Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Site Specific Blasting Model For Mine-To-Mill Optimization

    By K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • SME
    Minerals Education Through The National Science Teachers Association Meetings: The Past And The Future

    By J. N. Murphy

    The use of the National Science Teachers Association (NSTA) regional meetings as a forum to educate teachers on the role of minerals in our society has been immeasurably successful. Each year, on ave

    Jan 1, 2001

  • SME
    How To Obtain Continuous Flotation Test Data With Drill Core Sample: A Mini Pilot Plant

    By V. L. Andrade, K. L. C. Goncalves, N. A. Santos

    This paper describes results obtained in a test program performed with new equipment, called Mini Pilot Plant, manufactured by Canadian Process Technologies. This equipment was acquired by CVRD aiming

    Jan 1, 2002

  • SME
    Modelling of Geomechanics and Geoecological State of Massif in Region of Large-Scale Mining Work with Using of Supercomputer Technology

    By O. Konovalov, M. Zhuravkov

    In report the results of performance of research works on building up of the connected geoecological and geomechanical monitoring system for modelling and study of a state of mining massif in a region

    Jan 1, 2005

  • SME
    Rehabilitation of the Cape Creek Highway Tunnel Under Traffic

    By Roberto J. Guardia, Tim Shell, Robert A. Robinson, Steve Rodolf

    Our aging infrastructure includes numerous tunnels that provide easy access through topographic and societal obstacles. These tunnels are renewable resources that require periodic maintenance and reha

    Jan 1, 2005

  • SME
    New Opportunities and Challenges in Surveying Underground Cavities Using Photogrammetric Methods

    The exploitation of the underground is currently undergoing a major transformation process. Besides mining, alternative ways of utilization are playing an increasingly important role. These alternativ

    Jan 7, 2020

  • SME
    Utilization Of Belt Air To Ventilate Working Sections In Underground Coal Mines

    By F. Calizaya

    This paper describes the basic requirements for the utilization of belt air to ventilate working sections at remote locations in relation to the main fans. It highlights the risks involved, potential

    Jan 1, 2008

  • SME
    Challenges In CFD Modeling Of Air Flow In Open-Pit Mines

    By K. V. Raj

    In the mining industry, computational fluid dynamics (CFD) modeling is used extensively to simulate air flow in underground mines. CFD modeling of pollutant transport in open-pit mines is relatively n

    Feb 27, 2013

  • SME
    A Subsidence Prediction Model for Longwall Mine Design

    By Vladimir Admek, Paul W. Jeran, Michael A. Trevits

    It has' been found that lithological conditions over the Pittsburgh Coal bed cause the subsidence coefficient to vary within the area of the subsidence trough. This precludes the use of European

    Jan 1, 1986

  • SME
    Availability Of Coal For Efficient, Low-Cost Underground Mining In Illinois – Preprint 97-162

    By C. Treworgy, C. Chenoworth

    Geologic and technical factors such as coal seam thickness, stripping ratios, roof conditions, partings, faults, and size and geometry of the reserve block greatly impact the availability of Illinois

    Feb 24, 1997

  • SME
    Measurements At A State Of The Art 2 X 5 Mw Dual Pinion Mill Drive

    By M. Rufli

    Until not so long ago most ring geared mills were operated with fix speed motors only. By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve t

    Jan 1, 2011

  • SME
    Impact Of Electronic Blasting Detonators On Downstream Operations Of A Quarry (22d10b2f-aefd-4aac-ad1c-1cb2ae95e088)

    In 2005, CANMET-MMSL used its pool of expertise in ground control, open pit and underground mine engineering, mineral processing, information technology and applied mineralogy to launch a mine-to-mill

    Jan 1, 2008

  • SME
    Separation Chemistry In The Refining Of An Off-Grade Molybdenite Concentrate By Leaching With An Acid Mix

    By P. M. Prasad

    Off-grade molybdenite concentrates, mainly derived from secondary sources as by-products of the processing of copper, uranium and tungsten ores, do not satisfy the purity requirements (percent MoS2) f

    Jan 1, 2007

  • SME
    Combining For Strength: An Integrated Approach To Water And Mine Waste

    By Nural Kuyucak

    Several thousand years ago, metallurgists discovered that by combining two relatively soft metals, copper and tin, they could make a new material, bronze, that was stronger than either metal separatel

    Jan 1, 2009

  • SME
    Evaluating Underground Mining Hazards By Fuzzy FMEA

    By S. K. Oraee

    Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he

    Jan 1, 2011

  • SME
    Measuring And Managing Dust And Nanoparticulates In Pyrometallurgical Processing (6689d80f-d5e8-491a-995c-6a41f35034df)

    By C. R. Copeland

    Combustion processes, comminution and materials handling can generate airborne particulates. Regulation of these particulates by the U.S. Environmental Protection Agency (U.S. EPA) is becoming progres

    Jan 1, 2008

  • SME
    Some MINExpo Exhibitors Previewed

    Bortech’s BoreClad corrosion protection system will be displayed at MINExpo. BoreClad is an innovative system for inside diameter cladding of nozzles, tubes and other circumferential devices. Pressu

    Jan 1, 2004

  • SME
    Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And Practice

    By Horst Pöchhacker

    The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin

    Jan 1, 1976

  • SME
    Design Based on Numerical Modelling a Requirement for an Economical Tunnel Construction

    By Gunter Swoboda, Harald Wagner

    Until a few years ago tunnel construction was based exclusively on experience. In recent years, however, numerical models have increasingly become an integrated part of tunnel design [2]. These models

    Jan 1, 1993

  • SME
    Flexible Change Of Support Model Suitable For A Wide Range Of Mineralization Styles

    By D. F. Machuca-Mory

    A change of support model consists of a procedure to change a stationary histogram at a small data scale to represent a larger scale; typically a distribution of sample drill-hole data is changed to r

    Jan 1, 2008