall Mining in the Overlying Seam: a Case Study

    By Wenbing Xie

    At Renlou Coal Mine, Huaibei Mine Area, the track entry deformed significantly after longwall mining in an overlying multiple seams. The supporting characteristics of primary roof bolts and shotcrete

    Jan 1, 2012

  • SME-ICGCM
    Applications Of New Technologies To The Technical Design And Monitoring Of Longwall Panels

    By Brad R. Blair

    This paper will review impacts on longwall design and ground stability assessment due to advances in mine automation and sensing technology. Several new approaches to the prediction and monitoring of

    Jan 1, 1996

  • SME-ICGCM
    Cable Support Systems For Longwall Gate Road Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar

    Jan 1, 1995

  • SME-ICGCM
    Prediction of surface movement with emphasis on horizontal deformation due to mining

    By Mao Bai

    In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e

    Jan 1, 1989

  • SME-ICGCM
    Physical Simulation of Overburden Movement and Stability of Aquiclude in Shallow Seam Mining

    By Qingxiang Huang

    Shallow seam coal field has the largest coal reserve in China. Mining in shallow depth causes serious problems. One of them is subsurface dewatering. In this paper, the physical simulating model was p

    Jan 1, 2006

  • SME-ICGCM
    Relationship between the clay fabric of roof shales and roof collapse in mines of the Herrin cod, southern Illinois

    By Theresa M. Bodus

    The strength of roof shales is, in part, a function of the preferred orientation of clay minerals within them. Therefore, analysis of clay fabric under both air-dried and hydrated conditions should be

    Jan 1, 1989

  • SME-ICGCM
    Pillar Design Considering the Plastic Behavior of the Coal Seam

    By Andre Zingano

    The variation in pillar behavior at underground coal mines working in the Bonito coal seam is observed in both research and mining company case studies. There is no consistency in pillar behavior, as

    Jan 1, 2012

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • SME-ICGCM
    Three-dimensional FEM analysis to sale field measurements from deep mine accessways

    By M. J. Beus

    A shaft is truly the "lifelinen of an underground mine. Damage to the shaft lining and guides as a result of ground movement can result in serious loss of production and extensive and continual repair

    Jan 1, 1989

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    Crinum Mine 15 Longwalls in Weak Roof What Did We Learn about Supporting the Ground?

    By Dan Payne

    The Crinum mine has recently completed workings in the southern area of the mine. Over the 10 years of longwall production 40 million tonnes have been extracted and the mine has experienced over 40 lo

    Jan 1, 2008

  • SME-ICGCM
    Comparative Study Of Western US Longwall Panel Entry Systems

    By Khamis Y. Haramy

    This paper summarizes ground control studies of longwall panel entry systems in two Western U.S. coal mines. Presented are comparisons of in situ pressure change measurements and assessments of chain

    Jan 1, 1989

  • SME-ICGCM
    New Monitoring Technologies for Measuring the in-situ Performance of Rock Bolts

    By Hani Mitri

    Understanding the interaction between rock bolts and underground rock movement is critical for safe and cost effective underground excavation design. Although early research on this subject involved a

    Jan 1, 2012

  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004