Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part OneBy Christian Divis
[ ]
Jan 1, 2002
-
Piles In Peat Under Artesian Pressure: A Case Study ? SynopsisBy K. Y. C. Chung
A case study on foundation engineering through organic soils is presented. Located along the west shore of the Hudson River, site soils consist of random brick fill over a thick layer of peat and orga
Jan 1, 2010
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a SeawallBy Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017
-
TPT Piling System - An Introduction To TPT PilesBy Stan Merjan
Composite piles with precast concrete tapered pile tips (TPT Composite Piles - U.S. and foreign patents) are a new and important addition to the piling types available to the construction industry. TP
Jan 1, 1987
-
A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? SynopsisBy M. Makarchian
Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num
Jan 1, 1996
-
Minipiles In Soft Marine Deposits Rescue Sinking WarehouseBy Bruno Gemmi
A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c
Jan 1, 2011
-
Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction ExamplesBy J. Nakayama
Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t
Jan 1, 1989
-
Seal Slab Prestressed Pile Interface Bond From Full-Scale TestingBy Gray Mullins
This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p
Jan 1, 2013
-
Limited Access Underpinning And Re-Leveling Of A Six-Story Office Building Using Jet Grouted MicropilesBy Tom Szynakiewicz
Micropiles are routinely used in the United States for foundation support and underpinning applications. The high capacities achievable with the use of micropiles, combined with specialty rigs for ea
Jan 1, 2008
-
Current State Of Practice Of Corrision Protective Systems For Tierods And Tiebacks Used In Marine Applications ? IntroductionBy Thomas A. Printz
The wide use of carbon steel in construction and engineering projects makes this engineering material accountable for approximately 85% of the total annual steel production worldwide. Despite the lac
Jan 1, 2013
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) WallBy Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
First Quality Tissue Plant, Lock Haven, Pennsylvania: A Case Study Of Drilled Displacement Dewaal Piles ? IntroductionBy Gordon King
The site of the First Quality Tissue plant is located on a previous paper production facility in Lock Haven, Pennsylvania. The new development, which included the construction of a tissue machine buil
Jan 1, 2004
-
Threading Piles Past Underground Assets In Central LondonBy Alexander Nikolic
The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra
Jan 1, 2011
-
Design, Construction and Monitoring of a Secant Pile Compression RingBy Jason Weck, Alper Turan, Ali Chehadeh
"Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro
Jan 1, 2014
-
Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette ConstructionBy Thoedtida Thipparat
The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord
Jan 1, 2006
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case StudyBy James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Deep Foundations On Deer IslandBy Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994
-
Special Foundation Systems - IntroductionBy D. A. Greenwood
Dr David Greenwood opened the first technical session of the conference by highlighting the diverse nature of the papers in this session but drawing attention to the common theme that each solved a pa
Jan 1, 1991
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994