Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Behaviour of Sulphur in the Sherritt Zinc Pressure Leach Process

    By Collins M. J, Ozberk E

    A major advantage of the Sherritt Zinc Pressure Leach Process is the conversion of sulphide sulphur in zinc concentrate to elemental sulphur during pressure leaching. Elemental sulphur can be recove

    Jan 1, 1993

  • AUSIMM
    Olympic Dam Project

    The Olympic Dam copper-uranium-gold-silver deposit, located 520 km NNW of Adelaide, S.A. was discovered by Western Mining Corporation Ltd in 1975, and is now being developed as a joint venture betw

    Jan 1, 1988

  • AUSIMM
    Predicting Slope Stability in Open Pit Gold and Coal Mines

    By L Clarke, R N. Campbell, F Bourke, J Anderson

    Lithological units have been classified geotechnically with mechanical tests and discontinuity measurements from the GRD Macraes Limited, Macraes Gold Project and Rotowaro coal mine open pits, New Zea

    Jan 1, 2000

  • AUSIMM
    Turning Ideas into Gold Bars

    The invitation to speak today was in the form of a single sentence instruction: How does your company run and how do you communicate from top to bottom? It looks like I'll have to let you into

    Jan 1, 1995

  • AUSIMM
    Pressure oxidation circuit design for the Lihir Project, Papua New Guinea

    The Lihir deposit in Papua New Guinea (PNG) contains an estimated mineable reserve of 454t (14.6M oz) of gold in refractory sulphide ore. The Lihir Joint Venture has submitted a proposal to the PNG Go

    Jan 1, 1994

  • AUSIMM
    The Failure of Steel Rock Drill Rods by Fatigue

    A sample of fifty fractured low chromium-molybdenum alloy drill steel rods was investigated. Each rod was of the forged collar integral tungsten carbide type in common use in Australia.Examination of

    Jan 1, 1955

  • AUSIMM
    Ore Block Design in Narrow Vein Gold Deposits – Estimate or Simulate?

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    In narrow orebodies the use of ordinary kriging (OK) may pose certain limitations when used for grade control modelling. The smoothing effect of kriging, by its very nature, cannot retain or accuratel

    Aug 18, 2014

  • AUSIMM
    The Primary Framework for the Mechanism of the Mine Reclamation Monitoring in China

    By Y Zhou, Y Liu, J-P Yang, P Wang, K Hu

    "Large-scale mine reclamation has taken place recently in response to the implementation of mining regulations in China. Effective monitoring of the progress of reclaimed land is a critical procedure

    Jul 10, 2012

  • AUSIMM
    Sampling the Settler of the Kalgoorlie Nickel Smelter

    By Reed M. E, Cloutt B

    Particulate samples were taken from the gas space in the settler of the Kalgoorlie nickel smelter using a vertical sampling probe and a specially designed isokinetic sampling probe which also quench

    Jan 1, 1991

  • AUSIMM
    Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume Highway

    By S J. Clarke, C S. Walker

    The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de

    Sep 17, 2014

  • AUSIMM
    Evolution of rock fill consolidation at Pajingo Gold Mine

    By J Carswell, K McTyer

    The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product

    Nov 30, 2018

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Attritioner Scrubber Performance Evaluation

    By O S. Maluleke

    In some deposits valuable heavy mineral quality is poor due to increased mineral surface coatings from higher slimes and more competent sand orebodies. Mineral surface coating can include silica or al

    Oct 5, 2011

  • AUSIMM
    Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western Australia

    By Whitham M

    Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r

    Jan 1, 1991

  • AUSIMM
    Applications of Fluid Dynamics to Petrology and Ore Genesis

    Laboratory experiments have been used tostudy a wide range of convective processes which are significant for the formation of rocks and the ores that form in them. Metal-rich solutions flowing through

    Jan 1, 1990

  • AUSIMM
    The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist Installation

    The hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista

    Jan 1, 2005

  • AUSIMM
    Minerology of some Ceramic Clays from the Adelaide Area

    By Nickson NM, Lancucki CJ

    X-ray diffraction and differential thermal methodshave been used to determine the mineralogy of some clays used by the heavy clay industry in the Adelaide area. A detailed analysis has been made of th

    Jan 1, 1963

  • AUSIMM
    Design, Commissioning and Operation of Elura's Larox Pressure Filters

    By Jagger ND

    Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain

    Jan 1, 1985

  • AUSIMM
    Integrated Communications for Surface and Open Pit Applications

    By G Booth

    Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope

    Jan 1, 2008

  • AUSIMM
    Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape Optimiser

    By C Mann, S Swapp

    "The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th

    Nov 15, 2016