Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
High Capacity Minicaissons In NYCBy Lawrence F. Johnsen
Six case histories are presented in which tall, slender high rises are supported on high capacity minicaissons. The recent development of a high strength rebar cage has resulted in compressive loads o
Jan 1, 2007
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont TowerBy Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Innovative Alternate Underpinning Solution for Historic Structure in Boston SuburbBy Eric P. Bregman, Justin Zarrella, Ryan M. Coulson, Connor Johnson
Within a prominent Boston, MA suburb are a pair of historic stone and mortar structures built in the late 1800’s. Both the Main House and Carriage House have been maintained and occupied throughout th
Sep 8, 2021
-
Excavation Risks Adjacent to Existing Structures in Illinois and Urban Environments - Identifying and Managing Technical and Legal IssuesBy James P. Chivilo, Gregory R. Meeder, Scott J. DiFiore, Matthew H. Johnson
New construction in metropolitan areas has direct impacts on immediate neighbors and abutters. While noise and dust are generally nuisance concerns, demolition, vibrations, excavation, and dewatering
Jan 1, 2019
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
Deep Mixing Column Group Reinforcement by a Shallow Mixing Layer bBeneath an EmbankmentBy Tomohide Takeyama, Binh T. T. Nguyen, Masaki Kitazume
"Deep mixing columns are widely used to support embankments constructed on soft ground area. Researches on the stability of deep mixing columns were done by some authors when the columns do not simult
Jan 1, 2015
-
Recent Advantages of CDM-LODIC Method (Low Displacement and Control Method)By Yuji Yamashita, Kazuyoshi Kamimura, Tsuyoshi Takahashi, Naoya Matayoshi
"The CDM-LODIC method (cement deep mixing - low displacement and control) method enables ground displacement to be reduced by removing an amount of soil equivalent to that of injected cement slurry an
Jan 1, 2015
-
Practice to Reduce Ground Displacement in Deep Mixing WorkBy Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) technique is widely known as soil mitigation technique with small ground displacement during installation comparing with other techniques. Some projects involving sensitive struc
Jan 1, 2015
-
Numerical Analysis Of Mono And Group Suction Piles Under Lateral Loadings In Layered DepositsBy Juhyung Lee
Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silty
-
Construction Of A Spillwall In The Columbia RiverBy Francis B. Gularte
The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw
Jan 1, 2010
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole InspectionBy Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
Long-Term Performance of a Deep Mixed Column-Wall at Arabianranta Area (Helsinki, Finland)By Leena Korkiala-Tanttu, Ilkka Vähäaho, Juha Forsman, Paavo Lahdenperä, Kalle Rantala, Osmo Korhonen
"District of Arabianranta (Helsinki, Finland) has been founded on an old seabed, which was filled with miscellaneous soil materials. The subsoil consists of very low shear strength clays and organic c
Jan 1, 2015
-
Utilizing Drones to Improve Project WorkflowsBy Barritt Lovelace
Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site
Jan 1, 2019
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
TECHNICAL NOTE: Direct Solution of the Brinch-Hansen 90% Pile Ultimate Failure LoadBy Don W. Dotson
In 1962, Kondner prepared several papers dealing with hyperbolic stress-strain response of cohesive soils. The following year, Brinch Hansen proposed 80% and 90% failure criteria for stress-strain be
Aug 1, 2013
-
Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2008
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling MethodBy Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Applications of Diaphragm Wall Technology for Deep Foundations and Permanent Underground Structures for the Transbay Transit Center and the Transbay DevelopmentsBy Mikael Calando, Thomas Joussellin
"San Francisco's rapid growth has caused the city to plan for the Transbay Transit Center Project, a visionary transportation and housing project, that will transform downtown San Francisco and the Sa
Jan 1, 2016