Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery

    By Ry Stone

    To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of

    Jan 1, 2012

  • SME-ICGCM
    The Next Generation of Cable Bolts for Improved Ground Support

    By Stephen C. Tadolini

    PC-Strand tendons, commonly referred to as cable bolts, have become a major rock reinforcement device for underground mining and civil applications. The most common configuration is a 1+6 strand, whic

    Jan 1, 2012

  • SME-ICGCM
    Ground Movements Associated With Pillar Extraction Coal Mining In Northern West Virginia (38f818ad-9d3b-4ecb-b624-667cef121309)

    By Robert W. Bruhn

    An investigation was male of ground response to pillar retreat mining in a 1.7 meter thick seam at 108 meter depth at a site in northern West Virginia. This paper describes mining-related stress chang

    Jan 1, 1984

  • SME-ICGCM
    Field Test Results On Dyna-Rok And Dyna-Rok Plus Anchors

    By James J. Scott

    Research and development has been carried out on the patented Dynamic Rock Anchor, tradenamed DYNA-ROK and DYNA-ROK PLUS Anchors, which are manufactured and marketed by Ingersoll-Rand Company. This pa

    Jan 1, 1990

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984

  • SME-ICGCM
    Requirements and Performance of Pumpable Cribs in Longwall Tailgate Entries and Bleeders

    By Peter Zhang

    Pumpable cribs are being increasingly used in longwall tailgate entries and bleeders for roof support under abutment pressure. Their high peak capacity and confinement-controlled yield characteristics

    Jan 1, 2012

  • SME-ICGCM
    Sub-Surface Ground Movements Associated With Longwall Mining

    By P. Gaskell

    The paper examines the development of rock movement between a longwall extraction horizon and the surface for a fully caved mining situation. Physical modelling has been used to examine the mechanics

    Jan 1, 1988

  • SME-ICGCM
    Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines

    By Ghassan Skybey

    Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages

    Jan 1, 1995

  • SME-ICGCM
    Proposed Criteria For Subsidence Damage To Buildings (d2ee0f1e-295b-4fb1-ab17-d19f1e17df4a)

    By Swapan Bhattacharya

    United States federal and state regulatory authorities require underground mine operators to adopt adequate measures to minimize material damage to the surface caused by nine subsidence. This paper pr

    Jan 1, 1984

  • SME-ICGCM
    Field Experience Of Measuring The Acoustic Energy From A Hammer Blow To Coal Mine Roof And Its Relationship To Roof Stability

    By Peter Altounyan

    The rate of decay of the energy from a hammer blow to a coal mine roof is related to the size and nature of the contacts between the rock being struck and its surroundings The use of this principle as

    Jan 1, 2000

  • SME-ICGCM
    Application Of Time Domain Reflectometry To Mining

    By Kevin M. Connor, Malcolm J. McPhersqn

    Examples are presented in which Time Domain Reflectometry (TDR) was employed to locate deformation of rock masses induced by mining. The first example involved motoring the propagation of overburden f

    Jan 1, 1984

  • SME-ICGCM
    Control Of Roadway Closure In Underground Coal Mines By Sidewall Weakening Technique

    One of the problems associated with the maintenance of roadways in underground coal mines is that of dealing with roadway closure. Sidewall weakening technique is based on the transference of the h

    Jan 1, 1990

  • SME-ICGCM
    Potential Of A Void Diffusion Model To Predict Longwall Subsidence In The Illinois Coal Basin

    In this paper, the authors attempt to apply a simplified non-homogeneous void diffusion model (NHVDM) to predict surface subsidence for longwall mining in Illinois. A generalized error function subsid

    Jan 1, 1990

  • SME-ICGCM
    Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction

    By Witold M. Pytel

    A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi

    Jan 1, 1992

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME-ICGCM
    Surface Fracture Development From Mine Subsidence In Eastern Kentucky

    By Clyde DeRossett

    Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co

    Jan 1, 1993

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • SME-ICGCM
    A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face

    By H. C. Li

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid

    Jan 1, 1992

  • SME-ICGCM
    Coal Pillar Life Prediction in the Vaal Basin, South Africa

    By J. Nielen van der Merwe

    This investigation was done to develop a method to predict the lie of coal pillars. It has long since been known that coal pillars deteriorate over time, but there was no method to quantify the deteri

    Jan 1, 1998

  • SME-ICGCM
    Comparative Studies In The Mechanics Of Grouted Roof Bolts

    By Stephen P. Signer

    To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure

    Jan 1, 1988