Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The McArthur Lead-Zinc-Silver DepositBy S Jephcott
The McArthur lead-zinc-silver deposit is of the stratiform type. It consists of a mineralised bituminous shale sequence containing some tuffites, numerous graded beds and isolated slump breccia horizo
Jan 1, 1971
-
Digital Simulation of Particulate ProcessesDigital Simulation of Particulate Processes The inherent complexity of mineral particulates (shape, size and mineralogical texture) has challenged conventional simulation model approaches for decades
Sep 13, 2010
-
Bubble Flow Pattern Detection in the Water Model of a Metal Treatment UnitBy J J. J Chen, J C. Zhao
A water/air model was developed to simulate the refining of molten aluminium by the sparging of gas through an impeller. The optimal gas dispersion depends upon selecting the correct gas rate for a gi
Jan 1, 1995
-
Geoscience input into blasting operations – let’s set a new standardBy T N. Little
The author contends that geoscience is presently under-utilised in the rock fragmentation by blasting process. Before we can set standards in this area, the following is required: mine geologists need
Sep 20, 2017
-
The Purification of Low-Grade Quartz Ore by Flotation and its MechanismThe Purification of Low-Grade Quartz Ore by Flotation and its Mechanism
Sep 13, 2010
-
Pilbara creek diversions – resilience gained through increased ore recovery and an integrated approach to designBy M Rafty, A Markham, S Atkinson, M Heyting
Over recent years there has been a significant increase in the number of miners in the Pilbara region of Western Australia targeting channel iron deposits (CID) located in valleys, intersected by ephe
Jul 24, 2017
-
Tunnelling in the Snowy Mountains AreaSome 50 miles of tunnel have been driven in the Snowy Mountains Area since tunnelling commenced in 1951. Hates have improved progressively due to the know-how of American supervision and use of large
Jan 1, 1963
-
Study on the Reasonable Mineral Processing Technology of a Cu-Mo OreStudy on the Reasonable Mineral Processing Technology of a Cu-Mo Ore
Sep 13, 2010
-
Geostatistical Calculations using True and Estimated Values from a Simulated DepositKnowledge of true block grades is obtained from a mathematical model of an orebody, simulated with sample grades normally distributed and spatially correlated according io a spherical semi-variogram m
Jan 1, 1978
-
Geophysical Signatures of Andesite Volcanoes in New Zealand - Contrasts and Structural ImplicationsBy C A. Locke
Geophysical signatures of the Taranaki and Tongariro volcanoes reflect similarities in their age, composition and hydrothermal histories, but also reflect differences in host rock settings and edifice
Jan 1, 1995
-
The Sealing , Re-Opening, and Recovery of Aberdare North Colliery, N.S.W., Following the Occurrence of a Spontaneous HeatingBy Sneddon N
In November, 1975, Aberdare North colliery was sealed at the surface to extinguish an open fire underground.The fire had developed from a spontaneous heating in one of the open goaf areas of the mine.
Jan 1, 1978
-
Geometallurgical Study of Copper Oxide Mineralisation Hosted in Gravels of Different Physical QualityGeometallurgical Study of Copper Oxide Mineralisation Hosted in Gravels of Different Physical Quality
Sep 13, 2010
-
The Influence of Composition on the Properties of Lead Part VIIIBy Orr C. W
Continuing the systematic investigation of the influence of elements on the properties of lead(1). If the effects of additions of copper (up to 0.3%) on Port Pirie lead have now been determined in so
Jan 1, 1938
-
The discovery of the QTS Central ore system, CSA mine, Cobar, NSW, AustraliaBy E Apaza, R Neumayr
This paper aims to summarise the discovery of the QTS Central resource, a previously unidentified +1 Mt inferred resource that lies between two major CSA resource systems.The 1.7 Mt at 5.76 per cent C
Sep 20, 2017
-
Mineral Resources Work at the Institute of Geological and Nuclear SciencesBy A B. Christie
The Institute of Geological and Nuclear Sciences' Mineral Resources Programme is currently carrying out research under two major projects: HAREM (Hauraki Andesite Rhyolite Epithennal Miner
Jan 1, 1994
-
CRIMM - A New Process for Production of Directly Reduced Iron with Coal-Based Rotary KilnBy Sheng-Hui X
This paper introduces a new coal-based rotary kiln process of DRI production - the CRIMM process, which is developed by Changsha Research Institute of Mining and Metallurgy in the past years. Its ma
Jan 1, 1999
-
Development of New Comminution Testing Methodologies for Geometallurgical Mapping of Ore Hardness and ThroughputDevelopment of New Comminution Testing Methodologies for Geometallurgical Mapping of Ore Hardness and Throughput The emerging discipline of 'geometallurgy' is becoming increasingly recognis
Sep 13, 2010
-
Recycling of Sludge from the Production of ManganeseRecycling of Sludge from the Production of Manganese
Sep 13, 2010
-
Gold, Silver and Base Metal Deposits of the Chillagoe District, Australia: Hypothermal to Epithermal OverprintingBy J E. Nethery
At the Red Dome and Mungana deposits in north Queensland, Australia, it is proposed that mineralisation and alteration developed as a 'telescoped' overprinting continuum, ranging in style fr
Jan 1, 1995
-
A Geological Structural Assessment at Appin Colliery with Reference to Roof Failure and Directional MiningAt Appin colliery, geological structural analyses and investigations of roof conditions suggest roof failure may be attributed to vectorial stresses acting on underground openings, and inducing moveme
Jan 1, 1970