Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving MiningBy Qiang Fu
ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element
Jan 1, 2002
-
Prediction of Roof Fall Rate in Coal Mines Using Fuzzy LogicBy Ebrahim Ghasemi
Roof fall risk is a common problem in coal mines, and it is generally unpredictable due to variability in geological and mining parameters. In this study, a new fuzzy logic model was developed to pred
Jan 1, 2011
-
The Introduction of Uk Rockbolting Technology into Coal MinesAround the WorldBy Graham Daws
The introduction of UK rock bolting technology has been applied in many large underground coal mines around the world. This paper explains the methods that have been applied for its successful introdu
Jan 1, 2011
-
Cyprus Shoshone Tailgate Roof Control: Case StudyBy Andrew P. Schissler
Cyprus Shoshone is an underground coal mine in southern Wyoming owned by Cyprus Coal Company, a subsidiary of Cyprus Minerals Company. To date, seven longwall panels have been extracted from the pitch
Jan 1, 1993
-
The Design And Application Of Propsetter? In Underground Coal MinesBy Clifford McCartney
The PropsetterTM System has been designed and developed to cost effectively solve problems experienced with conventional underground supports used in tailgates, headgates, bleeder entries and as suppl
Jan 1, 1995
-
Surface Flooding-Considerations For Mining Facilities Site SelectionBy Daniel S. Mazzei
This paper will be a general discussion of surface flooding considerations as they affect mining facilities site selection, based primarily on experience with several such problems with which MSHA&apo
Jan 1, 1982
-
Modeling of Joint and Fracture Distributions in Rock Mass Before and After BlastingBy Binchuan Zhang
Based on the theory of fracture mechanics and blasting, computer simulations were performed to predict the original rock mass structure and those rock mass structures damaged at different levels uing
Jan 1, 2001
-
The Autowarning Telltale: A New Safety Monitoring Device for Pillar Extraction OperationsBy David Bigby
Room and pillar mining with full pillar extraction is one of the most hazardous systems of underground coal mining, a significant hazard being the potential for sudden goaf override. The Autowarning
Jan 1, 2011
-
Eclipse System Bolting In The Illinois BasinBy Alan Campoli
Approximately 100 million fully grouted rebar roof bolts are installed each year in the United States, 80% are B-Series (5/8 inch fully grouted rebar in a one-inch borehole). The lesser used more expe
Jan 1, 2004
-
New Approach to Evaluate the Stability of Yield PillarsBy Khaled Morsy
In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica
Jan 1, 2003
-
Drivage System In Retreat Longwall GateroadBy Kikuo Matsui
In a difficult economic environment, the coal mines in Japan have been making extensive efforts in order to survive by rationalizing the mining operations. Introduction of a new longwall mining system
Jan 1, 1995
-
An Area Calculation of the ARBS Support IntensityBy Ihsan B. Tulu, Keith A. Heasley, Aanand Nandula
"The objective of this paper is to present the development of a software tool that will assist in an area calculation of the Analysis of Roof Bolting Systems (ARBS) support intensity while incorporati
Jan 1, 2018
-
Highwall Stability Implications from Longwall Mining at Broadmeadow MineBy Bob Coutts, Matt Martin, Dan Lynch, Dan Payne
"The Broadmeadow punch longwall coal mine in Central Queensland Australia has experienced significant highwall movement associated with the effect of longwall subsidence when the longwalls approach th
Jan 1, 2018
-
Investigation Of Blast Damage And Underground StabilityBy S. Paul Singh
The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper
Jan 1, 1993
-
A Computer Simulation Of Breakage Of The Main Roof In Longwall MiningBy Deren Zhu
Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc
Jan 1, 1988
-
The Duncan Method of Partial Pillar Extraction at Tasman MineBy Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
Rockbolting For Highly Stressed RoadwaysBy Holger Witthaus
The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m
Jan 1, 2000
-
Design Considerations For Angle BoltersBy Charles D. Albright
FMC built its first angle bolter in 1969. This was a single mast unit which could drill holes for conventional bolts or angle holes for installing roof trusses. From this drill we learned very quickie
Jan 1, 1982
-
Estimating Rock Mechanics Parameters through Shear Wave Analysis with Well CadBy William R. Kohl, Craig B. Clemmens
"Since 2010, North Central Resources, Bridgeport, WV, has been using the sonic log to estimate the rockmechanics properties of the coal and adjacent strata in their exploration drilling program. In 68
Jan 1, 2015
-
Safety and Productivity Innovations in Mechanized BoltingBy Gregory Hinshaw
Underground mine bolting machines have evolved since inception in the 1940's due to the need for increased safety and productivity. However, major design innovations historically came from change
Jan 1, 1998