Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Learning from Simulation at Boddington Gold Mine

    Various methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity

    Sep 26, 2011

  • AUSIMM
    Parametric study of flotation with acoustic sound

    By B Yang, L Wang, C Y. Ng

    Flotation process intensification is often achieved through changing chemical reagent scheme or flotation machine or both, which likely brings a hefty burden to the flotation plants in terms of capita

    Aug 24, 2022

  • AUSIMM
    Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels

    By R Lau

    The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres

    Mar 8, 2011

  • AUSIMM
    Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and Delivery

    By C Tickell

    Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the

    May 9, 2016

  • AUSIMM
    Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical Techniques

    By D J. Bradshaw, B Lottermoser, A Parbhakar-Fox

    "Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency

    Sep 29, 2013

  • AUSIMM
    Practical Management of Progressive Large Failures at Minerals and Metals Group Century Mine

    Minerals and Metals Group (MMG) Century mine (Century) is a large open-cut mine in northwest Queensland approximately 2.5 km long, 1.5 km wide and 240 m deep, with an ultimate pit depth of 320 m. In 2

    May 1, 2010

  • AUSIMM
    Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States Perspective

    By V Pfannenstiel

    The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental

    Jul 10, 2012

  • AUSIMM
    Chronostatistics ù A Powerful, Pragmatic New Science for Metallurgists

    Forty years ago Dr Pierre M Gy, a metallurgist, introduced variography as applied to monitoring a process. Consequently, his followers used the variogram to elaborate meaningful process control charts

    Jan 1, 2006

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    New Rosebery - Discovering the Next 20 Years

    Rosebery Mine is situated on the west coast of Tasmania and is AustraliaÆs largest volcanic-hosted base and precious metals deposit (zinc, lead, copper, gold and silver). The milling operation has bee

    Jan 1, 2008

  • AUSIMM
    Water Management at BHP Billiton Olympic Dam

    BHP Billiton Olympic Dam produces copper cathode, uranium oxide concentrate and refined gold and silver. The operation is comprised of an underground Mine and Processing Plant and is located 560 km no

    Jan 1, 2006

  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    Applying universal and equitable design principles for equity and inclusion in mining

    By Y Lanwin

    The Australian mining industry, a cornerstone of the nation’s economy, is on a journey towards greater equity and inclusion. Th paper introduces a comprehensive exploration of how universal design pri

    Apr 16, 2024

  • AUSIMM
    On the Use of Mechanistic Blast-Outcome Measurement and Modelling for Optimisation of Explosive Selection in Underground Mining

    By A S. Lund

    Optimisation of the underground mining production process benefits from informed decision making during the process of explosive rock fragmentation. Selection of the most appropriate bulk explosive pr

    Jan 1, 2001

  • AUSIMM
    Characterisation of respirable dust generated from full scale laboratory concrete cutting tests with conical picks at three stages of wear

    By S Slouka

    Airborne rock dust poses serious long-term health complications to workers in the underground mining and civil environment where rock excavation is utilised. During drilling, airborne rock particles a

    Oct 12, 2022

  • AUSIMM
    A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective

    By A E. A Northcote

    The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou

    Mar 21, 2011

  • AUSIMM
    Thermal Fragmentation - An Innovative Process for Mining Narrow High-Grade Precious Metal Veins

    The mining of high-grade narrow vein deposits is a predominant field of activity in the precious metal sector. These types of deposits are located throughout the globe and have a significant presence

    Jan 1, 2008

  • AUSIMM
    Developments in Explosive SupplierûCustomer Relationships

    The original and most basic relationship between mining company and explosive supplier was a simple one of consumer and product supplier. The divide between the two was quite clear-cut with neither ta

    Jan 1, 2004

  • AUSIMM
    Examples of Groundwater Sustainability Issues in Mining

    For Australian mining projects, sustainable groundwater use is typically defined as a groundwater extraction regime, measured over a specified planning time frame, which allows acceptable levels of st

    Jan 1, 2006

  • AUSIMM
    Tailings governance

    By T Alexieva

    Since the early 1900s the geotechnical community has investigated every significant failure of a tailings dam, improved our knowledge of the behaviour of the tailings storage facilities, developed ana

    Jul 23, 2018