Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Anatomy of a Blast Muckpile: Influence on Loading Machine PerformanceBy Yves Lizotte, Malcom Scoble, Sanu Hanspal
"This paper reviews the physical, chemical and mechanical components of what is considered to be the anatomy of a blast muckpile. These relate principally to geometry, floor, fragment size and shapedi
Jan 1, 1995
-
Improving Blast Fragmentation Prediction with New Technologies for Rock Mass CharacterizationBy John Kemeny
There are many methods used to predict blast fragmentation, including empirical and numerical models, field trials, and experience from ongoing blasting. All of these methods require an accurate measu
Jan 1, 2004
-
Non-Ideal Blasting for Ideal Grinding - Part TwoBy Jack Eloranta
Building on previous work, this paper expands the template for modeling the economic relationship between blasting and grinding. The actual efficacy of various blasting enhancements is not addressed,
Jan 1, 2014
-
Improved Fragmentation and Safety with Proper Borehole Loading TechniquesBy Lars Osen
Both fragmentation and safety can be improved by following proper procedures in loading boreholes. Proper loading procedures such as primer location, borehole sealing, decking, and stemming along with
Jan 1, 1985
-
Gas bubble sensitisation of a non-ideal explosive using different gases as hot spotsBy Italo Onederra, Miguel Araos
Most of the current explosives for mining blasting activities rely on voids to become sensitive to initiation, then detonating and finally, sustaining that detonation. The use of voids is known as hot
Jan 26, 2026
-
Pre-Bench Blasting Design Based on Risk Analysis on a QuarryBy Gungor Tuncer, Ali Kahriman, Umit Ozer, Abdul Karadogan, Mehmet Aksoy, Ertugrul Kaya, Deniz Adiguzel
This research was performed on the quarry that will be opened to produce aggregates and rock filling material at Catalagzi region at Zonguldak providence. Excavations will be done by drilling and blas
Jan 1, 2009
-
Evaluation of Schedule IV-Type ContainersBy D Wilson, E Nagy, R A. Augsten, R R. Vandebeek, R L. Guilbeault
The Canadian Explosives Research Laboratory (CERL), is evaluating the status of the Schedule IV explosives container as it presently pertains to the industry. The Schedule IV container serves the same
Jan 1, 1990
-
The Optimum DelayBy J Foklesi, G Bohus, D Benedek
The breakage process in blasting takes place in space and in time and the latter will determine the degree of fragmentation, shape of the muckpile and the extent of displacement. The shock wave travel
Jan 1, 1986
-
Open Pit Wall Control Analysis using PhotogrammetryBy Charles Zdazinsky
Back-break induced from blasting is a concern in open pit metal mining because it compromises the conditions of the pit’s final walls. Final walls that have excessive blast induced damage commonly req
Jan 1, 2014
-
Lessons Learned from Blasting in Highly Weathered SandstoneBy Tyler Rockley, Greg Bailey
This paper is an engineering case study of a blast performed on a highly weathered sandstone isthmus in an area sensitive to vibration and airblast, the challenges associated with such a blast, the me
-
Production Blasting and the Development of Open Pit Slopes (8e693b17-abb0-4b98-9d31-35dc00c5ce79)By John P. Ashby
Production blasting is a process of destruction of rock masses in order that ore may be extracted. Many open pit operations are faced with the apparently conflicting requirements of providing large qu
Jan 1, 1980
-
Considerations Affecting the Selection and Use of Modern Chemical ExplosivesBy Donald J. Westmaas, Fred C. Drury
The factors affecting the selection and use of exploisves have changed radically in the past three decades. The objective of this paper is to point out considerations which should now be employed by t
Jan 1, 1978
-
Daveytronic Digital Blasting SystemBy Advanced Initiation Systems Inc
10 years in R&D Last 5 years available commercially Worldwide Met strict approvals for manufacturing and use
Jan 1, 2004
-
Improving the Amount of Material Cast at Highvale Mine Using Electronic DetonatorsBy Robert Slivinski, Kyle Hobbs, Michael Stern, John Willox, Brad Jewson
Prairie Mines & Royalty Ltd. produces over 12 million tonnes annually of thermal coal for TransAlta’s Sundance and Keephills power stations from the Highvale Mine. This opencast mine is next to a lake
Jan 1, 2008
-
A Case Study Examination of Two Blast Rounds at a Nevada Gold MineBy Joel Warneke, Cristian Caceres, Ed Mchugh
NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i
Jan 1, 2008
-
Controlled Shaft Sinking Using Electronic Delay Detonators and Water BallastBy Greg Rappard, Francois Holowenczak, James Rickard
The King George V (KGV) Shaft forms part of MTR Corporation Limited (MTRCL) Works Contract 703 extension of the underground West Island Line on Hong Kong Island. The Shaft and the associated adit was
Jan 1, 2013
-
Building and Structural Blasting in HungaryBy Sandor Nagy
The Explosive and Blasting Department of the Hungarian Mining Research Institute is responsible for the research and development of industrial applications of explosives. Appropriate explosives techno
Jan 1, 1977
-
Autonomous Crack Displacement Monitoring of a Residence Near a QuarryBy David Kosnik
This paper describes the technology and methods deployed in the continuous autonomous remote monitoring of cracks in interior and exterior walls of a residence near a limestone quarry. The objective i
Jan 1, 2009
-
Seismic Study of the Dynamic Response of Rock to Cylindrical Charges Fired in a Half and a Quarter Space GeometryBy Sharon K. Reamer, Klaus G. Hinzen
A series of controlled seismic experiments was performed in a limestone quarry in southern Germany to study seismic effects of cylindrical charges fired in both a half space (HS) (burden 63 m) and qua
Jan 1, 1991
-
How to Control Blast Vibrations in an UrbanBy R E. Langston, S M. Gazioglu
A preconstruction inventory program was conducted to determine the existing conditions of residential, non-residential and all other structures within 2,000 feet of the blasting limits for a highway e
Jan 1, 1980