Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina
Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
2017 OPA WINNER - Tri-Pod Suction Buckets for Offshore Wind Turbine FoundationBy Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu
"Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).
Jan 1, 2017
-
Tri-Pod Suction Buckets for Offshore Wind Turbine FoundationBy Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu
"Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).
Jan 1, 2017
-
San Francisco-Oakland Bay Bridge: OPA WinnerBy Gerry Houlahan
"The 2015 Outstanding Project Award (OPA), which recognizes the superior work of DFI members, was awarded for the San Francisco- Oakland Bay Bridge New East Span. The award was presented to representa
Jan 1, 2015
-
Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT ProjectBy Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa
"In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati
Jan 1, 2015