Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Assessment of Material Diggability for Shovel Excavation in Oil SandsBy Sibabrata Patnayak
A major problem during shovel excavation in oil sand mining is the variability of material diggability resulting in varying mechanical energy input, cycle time, energy consumption, wear, and stress lo
Apr 1, 2005
-
Implementation of Stage Grinding at the Brunswick Mine ConcentratorBy J. Andrew Cornier, Mike Cooper
"Upon successful completion of the AG/SAG Mill project (Cooper et al., 2001) the Brunswick Mine concentrator was configured with single line processing through the AG/SAG mill, followed by two paralle
Jan 1, 2002
-
Evaluation and control of self-heating in sulphide concentratesBy J. Nesset, F. Rosenblum, P. Spira
Sulphide concentrates may exhibit self-heating to various degrees during storage or shipping, the worst cases presenting a serious hazard from fire and SO2 emission. Based on measurements of heating r
Jan 1, 2001
-
Recovery of Uranium and the Lanthanides from Phosphate RockBy Fathi Habashi
"A process is proposed for the treatment of phosphate rock for the recovery of uranium and the lanthanides. The process assures the production of phosphatic fertilizers without polluting the environme
Jan 1, 1997
-
Operational Data and Maintenance ReliabilityBy Justin S. Johnsen
As OEM sensors and interfaces have grown in number, the available data from equipment in the mining environment has continued to multiply. This equates to an increased visibility of operating performa
Nov 1, 2011
-
Grindability Assessment Using Particle Size or Particle Surface AreaBy Baoquan An
The energy required to fragment a rock is proportional to the increase in the fracture surface area and hence is proportional to the rock?s surface area. In comminution, the slope of the linear relati
May 1, 2004
-
Metallurgical Testwork on Harmony Project OreBy K. Gie Tan, Frank Wright
"Misty Mountain Gold Limited (MGL - TSE VSE, MGLCF - NASDAQ) of Vancouver, owns the Harmony Gold Project located in the Queen Charlotte Islands of British Columbia. The deposit contains a mineable res
Jan 1, 2000
-
Ore Thawer at Pine PointBy R. J. Johnston
"INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division
Jan 1, 1972
-
Column Flotation Experience at the Sarcheshmeh Copper MineBy S. Banisi, M Nesari, J. A. Finch, N. Nobari, H. Javani
"The flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. Mechanical flotation cells are used in all sta
Jan 1, 2000
-
Challenges in moving from Ad-Hoc to Planned Mine Technology InnovationWhy Innovate in Mining? ?Obvious, right? ?Increase productivity and profitability ?Improve safety and ergonomics ?Improve our environmental record and eliminate liabilities ?Implement process c
May 1, 2006
-
Intégration De La Désulfuration Dans La Restauration Des Sites Miniers Générateurs De DMABy Bruno Bussière
Le drainage minier acide (DMA) provenant de la circulation des eaux à travers les rejets miniers sulfureux est sans doute le principal problème environnemental auquel est confrontée l?industrie minièr
Nov 1, 2002
-
Underground Wireless LAN Deployment at Agrium IncorporatedBy Adrian Rosen
When one thinks of innovation and leadership in wireless communications, one would rarely consider a potash mine to be leading the way. Agrium Incorporated has proven that they are leaders and innovat
May 1, 2006
-
Rock fall in surface miningBy C. O. Brawner, J. Kalejta II
"The classical approach to control rock fall and ravel in open pit mining has been to use catch benches. The width and volume of benches is most dependent on the bench height, size of loading equipmen
Jan 1, 2002
-
The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac TerraneBy T. A. Grammatikopoulos, B. Vasily, A. H. Clark
"The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian
Jan 1, 2003
-
Approximating diamond drill rod wearBy R. Laplante, P. Radziszewski, P. De Ciccio
"Predicting the effect of wear can lead to improved control strategies that can possibly minimize the risk of catastrophic failure due to wear while maximizing useable life. In the field of geological
Jan 1, 2002
-
The Effect of Fine Grinding on Copper and Zinc Metallurgical Performance at Sherritt Gordon Mines Limited Ruttan Mine, Leaf Rapids, ManitobaBy C. B. Webber, W. A. Grell
"Sherritt Gordon's Ruttan Mine is a copper-zinc operation located approximately 600 miles north-west of Winnipeg. Open pit mining began in 1973 at 10,000 Tpd., with a change over to underground mining
Jan 1, 1982
-
Optimising Stope Sequences for Long Term Mine PlanningBy André van Wageningen
Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos
May 1, 2004
-
Concepts for Co-Mixing Waste Rock and TailingsConventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.
Nov 1, 2002
-
Adapting to Ore Characteristics at Lac des Iles MineBy Erin N. Legault-Seguin
The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000
May 1, 2009
-
Mines Business Planning at the Vale Inco Ontario OperationsBy Richard Jundis
At the Vale Inco Ontario Operations, the working environment is rapidly evolving with organizational changes, new business systems and software tools. These changes are required in order to meet today
May 1, 2009