Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Effect of mine water on the stability of underground coal mine roadwaysBy H. Takamoto, M. Ichinose
"The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many roa
Jan 1, 2011
-
The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply SystemBy Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole
Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands
Jan 1, 2007
-
Investigation Of Exposures To Commercial Asbestos In Northeastern Minnesota Iron Miners Who Developed MesotheliomaBy Wendy M. Brunner
A 70% excess of mesothelioma, an asbestos-related cancer, has been reported among men in northeastern Minnesota, where iron mining has been the major industry. The Minnesota Department of Health has
Jan 1, 2007
-
Regulatory Toxicology And Pharmacology - Session VI: Risk Assessment Of Asbestos And Other Fibrous Mineral Particulates: Rapporteur?s Report1. Paper1?Identification and enumeration of asbestos fibers in the mining environment: mission and modification to the federal asbestos standard Arthur M. Langer Asbestos-related disease is increa
Jan 1, 2008
-
Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, ORBy Niels Kofoed
Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM
Jan 1, 2011
-
Mixed Potential Oscillations In The Dissolution Of Galena In Ferric Sulfate SolutionBy Li Zhou
The kinetics of the dissolution of galena was studied by monitoring the mixed potential of a galena electrode in ferric sulfate solutions. The results show that the mixed potential of the galena elect
Jan 1, 2008
-
Assessment of Settlement Due to EPBM Tunnelling in London, UK, on CTRL Contract 240By Keith Jones, Michael Francis
Contract 240 of the Channel Tunnel Rail Link comprises construction of twin4.7 km long running tunnels through a densely populated area of East London. The tunnels were constructed by EPBM in Sands an
Jan 1, 2005
-
Assessment Of The Pathogenic Potential Of Asbestiform Vs. Nonasbestiform Particulates (Cleavage Fragments) In In Vitro (Cell Or Organ Culture) Models And BioassaysBy Brooke T. Mossman
Asbestos fibers are highly fibrous silicate fibers that are distinguished by having a large aspect (length to diameter) ratio and are crystallized in an asbestiform habit that causes them to separate
Jan 1, 2007
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Impacts Of Ground Convergence On TBM Performance In Ghomroud TunnelBy Ebrahim Farrokh
Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided
-
MINExpo INTERNATIONAL 2000 Largest Ever HeldBy Tim O’Neil
The search for precious metals opened up the American West. And Nevada was right in the heart of this development. In the mid-19th century, prospectors seeking gold roamed the hills of Nevada and di
Jan 1, 2000
-
Grunerite (Amosite) Asbestos And Tremolite?Ferroactinolite Asbestos: Risk Of Environmental Mesothelioma: Rapporteur?s ReportBy John F. Gamble
Paper 1?South African experience with asbestos-related environmental mesothelioma: Is fiber type important? Neil White, Gill Nelson, Jill Murray The purpose of this review was to illustrate the im
Jan 1, 2007
-
Boart Longyear Coring Bits Pass Field TestsUsing mines in Canada, Boart Longyear, a leading provider of drilling services and products, has put its Stage 3 Coring Bit to the test and each time the bit has passed the test with great success. A
Jan 1, 2009
-
Origin Of The Problem: Rapporteur?s Report ? IntroductionBy Malcolm Ross
The Reserve Mining Co., in the processing of taconite iron ore quarried from the Peter Mitchell Pit, deposited the finely crushed waste rock into Lake Superior near Silver Bay Minnesota. In the early
Jan 1, 2007
-
Automatic Landslide Monitoring Using Terrestrial-Based Static LidarBy M. Leslar
Slope monitoring has been an important issue in static terrestrial lidar for some time. Several solutions for monitoring the progress of a slide have been devised over the years. All of these solution
Feb 27, 2013
-
Regulatory Toxicology And Pharmacology - Rapporteur?s Report - Session II: Characterization Of Fibrous MineralsThe central question concerning the health risks associated with mining and processing of taconite ores in the Eastern Mesabi Range is ??does asbestos, of any variety, occur within the gangue mineral
Jan 1, 2008
-
Steel Linings In Vertical OpeningsBy James W. Harrower, Gerald S. Ball
This paper discusses the installation of steel linings in vertical, raisebored openings. Design criteria used to evaluate the applicability of liner type and design are presented as well as a brief de
Jan 1, 1985
-
Tunneling And Trenchless Technology Key To Charleston?s InfrastructureBy Larry F. Drolet
Charleston, SC is anything but boring. The city was founded in 1670 and has played a significant role throughout the history of the United States. Located along the coast of the Atlantic Ocean in the
Jan 1, 2013
-
Notes On The Efficacy Of Wet Versus Dry Screening Of Fly AshBy B. Valentim
The methodology used to obtain fly ash subsamples of different sizes is generally based on wet or dry sieving methods. However, the worth of such methods is not certain if the methodology applied is n
Jan 1, 2008
-
San Francisco?s Central Subway, Extending the Third Street Light Rail to ChinatownBy Matthew E. Fowler
The Central Subway will extend the recently completed 8.2-km long Third Street Light Rail line another 2.7 km north through the Union Square shopping district to Chinatown with a concourse-to-concours
Jan 1, 2008