Establishing the Best Practice Guidelines in Mineral Processing for NI 43-101By Tony Lipiec, Chris Fleming, Larry Urbanoski
In 2009, the Canadian Mineral Processors (CMP) became aware that Canadian securities regulators were amending the contents of National Instrument 43-101. NI 43-101 is a set of regulations which establ
Jan 1, 2011
-
From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles ConcentratorBy Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin
"North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part
Jan 1, 2003
-
A New Curriculum Prepares Future Engineers in Mineral Processing and Extractive Metallurgy at Laval UniversityBy Daniel Hodouin, Claude Bazin, René del Villar
"A traditional linkage has long been established at Laval University's Department of Mining & Metallurgy between the Mineral Process (MP) and the Mining Exploitation (Min) on one hand, and between the
Jan 1, 1999
-
Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of CanadaBy Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie
"A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im
Jan 1, 2009
-
Marked Ball Wear TestingBy G. D. West, J. D. Purdue
"Marked Ball Wear Testing (MBWT) employs identified grinding balls which are placed in an operating mill for a period of time, retrieved from the mill, and then measured to determine the amount of wea
Jan 1, 1991
-
Learning From Experience: Aboriginal Programs In The Resource IndustriesBy Barrie Robb
Outline 1. Mackenzie Aboriginal Corporation (MAC) 2. ACR background 3. ?Learning from Experience? project - What - Why - lessons 3. How Industry could contribute to sustainable Aboriginal comm
May 1, 2008
-
A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand SilosA key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings
May 1, 2007
-
The Highmont Concentrator StartupBy R. S. Fukuhara, M. J. Allan
"Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the
Jan 1, 1982
-
Metallurgical Testwork on Harmony Project OreBy K. Gie Tan, Frank Wright
"Misty Mountain Gold Limited (MGL - TSE VSE, MGLCF - NASDAQ) of Vancouver, owns the Harmony Gold Project located in the Queen Charlotte Islands of British Columbia. The deposit contains a mineable res
Jan 1, 2000
-
Accounting for Dilution in Ore Resource EstimationBy Mario E. Rossi
The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization
May 1, 2009
-
Reduction in Dolomite Contamination in Pine Point Zinc ConcentrateBy D. A. Cormode
"INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 55 miles east of Hay River, N.W.T. by the southern shore of Great Slave Lake.The milling operation commenced in the fa
Jan 1, 1977
-
Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral ProcessingBy R. W. Lawrence
"In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc
Jan 1, 2007
-
Sustainable Manufacture: A Dilemma or Window of Opportunity?By M. H. Attia
The concept of sustainable development has been evolved into a working framework for sustainable manufacturing, in which the environmental requirements are introduced into product development at the d
Jan 1, 2006
-
Process Control at Heath Steele Mines LimitedBy Mike Sapiro
"Heath Steele Mines is a base metal producer situated near Newcastle, N.B. presently treating 3500 TPD of complex Cu-Pb-Zn ore. The ore consists of massive fine grained sulfides averaging I. 1% Cu, 1.
Jan 1, 1977
-
Residual Effects of Lognormality in Concentrator DataBy Norman O. Lotter, André R. Laplante
"The pursuit of concentrator surveying for purposes of metal accounting or process optimization has not yet connected with the well-published realm of geostatistics. The reality of lognormality in tim
Jan 1, 2005
-
Use of the Enviro-Clear Thickener at Quirke MillBy H. Ewaschuk
"INTRODUCTIONRio Algom's involvement with the Enviro-Clear thickener began in May 1975, when tests on a laboratory waif were carried out by our Research and Development group. Commencing in June, furt
Jan 1, 1977
-
Effective Methods of Arsenic Removal from Gold Mine WastesBy J. Lee, R. G. Rosehart
"The basic problem of arsenic contamination from mine water is discussed. Effective methods of removal involving chemical precipitation, activated carbon adsorption, ion exchange and reverse osmosis a
Jan 1, 1972
-
Gold "Preg-Robbing" by Pyrite: Natural and Process InducedBy Stephen L. Chryssoulis
"""Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l
Jan 1, 1997
-
Calibration of Level Detection Systems in Flotation Columns Using a Conductivity ProbeBy A. Uribe-Salas, J. A. Finch, B. J. Huls
Froth depth or interface level is an important control variable in column flotation which can influence both grade and recovery. A common method of locating the level is based on sensing the hydrostat
Jan 1, 1989
-
Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)By Dayang Datu Khalil, Charle Amoah, Fred Kock
Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe
Jan 1, 2012