Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Understanding the Hazard Potentials of Toxic Fumes
By Michael S. Wieland
Toxic fumes cause fatal and nonfatal incidents in underground mining, where the working environment tends to trap the fumes, hindering the restoration of nonharmful conditions. Workers can underestima
Jan 1, 1998
-
Precision Presplitting Optimization
By Anthony J. Konya, Calvin J. Konya
Mine sites and construction projects have faced problems with blasting a smooth back wall. This lead to safety concerns with slope stability and rock falls from the walls. Decades ago Dr. Calvin Konya
Jan 1, 2016
-
Blasting Mitigation Measures Used to Control a Highwall Failure Risk
By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon
Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The
-
World-Wide Survey of Distress Blasting Practice in Deep Hard Rock Mines
By Marwan M. Mohammed, Hani S. Mitri, Wilfrid Comeaul, Baoyao Tang
In many parts of the world, rockbursts have become a major problem of mining at depth. As orebodies are being mined deeper, rockburst phenomena have become familiar to deep hard rock mines. Rockbursts
Jan 1, 1999
-
Economics of Blasting around Steep Dipping Coal Seams at the Mt. Owen Mine
By Trevor Howie, Mal Edwards
"Thiess Contractors Pty Ltd. designed and operate the Mt Owen Mine in the Hunter Valley of NewSouth Wales, Australia on behalf of the owners of the mine, BHP Coal Pty Ltd. The mine is a multiseam open
Jan 1, 1997
-
Effects of Accurate MS Delays on Productivity, Energy Consumption at the Primary Crusher, Oversize, and Ground Vibrations and Airblast
By James W. Reil, Douglas A. Anderson, Steven L. Burchell
A total of 26 full-scale production blasts at three sites were extensively monitored with sophisticated instrumentation systems to determine the benefits of "ore. accurate detonators. The new and "ore
Jan 1, 1989
-
I-40 Rockslide Causes Mountains of Problems
By Corry Goumans, Dwayne Wallace
"On July 1, 1997, a rockslide occurred on the I-40 in Hayward County, North Carolina that completelyblocked all lanes and disrupted traffic flow in the region. Remedial measures were undertakenimmedia
Jan 1, 1999
-
Concrete Bridge Pier Removal in an Environmentally Sensitive River
By Paul Kunze
When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.
Jan 1, 2014
-
Blast Design and Diagnostics Using, Portable Solid State, High-Speed Videography Systems
By Laura Bustemante, Bruce Vandenberg, Fred Huettig
Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 8 seconds of data can
Jan 1, 1998
-
Metafex®: Safe, Energetic Explosive Replacements
By David Davison
Metafex®* is an inert material that is more energetic than explosives when activated. Because Metafex is inert until activated (a moment before use), it can profoundly change the logistics of systems
Jan 1, 2006
-
Borehole Inspection with the HRS-1 Video System
By Tom Palangio, Ralph M. Olmstead
Video inspection of boreholes with cameras developed specifically for the mining industry is now possible. These designs are reliable, cost effective, and have the flexibility to be used in other appl
Jan 1, 1998
-
Evaluating Delay Effects on Ground Vibrations with Simulated Vibration Waveforms
By Randall M. Wheeler
It is important to be able to quantify the effects of blast delay designs on vibration characteristics. White was the first company to develop commercially available software, called Alpha-Blast, for
Jan 1, 1994
-
Back to Basics in Drilling Safety
By John Brown
Let’s talk about things that you, the driIl boss, the pit boss and the driller can do to eliminate the trend in drilling related accidents that have come to plague our industry in recent years. My pap
Jan 1, 2000
-
Blast Assessment and Optimization with Respect to the Control of Environmental Effects
By Frank Sames
The control of the environmental effects, especially blast vibration and airblast, has become a dominating planning criterion for most surface blasting operations. Compliance with existing regulations
Jan 1, 1997
-
Florida Mining Blast Vibration Study Part 4: Conclusions and Recommendations
By Tristan Worsey, Nathan Rouse
Florida legislature allocated funding for the Florida State Fire Marshal to review the applicability of the United States Bureau of Mines (USBM) Report of Investigations (RI) 8507 blast vibration limi
Jan 1, 2019
-
Impact-Induced Fragmentation of Rock and Size Distribution Analysis
By Bibhu Mohanty, Sheng Huang
Accurate measure of fragment size distribution is a key objective in all blasting and crushing operations. Several generic distribution functions have been devised to describe the degree of fragmentat
Jan 1, 2016
-
2004G Volume 2 - Hotshot Auto-Programmable Electronic Detonator System
By Detnet Solutions
1. “Daisy-Chain” concept The term “daisy-chain” stems from the fact that when the HotShot? detonators are connected there is a chain or electrical path for electrical current to flow from detonator A
Jan 1, 2004
-
Florida Mining Blast Vibration Study Part 1: Do RI8507 Vibration Limits Apply in Florida?
By Tristan Worsey, Nathan Rouse
Florida is one of the major limestone producing states in the United States. The state has unique regional geology and groundwater characteristics that require equally unique mining methods to extract
Jan 1, 2019
-
Applied to a High Risk Case History
By C Agreda
The Cushion Blasting Technique applied to solve the high risk case history represented by a 10,704 TM rock locate at 120 M from the hydroelectrical plants of 350 KV each, is described, analyzed and di
Jan 1, 2005
-
Running a Drill Program that Supports the Mission of Blasting
By William D. Hissem
While much technology has been developed and brought to bear in the area of blasting applications, the foundation work required for success in the muck pile begins with the drilling program.
Jan 1, 1997