Process Design Consideration for a Small Gold Mill in the Northwest TerritoriesBy A. M. Childs, R. F. Mather, K. R. Rawling
"The challenges encountered in the design and construction of mines and their process facilities today are becoming more intense and the engineering more competitive. The need to incorporate new techn
Jan 1, 1983
-
From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona MillBy Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux
"The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur
Jan 1, 2013
-
A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore"This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs
Jan 1, 1989
-
Prevention of corrosion in aircraft -an overview of the evolution of materials and protective treatmentsBy L. Salnais
"Aluminum alloy structural components f or aircraft designed prior to the early 1970s, were machined from 2024, 7075 and 7079 plate, bar and forgings in either the T3xxx of the T6xxx tempers. Protecti
Jan 1, 1988
-
The Recovery of Cobalt by the Soluble Cobaltic Ammine ProcessBy R. Stauffer, S. Lindsay
"Sherritt Gordon Mines Limited utilizes pressure hydro-metallurgical techniques to recover nickel, copper and cobalt from su1phidic concentrates, mattes and various other metal-bearing materials.A bri
Jan 1, 1967
-
Reducing CIP Tails Solution Losses at Goldcorp’s Campbell Processing FacilitiesBy Monique Pharand, Jeet Basi, Simon Hille
"High quality activated carbon is essential in the recovery of gold in Carbon-in-Leach (CIL), Carbon-in-Pulp (CIP), and Carbon-in-Column (CIC) circuits. Goldcorp’s Campbell complex at Red Lake Gold M
Jan 1, 2016
-
Impact of air distribution profile on banks in a Zn cleaning circuitBy R. Dahlke, J. A. Finch
A campaign was undertaken during the greater part of 2001 at Noranda’s Brunswick mine concentrator to investigate the role of gas (air) superficial rate (Jg) distribution to the cells in the final Zn
Jan 1, 2004
-
Raising a Blind Shaft Between Two Submarine Coal SeamsBy Jos. Kalbhenn
PART of the plan of re-allocation evolved by the engineers of the Dominion Steel and Coal Corporation in 1932 to retard the rapid advance of the submarine workings seawards was the opening of Dominion
Jan 1, 1944
-
Propriétés des roches et réponse du massif lors du minage sous contrainte modérée à élevée Partie A - Historique des travauxBy Denis Labrie
Le minage en profondeur sous contrainte modérée à élevée présente de nombreux défis aux opérateurs et aux ingénieurs de mine notamment au niveau du contrôle de terrain et de l?environnement minier sou
May 1, 2002
-
25 Years of Collector Development for Sulphide Mineral FlotationBy B. S. Fee, R. R. Klimpel
"Froth flotation is the most widely used and economic means of concentrating metal sulfide ores such as those containing copper, lead, zinc, nickel, molybdenum, and pyrite. Also recoverable are other
Jan 1, 1987
-
The Application of the Stackcell Technology for Fine Coal RecoveryBy E. S. Yan, R. Graley
"The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell
Jan 1, 2013
-
The Development of a Small-scale Test to Determine Work Index for High Pressure Grinding RollsBy Dave Bulled, Khiratt Husain
"The use of High Pressure Grinding Rolls is gaining significant interest as a replacement for SAG milling in the comminution of hard rock ores because of the potential for reduced costs in terms of en
Jan 1, 2008
-
An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, ManitobaBy Matthew Violot
Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened
Nov 1, 2011
-
Preparing a Long-Lasting Environmental Impact StatementBy Glen A. White
The level of impact and mitigating measures that are forecast in an environmental assessment (EA) for a new, or significantly modified, metallurgical processing facility or mine are taking on increasi
May 1, 2004
-
An Expert System Supervisor of a Flotation CircuitBy A. L. Mular, R. P. Edwards
"The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits
Jan 1, 1991
-
A fresh approach to mine organization and incentive planning based on experience at Campbell Chibougamau Mines Ltd. (now Campbell Resources Inc.)By J. G. Strasser
"There has been considerable output over the last three decades from the social sciences concerning man and his working environment. In the mining industry at large, however, authoritarian, hierarchic
Jan 1, 1981
-
The Bethlehem Molybdenum PlantBy E. A. Lowe, A. F. Bellamy, J. W. Smith
"In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall
Jan 1, 1980
-
The Recovery of Copper from Copper Oxide Ore using Heap Leaching, Solvent Extraction and ElectrowinningBy R. H. Walton
"In recent years the recovery of copper from low grade oxide ores has received widespread attention. The cost of treating such ores using conventional technology, such as milling and flotation, is fre
Jan 1, 1990
-
Reducing Selectivity in Narrow-Vein Mining through the Integration of Underground Pre-concentrationBy Andrew Bamber
The introduction of pre-concentration technology into the underground narrow-vein mining scenario has the potential to change the entire economics of utilizing bulk-mining methods in these situations.
Oct 1, 2004
-
Evaluating uncertainty in kimberlite pipe volume by simulating geometry in cylindrical coordinatesBy J. B. Boisvert, P. Oshust
A significant source of uncertainty in the diamond resource contained in kimberlite pipes is the volume of the pipes. Often the material within a pipe will be mined as ore, leaving the actual geometry