The Significance Of Interfacial Water Structure In The Dodecylamine Flotation Of Potassium Soluble Salt MineralsBy M. Hancer, J. D. Miller
The sign of the surface charge of selected potassium soluble salt minerals namely KClO4 , K2SO4 , KNO3, and KCl was determined from nonequilibrium electrophoresis measurements and found to be negative
Jan 1, 1999
-
Betze-Post Pit Slope Stability Monitoring At Barrick GoldstrikeBy R. Sharon
Barrick Goldstrike Mines, Inc. Betze-Post open pit operations, located in northeastern Nevada, have experienced slope instability attributed to the presence of generally weak rock mass conditions, loc
Jan 1, 2000
-
Bulk Handling Technology; Designing for the Future by Innovating the Present (8e766dcb-a812-4d92-a1a4-f27669d112e3)By R. Todd Swinderman
"Higher production demands across all bulk handling segments require increased efficiency at the lowest cost of operation, in the safest and most effective manner possible. As conveyor systems become
Jan 11, 2018
-
Industrial Minerals 2004 - AttapulgiteBy C. Stoneback
The attapulgite industry saw a year of solid growth after a weaker 2003. Demand was up between 5 percent and 6 percent driven by almost all of the key markets. Construction continued to show reco
Jan 1, 2005
-
A New Procedure For The Calculation Of An Open-Pit Operation's Capacity At The Carol Lake Operations Of The Iron Ore Company Of Canada - IntroductionBy Jorgen Elbrond
The capacity calculation of complex transportation systems involving variable activity times such as encountered in the mining industry are often worked out by means of simulation, which reconstructs
Jan 1, 1979
-
Hydrothermal Synthesis Of Aluminum Substituted Tobermorite From Perlite WastesBy I. Douni
The aim of this study is to synthesize hydrated compounds of calcium silicate (tobermorite) using as siliceous source perlite milling process wastes, containing more than 70% of SiO2. Calcium silicate
Jan 1, 2006
-
Mine LanpsMan’s search beneath the earth for minerals has always required light, and the devices used to provide illumination have been both innovative and unusual —from stone vessels holding fat and a wick of
Jan 7, 1980
-
Consequences Of The Forest Service Cercla Action At Mansfield CanyonBy R. M. Corn
The Non-Time Critical Forest service CERCLA Action at Mansfield Canyon, Santa Cruz County, Arizona designated previous locators of unpatented mining claims as owners/operators of the Hazardous Waste F
Jan 1, 2000
-
Steel Fiber Reinforced Tunnel LiningsBy Peter Shuttleworth, Chris Fesq, Eddie Woods
Precast concrete segmental linings for tunnels have traditionally been designed with conventional steel bar reinforcement. In many cases, this has been satisfactory in service, but in others, major pr
Jan 1, 2005
-
Andacollo Gold Production – Ahead of Schedule and Under BudgetBy G. Mike Bernard
The Andacollo gold mine is located near the town of Andacollo (population 14,000 people) in Chile’s region four. It is about 56km (35 miles) by paved road from the coastal city of La Serena. Santiag
Jan 1, 1996
-
Electrostatic Fogging Suppresses Respirable Rock Crucher DustElectrostatically charged water droplets efficiently suppress breathable dust produced during open air rock crushing operations, according to recently completed independent tests conducted for the Env
Jan 6, 1981
-
A Comparison Of Well-Accepted Tracer Gas Sampling Methods Utilized In Underground Mines With Solid-Phase Microextraction (SPME) Fibers Through Laboratory Testing Of Sulfur Hexafluoride ? IntroductionBy R. Patterson
Tracer gases have been utilized successfully in a variety of industries, each with specific releasing and sampling methods. The various attributes of tracer gases are dependent on the industry the tr
Jan 1, 2011
-
Reclaiming Aggregate Mining Sites In Minnesota Using Private/Public PartnershipsBy C. G. Buttleman, W. C. Brice
In Minnesota, reclamation of active aggregate mining sites is primarily regulated through local permits issued at the county, township, or municipality. However, for abandoned or depleted aggregate m
Jan 1, 2000
-
Treatment Of Refractory Gold-Antimony Concentrates With The Recovery Of SenarmontiteBy D. Royston
Gold ores containing antimony suffer from poor recoveries of gold in cyanidation due to the impact of antimony on the cyanidation process. Techniques such as lowering the pH for cyanidation can improv
Jan 1, 2007
-
Delay Timing And Vibration-Induced Damage To The Rock MassBy A. Karami
It is well established that an ordered sequencing of charge initiations in a blast pattern is an important design consideration that affects blasting performance. Delay times must be chosen such that
Jan 1, 2000
-
Impact Of MSHA’s Proposed Diesel Particulate Matter Regulations On Underground Mines - Panel DiscussionBy R. E. Ray
In an effort to reduce the risks to underground miners of health hazards associated with exposure to high concentrations of diesel particulate matter(dpm), the Mine Safety and Health Administration(MS
Jan 1, 2000
-
The Applicability Of Alternative Particle Size Analysis Methods In Laboratory TestingBy M. Deal
Particle size analysis is a fundamental measurement utilized in the mining industry, especially in comminution, hydrometallurgy, and mineral processing. While sieves and cyclosizers are the standard
Jan 1, 2011
-
Mine Managers For Underground Aggregate Operations: Problem Today-Crisis TomorrowBy S. Johnson
Introduction The mining of aggregates underground has grown steadily over the last 25 years. Growth has come in both production volume and in the importance this segment of the industry is playing i
Jan 1, 2006
-
Black Mountain – An Overview - The Resolution Of The Lands Unsuitable Petition From The Legal And Technical PerspectivesBy M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner
In 1998, Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903 +/- hectares (22,000 +/- acres) o
Jan 1, 2000
-
Technical Note - Sizing bulk handling equipment for maximum outputBy G. T. Lineberry, L. Adler
Due to safety-imposed constraints on clearances for mobile bulk handling equipment, it is necessary to optimally select a unit based on speed and size. The unit cannot be both large and fast. Since ou
Jan 10, 1985