Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development of Emiprical and Numerical Design Techniques in Burst Prone Ground at Goldcorp Inc.?s Red Lake Mine

    By Pravin Kumar

    Goldcorp Inc.?s Red Lake Mine (RLM) is situated in the Red Lake Mining District, a history rich North Western Ontario mining community. Red Lake Mine formerly known as the Dickenson Mine has experienc

    May 1, 2002

  • CIM
    Research and Development for an Ultra-Low Profile LHD

    By Patrick F. R. Murphy

    An ultra-low profile LHD has been developed by EJC Mining Equipment of Burlington, Ontario for narrow-reef mining applications. This paper discusses the challenges encountered during the evolution of

    May 1, 2004

  • CIM
    Mine Site Hydrogen Storage and Delivery Model

    By M. C. Bétournay

    Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A

    May 1, 2007

  • CIM
    Mill Speed Control for More Efficient Grinding

    By V. K. Gupta

    "Effect of mill speed on grinding kinetics has been investigated with a view to using mill speed as a manipulated variable for control and optimization of the grinding circuit performance under variab

    Jan 1, 1985

  • CIM
    Accounting for Dilution in Ore Resource Estimation

    By Mario E. Rossi

    The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization

    May 1, 2009

  • CIM
    Collaborative/Syndicated Research in Mineral Processing

    By Terry Braden

    "Meeting probable world mineral demand in the years ahead will almost certainly require an ability to economically treat lower grade and more complex ores. Achieving this will require extensive resear

    Jan 1, 2009

  • CIM
    A Two-Phase Backfill Approach to Dilution Control at the Doyon Mine

    By Emilie S. Williams

    The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping

    Oct 1, 2004

  • CIM
    Forage ITH à Haute Pression à la Mine Goldex

    By Patrick Frenette

    Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s

    Feb 1, 2008

  • CIM
    Prevention of Losses in Rail Shipment of Concentrate at Mattagami Lake Mines

    By K. V. Konigsmann

    "Mattagami Lake Mines Ltd operate a zinc-copper mine with an annual output of about 200,000 tons of zinc and 30,000 tons of copper concentrates. Zinc concentrates arc shipped to a company owned smelte

    Jan 1, 1975

  • CIM
    Determine Machinery Condition by Vibration and Noise Analysis

    By James G. Lyons

    All machines vibrate and make noise. An increase signals impending trouble. Vibration and noise analysis allows the condition of the machine to be determined without costly interruption in service for

    Jan 1, 1977

  • CIM
    Molybdenite Flotation by Controlling Pulp Potential

    By M. Kolahdoozan, H. Noori

    "Molybdenite flotation at the Sarcheshmeh Copper Complex has been studied as a function of pulp potential controlled using two types of sodium sulfide (mineral and chemical origin). Air and either pla

    Jan 1, 2006

  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • CIM
    Development of Small Scale Flotation Cells and its Application in Milling Operations

    By R. Rosenblum, J. Y. Kim, D. Shink, K. G. Stowe

    "A small scale continuous flotation cell was designed and constructed at the Noranda Technology Centre to develop a mobile testing flotation circuit located next to the production circuit. This mobile

    Jan 1, 1992

  • CIM
    Status of Repairs on Two Grinding Mills At Holt-McDermott

    By Pierre Beaudoin

    "This paper deals with the repairs made on two damaged mills. It investigates briefly the causes of the damage, explain its nature and the design of the repair. It explains the detrimental effect on o

    Jan 1, 2001

  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    Continuous SAG Volumetric Charge Measurement

    By Andre Vien, Jean-François Dupont

    "Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This p

    Jan 1, 2001

  • CIM
    Deep shaft hoisting at LaRonde —The Penna shaft hoisting plant

    By B. McLaughlin

    Agnico-Eagle started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240 m deep shaft. Exploration success led to the installation of a hoisting plant capabl

    Jan 1, 2004

  • CIM
    The Enviro-Clear Thickener, a New Concept in Clarification

    By P. D. R. Maltby

    "1. INTRODUCTIONMy talk today will discuss a new development in the thickening of slurries and clarification of waste water - the Enviro-Clear thickener. Several industrial installations of the thicke

    Jan 1, 1976

  • CIM
    Algorithm to Help Additional Drilling Location

    By Vanessa C. Koppe

    During ore body modeling normally additional samples are required to improve resources evaluation and mining planning. At this stage one rises the question about where additional samples should be loc

    Oct 1, 2009

  • CIM
    The Role for Uranium and Nuclear Power in Combating Global Climate Change

    By Chuck Edwards

    Whatever your opinion of the validity of the scientific case for global warming, or of the wisdom of the Kyoto Protocol, it would seem judicious to err on the side of caution and try to sensibly minim

    Jan 1, 2004