Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Inspector?s Guide To Augered Cast-In-Place Piles - Second Edition - Title ? Table Of Contents - 1.0 General

    This manual is limited to Augered Cast-in-Place (ACIP) piles constructed using a hollow stem continuous flight auger. 1.1SCOPE AND LIMITATIONS The intent of this manual is to provide guidelines

    Jan 1, 2010

  • DFI
    Inspector?s Guide to Augered Cast-in-Place Piles

    By Matthew E. Meyer

    The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex

    Jan 1, 2010

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble Deposits

    By Marco Fellin, Van E. Komurka

    Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.

    Jan 1, 2019

  • DFI
    Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, London

    By Shields H. Arup

    The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi

    May 1, 2022

  • DFI
    Analysis Of Driving Stress Measured In The RC Long Pile

    By Yu Zhenquan

    At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa

    Jan 1, 1991

  • DFI
    Author index

    Abouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber

    Jan 1, 1994

  • DFI
    International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997

    This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja

    Jan 1, 1997

  • DFI
    Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico

    By Justin Simmons, Michael Arnold, Bob Faulhaber

    "In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms

    Jan 1, 2017

  • DFI
    Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design Format

    By Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker

    There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo

    May 1, 2022

  • DFI
    Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay

    By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski

    "The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction

    Jan 1, 1900

  • DFI
    130 M Deep Bored Piles – A New Superlative

    By Vijay Kumar, Serhat Baycan, Karsten Beckhans

    For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep

    Nov 1, 2022

  • DFI
    “Special Application Of Micro-Piles” For The Construction Of A Bridge Well Foundation

    By Nagarajkumar BV

    Pavai-and TeampT JV started working on the project T49A, Sumbar J & K State as part of slope and earth stabilization for ongoing Banihal - Katra Railway Connection Project. This project has several tu

    Nov 1, 2022

  • DFI
    The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site Characterization

    By Anahita Modiriasari, Benjamin S. Rivers

    Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca

    Oct 1, 2022

  • DFI
    Design And Application Of Vertical Micropiles To Resist Large Lateral Loads

    By Helen D. Robinson

    Traditional practice to resist large lateral loads on foundations is the use of large diameter caissons, battered driven piles, or battered micropiles. Dense urban construction environments, however,

    Jan 1, 2010

  • DFI
    Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction Plant

    By Maurice Guillaud

    The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th

    Jan 1, 2002

  • DFI
    Applications of Nondestructive Testing Methods for Mass Foundation Blocks - Feasibility Study

    By Hamed Layssi, Farid Moradi, Thomas Tingson

    This paper describes the feasibility and pilot study of of using existing non-destructive testing solutions for evaluating structural integrity and mechanical performance of mass concrete foundations.

    Sep 8, 2021

  • DFI
    Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground Conditions

    By Emad Farouz

    This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan

  • DFI
    Case History: Innovative Load Test Program Optimizes Pile Capacity in Challenging Ground Conditions

    By Emad Farouz, Francis A. Abreu

    "This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Pla

    Jan 1, 2017

  • DFI
    Dynamic and Static Load Testing: A Cost Savings Approach

    By Thomas Hyatt, Brandon Phetteplace, Camilo Alvarez

    A test pile program was undertaken at a project site in Ain Sukhna, Egypt for an import/export oil jetty. Two 1219 mm diameter open ended steel pipe piles were evaluated at two separate test locations

    Jan 1, 2019