Improving Mine/Mill Water Network Design by Reducing Water and Energy RequirementsBy M. Veiga
"Mining is an energy and water intensive activity. Increasing energy efficiency and reducing water consumption are two of the key requirements in moving toward a more sustainable mining industry. Wate
Jan 1, 2010
-
Successful Design of the NICO Grinding Circuit for Unusually Hard OreBy Mike Samuels, John Starkey
"This paper examines test results and grinding mill design for the recent Fortune Minerals’ NICO Project, located in the Northwest Territories. SAG milling and rod milling options are compared. Rod mi
Jan 1, 2010
-
Dust Control, Brenda Mines Limited, Peachland B.C.By J. W. Austin
"Introduction The Brenda dust collection system was originally designed to handle air at the 5000 ft. elevation with less than 1 grain of dust per cubic feet of air handled. The temperature variation
Jan 1, 1976
-
The Sizing and Operation of Crushing and Screening PlantsBy R. E. Jones
"Crusher sizing and application in mining operations is the selection of a crusher or a series of crushers to reduce run of mine ore to a size suitable for either autogenous or conventional grinding.
Jan 1, 1974
-
Caractérisation des environnements miniers menant à la corrosion des systèmes de soutènementBy Jean-François Dorion
La corrosivité des environnements miniers souterrains est un phénomène peu étudié au Canada. En plus de détériorer les systèmes de soutènement, la corrosion s?attaque aussi à divers installations et é
Feb 1, 2008
-
Towards Formalizing Qualitative Operations Input Data into Mine PlanningBy E. Lampard
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
May 1, 2011
-
The Nanisivik MillBy A. C. T. Bigg
"The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of
Jan 1, 1980
-
Maximisation des revenus et du rendement financier par l’optimisation de I’information, de la planification et des pratiques minières*By M. Vallée
"RÉSUMÉDurant les 10 dernières années, les améliorations dans le contrôle des limites des sautages et les arpentages après l’exploitation ont fourni des informations préalables et post facto sur les l
Jan 1, 2005
-
New Method for Controlling the Volumetric Filling Condition in a MillBy J. Miettunen
"The lining of a grinding mill has an important role in creating the conditions for the grinding process. The main purpose of the lining is to transfer the energy taken by the mill motor to the conten
Jan 1, 1991
-
Cyanidation of a High Gold Flotation ConcentrateBy J. A. King, D. A. Knight
"The Porgera orebody is located in mountainous terrain in Enga Province, Papua New Guinea. An underground mine has been developed which produces up to 2000 t/d of ore grading over 2 ozs Au/t. Some 79%
Jan 1, 1992
-
New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)By R. S. Simkus, J. R. Egan
"Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct
Jan 1, 1994
-
Centrifugal Concentration and Separation of Precious OresBy B. V. Knelson
"GENTLEMEN:This paper will deal with centrifugal separation - theory and practical, and since the Knelson Concentrator is the only centrifugal concentrator with a properly fluidized bed, this paper wi
Jan 1, 1985
-
Regulation and the Regulatory Process in the Mineral IndustryBy F. C. Lendrum
"This paper had its origin in a panel discussion organized by the Canadian Uranium Producers Metallurgical Committee (CUPMC) at their Annual Meeting in Blind River in May, 1964. The reason for the pan
Jan 1, 1986
-
Factors Affecting the Dissolution of Gold from Refractory Flotation TailingsBy H. U. Ross
"INTRODUCTION Extensive studies have been carried on pure gold to determine the various factors that affect its dissolution in alkaline cyanide solutions. With the extension of milling to refractory o
Jan 1, 1973
-
Phoenix Copper Leach - Cathode Eight Years in the MakingBy A. R. House, G. W. Shepherd
Newmont USA Limited owns and operates the Phoenix Mine near Battle Mountain, Nevada, USA. The existing milling facility has operated since 2006 (House, 2010). Following the startup of the milling oper
Jan 1, 2014
-
Crystallex’s Las Cristinas Gold Project (7d5d7696-3ce9-4e3a-a905-204bcf9d3fae)By J. R. Goode
"The Las Cristinas deposit contains about 10.2 million ounces of gold at a grade of 1.3 g/t. The deposit comprises a layer of fully oxidized saprolite (SAPO), a layer of sulphide-enriched saprolite (S
Jan 1, 2004
-
Comminution Circuit Comparison Conventional versus Semi-AutogenousBy G. H. Babcock, D. A. Knight, V. G. Medina
"Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group
Jan 1, 1991
-
Effect of Gravity Recovery on Overall Plant Recovery. Sadiola – A Case Study (998ef7ed-734f-4917-a31d-ff2d1cd09bd4)By Craig Naudé
"An enhanced gravity concentrator was installed in conjunction with an Intensive Leach Reactor at the Sadiola plant in Mali last year and commissioned in Dec 2007.There has been much debate over the y
Jan 1, 2009
-
Continuous SAG Volumetric Charge MeasurementBy Andre Vien, Jean-François Dupont
"Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This p
Jan 1, 2001
-
Toppling failure — A proposed analytic solutionBy J. I. Mathis
"The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was
Jan 1, 2004