    A study on the optimum arrangement of buoyancy module for stability of marine flexible riser using genetic algorithm & multi-body dynamic simulation

    By Tae-kyeong Yeu, Cheon-Hong Min, Hyung-woo Kim, Sup Hong, Minuk Lee, Chang-Ho Lee

    This paper concerns the optimum arrangement of the buoyancy module, which is used for stable dynamic motion and structure stability of the marine flexible riser. The main method of this study is simul

    Sep 1, 2014

  • AUSIMM
    Improvements in Stoping Practice at the Great Boulder Proprietary Gold Mines Limited

    By Holly J

    The period following World War II has seen many changes in stoping techniques at The Great Boulder Gold Mine. The new methods resulted in improved unit production figures, and have given some relief f

    Jan 1, 1956

  • AUSIMM
    Cost Model of the Leigh Creek Coalfield

    The Leigh Creek Coalfield is owned and operated by the Electricity Trust of South Australia to supply fuel to the Northern Power Station. To supply electricity at lowest cost, a costing and decision

    Jan 1, 1990

  • AIME
    New York Paper - Some Factors Affecting the Elimination of Sulfur in the Basic Open-hearth Process (with Discussion)

    By C. C. Miller, A. R. Belyea, C. H. Herty, E. B. Burkart

    The removal of sulfur from steel has been studied by many investigators, but the quantitative relationships between the factors involved have not been determined. This is undoubtedly due to the number

    Jan 1, 1925

  • AUSIMM
    Uranium Mineralization at Anomaly 2J, South Alligator Valley, Northern Territory, and Its Significance Concerning Regional Structure and Stratigraphy

    By Miezitis Y

    A weak airborne radiometric anomaly was examined in the field and the presence of uranium confirmed. Rotary-percussion drilling showed the presence of uranium but a subsequent programme of diamond and

    Jan 1, 1977

  • CIM
    Statistical Multi-Scale Method of Mechanics Parameter Prediction for Rock Mass

    By J. Z. Cui

    In this paper a statistical multi-scale method for the mechanics parameter prediction of the rock mass with random distribution of multi-scale cracks/joints is presented. First the micro-structure of

    May 1, 2009

  • SME
    Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)

    By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan

    A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove

  • AUSIMM
    Background Geochemistry Downstream from Mines: USA Case Studies and NZ Significance

    Background geochemistry of streams in mineralised terranes is affected by (a) natural sulphide oxidation and associated metallic discharges; and (b) previous mining history and associated discharges.

    Jan 1, 1999

  • ISEE
    Controlling high risk blasting in an urban environment The Airport Link Story

    By Rob Domotor

    This paper tells the story of using controlled surface and underground blasting methods to excavate hard rock in three areas on Australia’s largest road infrastructure project; the Airportlink Project

    Jan 1, 2012

  • SME
    Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)

    By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland

    Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo

    Jan 1, 2001

  • SAIMM
    Gliding cylinder method for the viscosity measurement of molten salts, slags and glasses

    By Y. Shiraishi, Y. Sakurai

    A new method, the gliding cylinder method, was proposed as a wide range viscometer for the measurements of molten salts, slags, and glasses. The method consists of two coaxial cylinders, cylindrical b

    Jan 1, 2004

  • NIOSH
    Numerical Modeling Procedures For Practical Coal Mine Design (237d1a0f-d46f-4124-9918-9eab02bc2008)

    By R. K. Zipf

    A method is presented for creating realistic numerical models for practical coal mine ground control. The method includes procedures to collect the necessary mechanical input parameters from a geolog

  • ABM
    Estudo Da Influência Da Temperatura Do Eletrodo Na Qualidade Da Solda Para A União De Chapas No Processo De Soldagem Por Resistência Elétrica (Rsw)

    By Gabriel Mendes de Almeida Carvalho

    O processo de soldagem de pontos por resistência elétrica é uma técnica econômica e adequada para a união de chapas, pela alta velocidade e adaptabilidade, torna-se um método amplamente difundido para

    Aug 17, 2017

  • AUSIMM
    Molybdenum Flotation Circuit and Flotation Cells

    By D Jensen, L Riffo, S Yu, F Traczyk, D Meadows

    With the steady increase of molybdenum demand worldwide and the favorable molybdenum market, many technological innovations on both process and equipment have been developed and applied in many modern

    Jul 15, 2013

  • AUSIMM
    Presidential Address, 1968: The Standards We Inherit

    At last year's. annual meeting of The Institute, Sir George Fisher, as President, compared it somewhat nostalgically with a meeting of its kind in the 1920s when comment was expressed on the decl

    Jan 1, 1968

  • ISEE
    Alternative Velocity Loading Techniques and Detonations in a Production Environment

    A simple and cost effective technique to increase fragmentation and burden velocities without making major modification to the overall blast design is with ALTERNATE VELOCITY LOADING OR BOOSTERING OF

    Jan 1, 1989

  • AUSIMM
    Progressing Cave Performance into the Later Stages of the Deep Ore Zone Mine

    By A M. Purba and A Sjadat, A D. Wilson

    Ongoing mining of the East Ertsberg Skarn System orebody below the Gunung Bijih Timur and Intermediate Ore Zone caves has been relatively successful and a ramp up to 80 000 t/d was achieved in the Dee

    May 9, 2016

  • SME
    Subsidence Potential In The Eastern Kentucky Coal Field

    By C. A. Johnson, K. F. Unrug

    The identification of the major subsidence areas in the Eastern Kentucky Coal Field has been made to distinguish the subsidence phenomena on the basis of geographical location. Further, this identific

    Jan 1, 1986

  • SME
    L-73 Tunnel, Woodbury, Minnesota

    By Michael B. Gilbert

    The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o

    Jan 1, 2008

  • AUSIMM
    Metallurgical Practice in the Beach Sands Industry

    The history of the industry which recovers rutile and zircon from the heavy mineral beach sand deposits of Eastern Australia began with the initial discovery of zircon in 1895. Whereas a large number

    Jan 1, 1963