Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Application of a rock buttress to design of slopes at Cassiar Mine

    By Tim J. Carew, Dennis C. Martin

    "One approach to stabilization of rock slopes is to place a buttress at the toe of the slope to provide additional resisting forces and increase the length and strength properties along the failure su

    Jan 1, 1986

  • CIM
    Optimal layout of underground mining levels

    By Jorgen Elbrond, Yve Lizotte

    "A mathematical procedure for determining the underground mining level layout which minimizes the total costs of excavation and haulage is described. This procedure has the advantage over previous gra

    Jan 1, 1985

  • CIM
    Modeling and Optimization of Rare Earth Mineral Flotation using Salicylhydroxamic Acid

    By Peter A. Amelunxen, Richard LaDouceur, Courtney A. Young

    "Many of the rare earth elements, the lanthanide series on the periodic table, are on the U.S. Department of Defense Strategic and Critical Materials list. In this regard, the U.S. Army Research Labor

    Jan 1, 2016

  • CIM
    The Estimation of Mineralized Veins: A Comparative Study of Direct and Indirect Approaches

    By A. Boucher, D. Marcotte

    "Abstract- The accepted practice for the estimation of thin (2D) vein deposits recommends the use of the grade x thickness service variable (i.e., the accumulation). Grade estimates are obtained indir

    Jan 1, 2001

  • CIM
    New Discoveries in the Relationship Between Macro and Micro Grindability

    By John Starkey

    This paper examines 5 years of SAGDesign testing data with particular emphasis on the grinding test results from two recent projects, the Fortune Minerals Limited NICO project, and the Aurora Energy R

    May 1, 2009

  • CIM
    General Discussion - Recent Trends in Crushing Plants

    "Chairman - To start this discussion off, I wonder if Mr. Dave Livingstone or Mr. Jeffrey of Granisle Copper would give a description of the crushing plant at Granisle since it is somewhat different f

    Jan 1, 1971

  • CIM
    Maximizing Performance of FRP Equipment in Copper Extraction

    By Jeffrey D. Eisenman

    FRP is a proven material for the solvent extraction processes of copper production. There is a history of successful applications of FRP piping and equipment in hydrometallurgical processing. The perf

    Jan 1, 2019

  • CIM
    Enhanced Leaching Of Chalcopyrite in Ferric Sulfate Media by the Presence of Iodide/Iodine

    By A. Miura, R. Winarko, D. B. Dreisinger

    Chalcopyrite leaching in acidic ferric sulfate media at ambient temperature exhibits slow kinetics and poor leaching efficiency, which is typically attributed to surface passivation. Recently, the pre

    Jan 1, 2019

  • CIM
    Weight Loss Measurements of Az31 as Cast and After Heat Treatment with the Use of Neutral Salt Spray Tests

    By J. Mizera, B. Adamczyk-Cieslak, K. J. Kurzydlowski, A. Dobkowska

    "AZ31 is the one of the most popular magnesium alloy using in the modern industry. It is well known, that compared with steel, magnesium alloys posse better properties, such as light mass, high specif

    Jan 1, 2016

  • CIM
    Some Factors Influencing the Rate of Dissolution of Gold in Sodium Cyanide Solutions

    By E. L. Day

    "In the early 1930s during the course of test work with a simple gold ore, it was evident that the time required to dissolve the gold by cyanidation was very much longer than should have been needed t

    Jan 1, 1967

  • CIM
    Limits of upgrading Eastern Canadian coals high in sulphur by washing

    "Eastern Canadian thermal coal mined at Minto, New Brunswick, and in western Cape Breton at St. Rose, Inverness County, Nova Scotia, contains 6-8 per cent sulphur. Both coals are high volatile bitumin

    Jan 1, 1981

  • CIM
    Overland conveyor systems

    By Donald C. Craighead

    "Overland conveyor systems to transport bulk materials from mines to processing plants or load-out stations have to be seriously considered as the viable alternative to truck and train haulage systems

    Jan 1, 1982

  • CIM
    What makes a mining project-financial options

    By R. R. Stone

    "This paper will examine the role of debt and equity in project financing and will illustrate the impact on the return to the project sponsor of each type. Conventional debt sources will be examined,

    Jan 1, 1980

  • CIM
    A Hybrid Flac3D-PFC3D Model to Study the Microseismic Response of Caprock

    By J. F. Hazzard, R. J. Chalaturnyk, C. Khazaei

    "Various measurement, monitoring and verification (MMV) techniques are used to ensure the safety of operations in petroleum projects. One of these techniques is microseismic (MS) monitoring of the cap

    Jan 1, 2015

  • CIM
    Unconformity-related uranium deposits, Athabasca area, Saskatchewan, and East Alligator Rivers area, Northern Territory, Australia

    By L. A. Clark, G. H. R. Burrill

    "Most unconformity-type uranium deposits in Saskatchewan occur within a few tens of metres above and/or below the basal unconformity of the 1,45-b.y. Athabasca Sandstone. Graphitic basement rocks coin

    Jan 1, 1981

  • CIM
    Some Aspects of Shaft Sinking on the Witwatersrand

    By Alan E. Gallie

    FOR many years the Witwatersrand has been the leading gold mining r camp in the world and, to a Canadian mining student, could not fail to be of overwhelming interest. The vast scale upon which the op

    Jan 1, 1937

  • CIM
    Geology of the Dawn Lake uranium deposits northern Saskatchewan

    By W. D. Fogwill, P. J. Clarke

    "The Dawn Lake uranium deposits are located 340 km north of La Ronge, Saskatchewan, in the Athabasca Basin between the Midwest Lake and Rabbit Lake deposits. Four zones of uranium mineralization, call

    Jan 1, 1986

  • CIM
    Cochenour Willans Mine (814c434a-01ee-4d21-97b6-2bee5eccf8f8)

    By J. P. Nowlan

    "This paper is an attempt to outline the structural problems at the Cochenour Willans mine, in so far as their details have been tentatively worked out. It must be emphasized that there are considerab

    Jan 1, 1954

  • CIM
    Overview of the Oil Sands Caprock Integrity Project

    By Kristine Haug

    Although most in situ operations in Alberta do not encounter significant problems during resource extraction, there have been a few documented occurrences of oil or steam releases as a result of compr

    Jun 1, 2012

  • CIM
    East Malartic Mine

    By J. M. Cormie

    "The orebodies of the East Malarcic mine are interesting from a geological standpoint because of the very small amount of vein quartz, the occurrence of much of the ore in soft greenstone schist, the

    Jan 1, 1954