Integrated Optimization Of Underground Mine Design And SchedulingBy J. Little
It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, comput
Oct 1, 2013
-
The Use Of Low-Toxic Heavy Suspensions In Mineral Sands Evaluation And Zircon FractionationBy Stafford McKnight, Larissa Koroznikova, Steve Hall, Cameron Klutke
This paper outlines a simple methodology for mineral characterisation, developed as part of the Australian Mineral Industry Research Association (AMIRA) managed research project P777 ?The Development
Jan 1, 2007
-
Enhancement of Profitability of Central African Copperbelt Operations using Direct Cobalt Electrowinning ProcessBy N. Mulaudzi, S. Archer
"Direct cobalt electrowinning was developed to produce unrefined cobalt metal as an alternative to producing a mixed hydroxide product (MHP), which is the common cobalt intermediate product in African
Jan 1, 2015
-
An algorithm for quantifying regionalized ore grades - SynopsisWe present a novel hybrid algorithm for quantifying the ore grade variability that has central importance in ore reserve estimation. The proposed algorithm has three stages: (1) fuzzy clustering, (2)
Jan 1, 2008
-
Semi-Controlled Seismogenic Experiments In South African Deep Gold MinesBy H. Ogasawara
To study the preparation process of an earthquake, we should get closer to the hypocentre. In co-operation with ISS International, we had an experimental field (~200 m x~200 m) without dykes and fault
Jan 1, 2002
-
Slope Management At Navachab Gold Mine, NamibiaBy Frik Badenhorst, René Roux, Peter Terbrugge
This paper presents a case study where economics dictated an aggressive slope angle and where an appropriate slope management programme allowed successful completion of mining to 190m below surface.
Jan 1, 2006
-
Slag Carry-Over and the Production of Clean Steel"For effective steel refining in the ladle (secondary steelmaking) the amount of steelmaking slag that is transferred from primary steelmaking must be limited, because the steelmaking slag contains ir
Jun 1, 2019
-
Simplification Of The Thabazimbi Dense Media Separation Plant Flow Line To Increase Capacity - BackgroundBy E de Villiers
Several methods exist by which the capacity of a dense media separation (DMS) plant can be improved: 1) Increase the feed rate in spite of efficiency 2) Replace with bigger equipment 3) Add wh
Jan 1, 2006
-
Guaigui Multipurpose Project Rock Slope StabilityBy Bjørn Nilsen, Werner Stefanussen
The construction of the Guaigui Multipurpose Project includes a 74 metre high concrete face rock fill dam, a 350 metre long diversion tunnel and a 350 metre long spillway tunnel. The topography in the
Jan 1, 2006
-
An Investigation Into Introducing A New Support Element At Khomanani 2: Resin Bolts Or 1.5 M In-Stope Roofbolts ? SynopsisBy T. J. Kolokoto
This paper is based on a project conducted at Khomanani 2 shaft, Anglo American Platinum Limited. The main objective was to find an alternative support element in stopes to address the falls of ground
Jan 1, 2013
-
Computational fluid dynamic modelling of a waste-heat boiler associated with flash smelting of base metal sulphides - SynopsisBy J. J. Bezuidenhout
The waste-heat boiler is used within the Sulphide flash smelting process as the main dust and energy recovery unit. The large volume of off-gas discharged from the flash smelter is at a very high temp
Jan 1, 2008
-
The Mechanism, Optimization And Effects Of PreconditioningBy A. Z. Toper
This is a sampling of the papers presented at the conference, the proceedings can be bought from the SAIMM An extensive research programme to address the issue of rockburst control has been underta
Jan 1, 2000
-
Petrological Characterization Of Coal: An Evolving ScienceBy J. M. Richards
For most of the 20th century optical petrography has been the primary petrological and mineralogical tool used to characterize coal. The development of quantitative SEM-based techniques, e.g. QEMSCAN®
Nov 1, 2013
-
Development And Implementation Of A Novel Pressure Leach Process For The Recovery Of Cobalt And Copper At Chambishi, ZambiaBy E. Munnik
The Chambishi Metals Cobalt Plant in Zambia has recently installed a novel oxidation/precipitation pressure leach process as part of the COSAC (CObalt from Slag And Copper as by-product) Project. Anir
Jan 1, 2003
-
Physico-chemical properties and transition metal complex formation in alkali pyrosulphate and hydrogen sulphate meltsBy H. Hamma, R. Fehrmann, M. Gaune-Escard, G. Hatem, S. B. Rasmussen, K. M. Eriksen
The molten salts M2S2O7and MHSO4, the binary molten salt systems M2S2O7-MHSO4and the molten salt-gas systems M2S2O7-V2O5and M2S2O7-M2SO4-V2O5(M = Na, K, Rb, Cs) in O2, SO2and Ar atmospheres have been
Jan 1, 2004
-
Loading And Transport System At SMC - OptimizationBy M. M. D. S. Vemba
Paper written on project work carried out in partial fulfilment of B.Sc. Eng (Mining Engineering) degree Engineering refers to the application of mathematics and other sciences to logically develop
Jan 1, 2004
-
Thermodynamic Modelling Of The Al2O3-CaO-CoO-CrO-Cr2O3-FeO-Fe2O3-MgO-MnO-NiO-SiO2-S System And Applications In Ferrous Process MetallurgyBy A. D. Pelton, Y. -B. Kang, S. A. Decterov
Computerized thermodynamic databases for solid and liquid metal, slag and solid oxide phases in the Al2O3-CaO-CoO-CrO-Cr2O3-FeO-Fe2O3-MgO-MnO-NiO-SiO2-S system have been developed by critical evaluati
Jan 1, 2004
-
Shear-flow coupling properties of a rock joint and its modelling by Geographic Information System (GIS)By Y. Mitani, F. Vallier, T. Esaki
Shear-flow coupling tests are conducted using an original apparatus, and a shear-flow coupling model using Geographic Information System (GIS) is developed in order to evaluate shear-flow coupling pro
Jan 1, 2003
-
Improved Technologies In Longhole Blast Hole Drilling, Applied To Drop Raising And Longhole Stoping As Well As The Application Of A Small Twin Boom Mechanized Drillrig?Longhole blast hole drilling? techniques are not new to the mining industry. Appropriate mechanization and improvement of the techniques and application has evolved from the industry requirements. T
Jan 1, 2003
-
The Transition From Open Pit To Underground Mining: An Unusual Slope Failure Mechanism At PalaboraBy Hao Li, Allan Moss, Richard K. Brummer
At the Palabora Mine, the transition to caving 400 m below the bottom of the 800 m deep pit resulted in a slope failure of the North wall that began in 2003, and is still mobile. This failure can be
Jan 1, 2006